Forest garden MGHFP Manuale utente

DRILL
POZI DRIVE SCREWDRIVER
HAMMER
MGHFP (FIXING PACK)
Important : Assembly
of this product requires
two people.
REQUIRED TOOLS :
(NOT SUPPLIED)
4
12
Thank you for choosing this garden building manufactured by the UK's largest manufacturer of timber garden products. In order to gain the most benefit from it,
please note the following:
– If there are any technical queries with the product, please contact our customer help line on 0333 7777 089 between the hours of 8.30 am and 5.00 pm Monday to
Friday.
- Timber is a natural material. It will shrink and swell as a result of varying moisture content.
- This product is pressure treated to ensure the longevity of all timber components and protect against rot. This may leave a colour difference on some parts that will even
out as the moisture content stabilises.
- In line with your statutory rights, please check all parts prior to assembly, as assembly of damaged parts may be deemed to be acceptance and this may affect the
remedies you are entitled to. If the product is not constructed in accordance with the instructions, or is altered in anyway (eg painted), the manufacturer cannot be held
liable for any resulting damage.
- Please keep all plastic bags and small parts away from children in order to reduce the risk of suffocation.
- Make sure that you are building this product on a firm level base.
- This product is for DOMESTIC USE ONLY. Please keep these instructions for future reference.
1200mm
1443mm
624mm
JE
PW475100802
Door Glazing
QTY 2
MGCLSPTR
Left Hand Side
QTY 1
MGCRSPTR
Right Hand Side
QTY 1
MGWINPTR
Window
QTY 2
MGHDRPTR
Door
QTY 2 MGHBPPTR
Back Panel
QTY 1
MGHSLF
Shelf
QTY 2
PW6065402
Window Glazing
QTY 2
PW7795402
Side Panel Glazing
QTY 2
21120475PTR (21x12x475mm) QTY 4
40121132PTR (cover strip) QTY 2 45281086PTWB (45x28x1086mm with badge) QTY 1
PC1550050 (plastic clip )
44120510PTR (prop) QTY 2
45281086PTR (45x28x1086mm ) QTY 1
21120986PTR (21x12x986mm ) QTY 4
21120542PTR (21x12x542mm ) QTY 4
Turn Button
40mm SCREW
60mm SCREW
25mm NAIL
Handle
Corner Brace 20mm PINS
14
4
8
6
16
2
MUST PRE DRILL
IMPORTANT, RETAIN FOR FUTURE REFERENCE: READ CAREFULLY
21120756PTR (21x12x756mm ) QTY 4
4
3”Butt hinge
4
4
25mm PINS
40
4
2”Flush hinge
72
16
3.0 x 25mm screw
6.5mm
3.0 x 25mm screw
5.5mm
4
4.5 x 25mm screw
9.0mm 7.5mm
4.0 x 25mm screw
Forest Garden Ltd, Unit 288 Hartlebury Trading Estate, Hartlebury, Worcestershire, Dy10 4JB
MINI GREEN HOUSE
Issue 0116
MGHFP

1
MGCLSPTR
MGHBPPTR
Slide the window glazing into
the recesses in the window so
that it is tight against the top.
Position two of the plastic clips
at the bottom of the glazing to
stop it from sliding out.
Secure each clip in place using
the 20mm panel pins for each.
60mm SCREW
Fix the left and right
hand side panels to the
back panel as shown
using 3x60mm screws
for each, screwing
through the back panel
frame work into the
side panel.
Place the side panels on the
floor and slot the side panel
glazing into the recess so it sits
flush.
Place the beading
(21x12x540mm) tight against
the top and bottom of the
recess. Next position the
(21x12x756mm) pieces on
either side.
Secure each beading in place
using 3 panel pins for the sides
and 2 for the top and bottom.
21120540PTR
PW6065422
21120475PTR
MGWINPTR
MGCLSPTR
Place the door on the floor and
slot the door glazing into the
recess so it sits flush.
Place the beading
(21x12x475mm) tight against
the top and bottom of the
recess. Next position the
(15x12x986mm) pieces on
either side.
Secure the 986mm beading in
place using 3 panel pins and 2
panel pins for the 475mm
beading.
PW7795402
21120756PTR
21120986PTR
MGHDRPTR
PW475100802
MUST PRE DRILL
QTY 8
QTY 6
2
PIERCE THESE
BEFORE
POSITIONING
25mm PINS QTY40
20mm PINS

Place a prop on the inside of each side
panel as shown. Secure at one end
using a 40mm screw. Make sure the
prop can pivot.
PRE-DRILL
MUST PRE DRILL
QTY 16
Place four of the corner braces on the underside of
each shelf on both of the end battens as pictured.
Secure each in place with 2 x 25mm screw.
Mark the desired height of the shelf on the inside of
the framework. Secure the shelf in position by
securing each brace to the frame using 2x25mm
screw for each brace.
Repeat the step for the second shelf.
45281086PTWB
3
5
45281086PTR
D
In the same manner as the previous
step, fix the corner braces to the
battens. Secure the
45x28x1086mm (with Badge)
batten at the top and inside of each
of the side panels as illustrated.
Repeat for the 45x28x1086mm
batten at the bottom.
UNDERSIDE OF SHELF
MUST PRE DRILL
MUST PRE DRILL
4
25mm screw
25mm screw
QTY 32
QTY 2
40mm SCREW
INSIDE
PLACE AT HIGHEST POINT
6.5mm
6.5mm
Issue 0116
Fix two flush hinges to each of the
windows, equally spaced, using 2x25mm
screws for each hinge. Fix the inner part
of the hinge to the window
Then secure the windows to the rest of
the assembly as shown using a further
2x25mm screws per hinge
3.0 x 25mm screw 6
QTY 16
MUST PRE DRILL
5.5mm

Fix two hinges to each of the doors,
equally spaced, using 3x25mm screws
for each hinge.
Then secure the doors to the rest of the
assembly as shown using a further
3x25mm screws per hinge
Fix the two cover strips to the front of the
product so that it is flush with the sides.
Secure in position by using 2x25mm
nails for each board.
Fix the turn buttons to the
top and bottom of the
closed door using a 3.0 x
25mm screw for each.
Make sure that they turn
to keep the door shut.
Fix two Butt hinges to each of the doors,
equally spaced, using 3x25mm screws
for each hinge. The barrel of the hinge
must sit proud of the front of the door.
Then secure the doors to the rest of the
assembly as shown using a further
3x25mm screws per hinge
Fix a turn button on the inside and at
the top and bottom of the one of the
doors using a 25mm screw for each.
7
8
9
QTY 4
QTY 2
QTY 24
MUST PRE DRILL
3.0 x 25mm screw
QTY 16
3.0 x 25mm screw
7.5mm
6.5mm
9.0mm
4.0 x 25mm screw
Place a handle on the
front and centre of
each window, and the
centre of each door.
Secure in position
using the 4.0 x 25mm
screws provided.
10
QTY 2
3.0 x 25mm screw
9.0mm
MUST PRE DRILL
Forest Garden Ltd, Unit 288 Hartlebury Trading Estate, Hartlebury, Worcestershire, Dy10 4JB
MUST PRE DRILL
Altri manuali Forest garden Kit serra


















