EMC Connectrix DS-32M2 Manuale utente

1
This document explains the power, cooling, weight, and rack placement
requirements for the EMC departmental switches listed below. It also
describes the kits available for mounting them in EMC and non-EMC
racks and includes installation instructions as well.
Major sections are
• Device Power, Cooling, and Weight Information................................. 2
• Device Dimensions.................................................................................... 2
• Device Placement Requirements............................................................. 2
• Switch Mounting Kit (DS-16M or DS-32M)........................................... 3
• Installing the DS-16M and DS-32M Rails............................................... 5
• Installing the DS-16M2 and DS-32M2 Switches.................................. 17
EMC Departmental Switches
DS-16M2 and DS-32M2
Installation Guide
P/N 014003063
REV A02
August 1, 2002
Device Device Model Mounting Kit Model
16-Port Departmental Switch (2Gb) DS-16M2-0D DS16M-CRKH/CRKL
32-Port Departmental Switch (2Gb) DS-32M2-0D DS32M-CRKH/CRKL

2
EMC Departmental Switches DS-16M2 and DS-32M2 Installation Guide
Device Power, Cooling, and Weight Information
Device Power, Cooling, and Weight Information
Device Dimensions
Device Placement Requirements
The DS-16M2 switches must be located at the top of the rack/cabinet,
because the power cord routing for these switches runs across the top
of the uppermost switch. There are no restrictions on the location of
the DS-32M2 switches in the rack/cabinet.
Power distribution must support the number of outlets required for
the switch and the switch power rating listed in the table on page 2.
Device Power Requirements Cooling Requirements
(Heat Dissipation) Maximum Weight
DS-16M2 switch Voltage: 100 to 230 V ac, 47 to 63 Hz
5 amperes max
2 ac power cords per unit
410 BTU/hr 11.8 kg (26 lb)
DS-32M2 switch Voltage: 100 to 230 V ac, 47 to 63 Hz
5 amperes max
2 ac power cords per unit
836 BTU/hr 15.4 kg (34 lb)
Device Height Depth Width
DS-16M2 Switch 1.0 U 1.7 in 4.3 cm 25 in 63.5 cm 17.5 in 44.5 cm
DS-32M2 Switch 1.5 U 2.55 in 6.47 cm 25.1 in 63.75 cm 17.5 in 44.5 cm

EMC Departmental Switches DS-16M2 and DS-32M2 Installation Guide
3
Switch Mounting Kit (DS-16M or DS-32M)
Switch Mounting Kit (DS-16M or DS-32M)
The DS16- and DS32-CRKH kits contain the16- or 32-port standard switch
rail mounting kits, and the DS16- and DS32-CRKL kits contain the 16- or
32-port low protrusion rail mounting kits.
Component Use
2 mounting brackets - see illustration on page 17. 2 per switch
2 short rail assemblies (20.5 inches to 27 inches)- see illustration on
page 6 or page 12
or
2 long rail assemblies (27 inches to 34 inches)- see illustration on
page 6 or page 12
2 per switch
#10 flat washer
M5 kep nut 2 per rail assembly to secure adjustable
rail to the “C” channel.
6-32 x .31 screws 5 thread-forming screws per bracket to
secure bracket to switch (10)
or
5 non thread-forming screws per
bracket to secure the bracket to the
switch (10)
Note: The kits include two (2) bags of
6-32 x .31 screws. Be sure to check the
labeling on the bags and the chassis
number label located on the back and
bottom of the chassis to ensure that you
use the correct screws for your chassis.
M5 x 12 mm screws 4 per rail for DS-16M in round-hole
channels (8)
3 per rail for DS-32M in round-hole
channels (6)
Square-hole washer
M5 x 16 mm screws 4 per rail for DS-16M in square-hole
channels (8)
3 per rail for DS-32M in square-hole
channels (6)
M3 x 8 mm screws 1 per bracket, used to secure brackets
to the rails (2)

4
EMC Departmental Switches DS-16M2 and DS-32M2 Installation Guide
Switch Mounting Kit (DS-16M or DS-32M)
Tools Required for Installation
You will need to have the following tools available to complete the
installation of the rails and switch(es).
◆# 1 Phillips head screwdriver
◆1/4-in. nut driver
◆5/16-in. nut driver
#10 washers
ball studs
1 washer and 1 ball stud per rail to hold
bezel (2)
39U bezel only
Latch brackets and keyplate spacers 2 each to secure 1U bezel for 16M
switch in 40U cabinets
Left and right latch brackets 1 left and 1 right to secure 2U bezel for
32M switch in 40U cabinet
1U or 2U, low-profile or standard-profile bezel (front rack panel) 1 per switch
Two 7-foot USA power cords, straight C13 to N5-15P straight
Two 6-foot IEC power cords, straight C13 to C14 straight 2 per switch
(use the ones appropriate for your PDU)
Component Use

EMC Departmental Switches DS-16M2 and DS-32M2 Installation Guide
5
Installing the DS-16M and DS-32M Rails
Installing the DS-16M and DS-32M Rails
This section describes the installation procedures for the DS-16M and
DS-32M rails. The figures below show a front and rear view of four
sets of rails installed in a 39U rack. Note that the rack is shown
without the side skins.
Front View
Rear View

