Centurion SECTOR Series Manuale utente

SECTOR installation manual
HIGH-VOLUME
INDUSTRIAL
TRAFFIC
BARRIER
TM

Company ProfileCompany Profile
CENTURION SYSTEMS (Pty) Ltd reserves the right to make changes to the products described in this manual without notice
and without obligation of CENTURION SYSTEMS (Pty) Ltd to notify any persons of any such revisions or changes.
Additionally, CENTURION SYSTEMS (Pty) Ltd makes no representations or warranties with respect to this manual.
No part of this document may be copied, stored in a retrieval system or transmitted in any form or by any means electronic,
mechanical, optical or photographic, without the express prior written consent of CENTURION SYSTEMS (Pty) Ltd
Sales and technical support
to over 50 countries
worldwide
100%
testing to
specifications
In-house
R & D
development
team
Manufacture to
international
quality standard
ISO 9001:2008
1986 1990 1995 1999
Competent
after-sales
technical support
Centurion Systems
today

Contents
IMPORTANT SAFETY INSTRUCTIONS page 3
page 1
page 2
page 2
Mechanical Setup
Electrical Setup
Commissioning and Handover
1. Declaration of conformity
2. General description
Lightning protection
3. Specifications
Physical dimensions
Technical specifications
Barrier housing specifications
Barrier pole specifications
Fuse protection
4. Icons used in this booklet
5. Product identification
6. Required tools and equipment
7. Preparation of site
General considerations for the installations
8. Loop detectors and associated functionality
FLUX OB features
FLUX OB diagnostics
9. Selecting Operating Mode
Simplex Mode
Complex Mode
PLC Mode
10. Cabling requirements
Simplex Mode
Complex Mode (basic)
Free-exit for uni-directional traffic
Free-exit for bi-directional traffic
11. Orientation
Left hand
Right hand
12. Conversion from right hand to left hand
Remove the coupler
Fit the coupler
13. SECTOR installation
Enclosure positioning
page 5
page 6
page 6
page 7
page 7
page 7
page 8
page 8
page 8
page 9
page 10
page 11
page 12
page 12
page 13
page 13
page 15
page 17
page 17
page 17
page 18
page 19
page 19
page 19
page 19
page 20
page 21
page 21
page 22
page 23
page 24
page 25
page 26
page 26

Concrete plinth/foundation
Fitting the pole
Levelling the boom pole
Balancing the spring
Failsafe/Lock Mode
Manual release
14. Electrical setup
Connecting all wiring
15. Simple Mode: Option 1 (recommended) electrical connections
16. Simple Mode: Option 2 - electrical connections
17. Complex Mode: Option 1 (basic) electrical connections
18. Complex Mode: Option 1 (Tickect vend) electrical connections
19. Free-exit loop - electrical connections
20. Setting up the limits and features for the SECTOR barrier
Setting up the limits
21. SECTOR menu navigation
22. SECTOR controller features
23. Diagnostics
Diagnostic LEDs
LCD display
Buzzer feedback
24. Factory defaults schedule
25. Description of terminal functions
26. Faultfinders guide
Procedure A - Low battery voltage condition
Procedure B - False collision detection
27. Peripheral equipment
28. Installation handover
page 26
page 27
page 28
page 28
page 29
page 29
page 30
page 30
page 31
page 33
page 35
page 37
page 38
page 39
page 39
page 41
page 44
page 50
page 50
page 51
page 52
page 53
page 55
page 57
page 57
page 58
page 59
page 61

Mechanical setup
Heed necessary site considerations Page 12
Check cabling requirements Page 19
Gather required tools and equipment Page 11
Set the concrete foundation Page 26
SECTOR enclosure positioning Page 26
Fit the pole Page 27
Level the boom pole Page 28
Balance the spring Page 28
These abbreviated instructions are for the experienced
installer who needs a checklist to get a standard installation
up and running in the minimum of time.
Detailed installation features and functions are referred to
later in this manual.
Page 1

Connect all wiring Page 30
Page 39
Page 41
Page 61
step
9
Electrical setup
Page 2
step
10
Set the limits and features
step
12
Carry out professional
handover to client
Commissioning
and handover
step
11
Set additional features via the
menus, if required

Warnings for the installer
CAREFULLY READ AND FOLLOW ALL INSTRUCTIONS
beforebeginningto install the product.
!All installation, repair, and service work to this product must
becarriedout bya suitably qualified person
!Do not activate your barrier unless you can see it and can
determine that its area of travel is clear of people, pets, or
otherobstructions
!NO ONE MAY CROSS THE PATH OF A MOVING BARRIER
Always keep people and objects away from the barrier and its
areaoftravel
!NEVER LET CHILDREN OPERATE OR PLAY WITH THE
BARRIER CONTROLS
!Secure all easily accessed barrier controls in order to prevent
unauthorizeduseofthebarrier
!Do not in any way modify the components of the automated
system
!Do not install the equipment in an explosive atmosphere: the
presence of flammable gasses or fumes is a serious danger to
safety
!Before attempting any work on the system, cut electrical
powerto the operatoranddisconnectthebatteries
!The mains power supply of the automated system must be
fitted with an all-pole switch with contact opening distance of
3mm or greater. Use of a 5A thermal breaker with all-pole
circuitbreakis recommended
!Make sure that an earth leakage circuit breaker with a
thresholdof30mAis fitted upstream of the system
!Never short circuit the battery and do not try to recharge
the batteries with power supply units other than that
supplied with the product, or by Centurion Systems
IMPORTANT
Safety Instructions
ATTENTION
To ensure the safety of people, it is important that you
read all the following instructions. Incorrect
installation or incorrect use of the product could cause
serious harm to people.
The installer, being either professional or DIY, is the
last person on the site who can ensure that the
operator is safely installed, and that the whole system
can be operated safely.
Page 3

