
Kalea Bay See-Thru Conversion Kit REV. 4-15-19 Page 4
Step 2: INSTALLING HOOD
The replace requires a hood to be installed into each side of the rebox. One hood would have come with the single
sided replace, the other hood is supplied with this kit. All models require ve (5) screws (#77129) to secure the hood
to the replace except the 72-inch model, which uses seven (7) screws to secure the hood. The hood protrudes outward
1-inch from the top opening of the replace. Fig. 3 shows hole location and installation process for hood installation. The
protruding area of the hood is angled downward to deect heat away, see Hood Detail below.
Fig. 3 Installing hood(s) on the replace.
Hood Screw Locations
FRONT VIEW SIDE VIEW
Hood
(Deector Facing Downward)
Hood Detail
End View
Step 3: INSTALLING GLASS HOLDERS
Install the #76124 (glass holder - left) using two pan head
Phillips screws supplied with the kit.
Align and insert the screw through the glass holder as
shown in Fig. 4. Each screw will thread into the rivet-nut in
the inner side panel of the replace.
Install the #76119 (glass holder - right) in the same manner
on the right side.
Note: Glass holders are designed to hide the screw heads
when installed.
Fireplace Inner
Side Panel
These
rivet-nuts
not used.
7”
Fig. 4 Shows installing the left glass holder.