
Nitrogen generator N2 LCMS 1
9
4.3.
neumatic connections
4.3.1.
Nitrogen Outlet
The distribution line ust be ade of pipelines suitable for a pressure of at least
11 bar.
The pipe dia eter ust be sized on the basis of the acceptable pressure drop
values of the utility. Pipelines with an internal dia eter of at least 8 are re-
co ended (e.g. polya ide pipe 10x8 ).
e
If gas is delivered to a line that has not been thoroughly checked for cleanliness,
to avoid the collection and transfer of undesired substances in the nitrogen (oil
residue fro pipe processing, dust, scale, hu idity) and ti es require to obtain
no inal purity are prolonged, cleaning is reco ended, or ensure that pre-
washed and treated pipelines are used when laying the gas distribution lines.
CONNECTION
• Locate the nitrogen coupling (G 1/4 fe ale), arked “OUTLET” at the rear of
the generator.
• Connect the line.
4.4.
Drain
CONNECTION
• Locale the “DRAIN” outlet at the rear of the generator;
• ount the on/off valve and close it (supplied with the generator);
• connect the polya ide pipe 4x1 (supplied with the generator);
• route the other end of the pipe into the condensate collection container.
4.5.
Electric power supply
c
For reasons of safety, the following instructions must be strictly obser-
ved.
The electrical installation ust co ply with current standards, in particular re-
garding the protection line.
c
Recommendations for correct installation:
• do not use extension leads, adaptors or ultiple sockets; if necessary, replace
the plug IEC350-Schuko with a ore suitable version;
• always connect the protection wire;
• the ains socket ust be located in an easily accessible position.