6
EMC Departmental Switches DS-16M2 and DS-32M2 Installation Guide
Installing the DS-16M and DS-32M Rails
DS-16M Rails Installation
There are two different length rails: The short rails range between
20.5 inches to 27 inches. The long rails range from 27 inches to 34
inches. Each kit contains two different length rear rail mounts. Use
the rail length that is appropriate for your rack/cabinet.
The front and rear flanges of the DS-16M rails have three screw holes.
See the figure below.
If you are installing both a DS-16M2 and DS-32M2 switch, the DS-16M2
should be positioned at the top of the rack/cabinet, located above the
DS-32M2 switch.
Select the appropriate length rails, and follow the steps below to
install them.
DS-16M Short Rails (for the CLARiiON Rack/Cabinet)
Front
Rear
DS-16M Long Rails (for 3rd Party Racks/Cabinets) Rear
Front
DS-16M Front Flange DS-16M Rear (u-shaped) Flange

EMC Departmental Switches DS-16M2 and DS-32M2 Installation Guide
7
Installing the DS-16M and DS-32M Rails
1. Assemble the rails.
The rails assembly consists of an adjustable rail, a C channel, and
two washers and kep nuts. See the figure below.
a. Insert the threaded posts on the C channel into the slot on the
adjustable rail.
b. Secure the adjustable rail to the C channel with two #10 flat
washers and M5 kep nuts. Leave the nuts finger tight.
2. Determine where in the rack/cabinet you are going to locate the
switch.
The left/right orientation of the rails is determined by the
location of the word “top” on the C channel. The rail is oriented
correctly when this word “top” is up and toward the rack/cabinet
front. See the next figure.
C channel
Adjustable
rail
Attach washers\nuts
to threaded posts

8
EMC Departmental Switches DS-16M2 and DS-32M2 Installation Guide
Installing the DS-16M and DS-32M Rails
3. Adjust the length of the rail to fit between the channels in the
rack/cabinet.
NOTE: The rail flanges go to the inside of the channels.
4. Once the rails are adjusted to the correct length, tighten the kep
nuts on the rail assembly.
NOTE: If the side skins are removed on the rack/cabinet, you can tighten
the kep nuts after you install the rails.
5. Align the holes of the front rail flange to the inside of the front
channel. The top and bottom screw holes are used for the screws;
the center screw hole is used for the ball stud or latch bracket.
6. Secure the rail to a round-hole channel with 2 M5 x 12 mm
pan-head screws (see the table on page 3), or secure the rail to a
square-hole channel with 2 square-hole washers and
"Top" up and to the
rack front
Flange to the inside
of the channel (rack front)

EMC Departmental Switches DS-16M2 and DS-32M2 Installation Guide
9
Installing the DS-16M and DS-32M Rails
M5 x 16 mm flat head screws (see the table on page 3). Leave the
screws finger-tight, and tighten them after the switch is installed.
See the figure below.
If you are installing the switch in a 40U cabinet, install a keyplate spacer on
the outside of the channel as you secure the rail to the front channel. The
spacer is marked such that an L or an R will be upright when correctly
installed on the left or right channel. See the figure below.
DS-16M Round-Hole DS-16M Square-Hole
Channel, Rack Front Channel, Rack Front
(for example, the (Third-Party Rack/Cabinet)
CLARiiON Rack/Cabinet)
EMC2424
Screw (2)
Spacer
S
witch
Mounting Rails

10
EMC Departmental Switches DS-16M2 and DS-32M2 Installation Guide
Installing the DS-16M and DS-32M Rails
7. If you are installing the switch in a 39U cabinet, position the #10
washer and ball stud in the center hole, between the two
M5 x 12 mm screws. Hand-tighten the ball stud.
NOTE: The ball studs support the bezel.
If you are installing the switch in a 40U cabinet, use an M5 x 12 mm
screw to install the latch bracket in the center hole, over the
keyplate spacer. See the figure below.
8. Align the holes in the rear, u-shaped flange of the rail with the
holes in the rear inside channel.
EMC242
2
Latch
Bracket
Screw
Keyplate
Spacer
Rear (u-shaped)
flange
Altri manuali per Connectrix DS-32M2
1
Questo manuale è adatto per i seguenti modelli
1
Indice
Altri manuali EMC Interruttore

EMC
EMC Connectrix B Series Guida rapida per l'utente

EMC
EMC Connectrix B Series Guida rapida per l'utente

EMC
EMC Connectrix DS-24M2 Manuale utente

EMC
EMC DS-4900B Guida rapida per l'utente

EMC
EMC Connectrix B Series Manuale utente

EMC
EMC Connectrix DS-16M2 Manuale

EMC
EMC Connectrix B Series Guida rapida per l'utente

EMC
EMC Connectrix B Series Guida rapida per l'utente

EMC
EMC Connectrix ED-64M Manuale utente

EMC
EMC Connectrix B Series Guida rapida per l'utente