!Make sure that the earthing system is correctly
constructed, and that all metal parts of the system are
suitably earthed
!Safety devices must be fitted to the installation to guard
against mechanical movement risks, such as crushing,
dragging and shearing
!It is recommended that at least one warning indicator light
be fitted to every system
!Always fit the warning signs visibly to the inside and outside
of the barrier
!The installer must explain and demonstrate the manual
operation of the barrier in case of an emergency, and must
hand the User Guide over to the user
!Explain these safety instructions to all persons authorized
to use this barrier, and be sure that they understand the
hazards associated with automated gates
!Do not leave packing materials (plastic, polystyrene, etc.)
within reach of children as such materials are potential
sources of danger
!Dispose of all waste products like packaging materials,
worn out batteries, etc. according to local regulations
!Always check the obstruction detection system, and safety
devices for correct operation
!Centurion Systems does not accept any liability caused by
improper use of the product, or for use other than that for
which the automated system was intended
!This product was designed and built strictly for the use
indicated in this documentation. Any other use, not
expressly indicated here, could compromise the service
life/operation of the product and/or be a source of danger
Everything not expressly specified in these instructions
is not permitted.
Page 4
MOVING BARRIER CAN CAUSE SERIOUS INJURY OR DEATH
KEEP AWAY! THE BARRIER MAY MOVE AT ANY TIME
DO NOT ALLOW CHILDREN TO PLAY IN THE AREA
OR OPERATE BARRIER

Page 5
1. Declaration of conformity
Manufacturer:
Declares that the product:
Conforms with the following specifications:
Standard to which conformity is declared:
Centurion Systems (Pty) Ltd
Unit 13 Production Park
Intersection Newmarket Road & Epsom Avenue
North Riding
Gauteng
South Africa
Product name: SECTOR Traffic barrier
Product options: All variants
Safety: IEC 61010-1:2001
Emissions: CISPR 22 CLASS B: Radiated emissions – 150MHz to 1GHz
CISPR 22 CLASS B: Conducted emissions – 150 KHz to 1GHz
Immunity: IEC 61000-4-2 – Electrostatic discharge
IEC 61000-4-3 – Radiated immunity – 80MHz to 1000MHz
IEC 61000-4-4 – Electrical fast transients/burst
IEC 61000-4-5 – Surge immunity test
IEC 61000-4-6 – Conducted immunity – 150KHz to 80MHz
IEC 61000-4-8 – Power frequency magnetic field
IEC 61000-4-11– Voltage dips and interruption
IEC 61010-1:2001 Safety
IEC 61000-6-3:2006 Emissions
IEC 61000-6-1:2005 Immunity
Signed at North Riding, South Africa on December 1, 2010
Ian Rozowsky
Research & Development Director.

The SECTOR barrier has been designed to safely and cost-effectively apply high-duty
vehicular access control to roadways between 3m and 6m wide. The battery backed up
system ensures continued operation in the event of a power failure. The failsafe position
and collision detection system has been designed and tested to set the standard in safety
of operation and to provide an unparalleled level of reliability and durability in operation.
The pole travel limits are managed by a sealed opto-electronic system that ensures
precise position and trajectory control. Accurate and reliable collision detection ensures
safe operation even under trying conditions. A precision die-cast gearbox and novel
speed and trajectory control algorithm ensures smooth and rapid operation even after
many years of service. The splined output coupler eliminates pole droop over time. The
SECTOR control card has been designed to be easy and intuitive to use with helpful
instructions on the status of the operation during and after installation.
Some of the advanced features offered by the SECTOR controller are:
!Interactive graphical user interface via a backlit LCD display to facilitate and simplify
the installation process
!Fully automated single button limit setup
!Independent Memory Input, Non-Memory Input, Barrier Raise and Barrier Lower Inputs
!Advanced closed-loop speed control to maintain safe and reliable operation in windy
conditions
!Independent control of Opening and Closing speeds
!Selectable and adjustable Autolower
!Selectable mains failure raise
!Smooth, adjustable start/stop (ramp-up and ramp-down)
!Multiple Operating Profiles
!Onboard CENTURION receiver with full channel mapping capability (limited to 500
buttons)
!A status LED output to indicate the barrier status remotely
!Advanced and proven lightning protection
The SECTOR electronic controller utilises the same proven surge protection philosophy
that is used in all CENTURION products. While this does not guarantee that the unit will
not be damaged in the event of a lightning strike or power surge, it greatly reduces the
likelihood of such damage occurring. The earth return for the surge protection is provided
via the mains power supply earth.
Lightning Protection
2. General description
Page 6
In order to ensure that the surge protection is effective, it is essential that the
unit is properly earthed.