FS SG-3110 Manuale utente

MULTISERVICE AND UNIFIED
SECURITY GATEWAYS
Quick Start Guide V1.0
USB
SATA
0/MGMT
1 2 3 4 5 6 7
PWR
RESET
CONSOLE
SYS
8F 9F
SPEED
10/100
1000
LINK/ACT
Security Gateway
DOWN
LINK
SFP+ SFP
USB
SATA
0/MGMT
1 2 3 4 5 6 7
PWR
RESET
CONSOLE
SYS
8F 9F
SPEED
10/100
1000
LINK/ACT
Security Gateway
DOWN
LINK
SFP+ SFP
SG-5105
PoE
Status RESET
WAN0
LAN1/WAN1
LAN2
LAN3 LAN5 LAN7
LAN4 LAN6
SG-3110
CONSOLE

Accessories
Introduction
Thank you for choosing FS Gateways. This guide is designed to familiarize you with the layout of the
gateway and describes how to deploy the gateway in your network.
Rubber Pad x4
Power Cord x1
SG-5110
SG-5105
SG-3110
SG-3110
SATA
0/MGMT 1 2 3 4 5 6 7
PWR RESET
CONSOLE
USB
SYS
8F 9F
SPEED
10/100
1000
LINK/ACT
Security Gateway
DOWN
LINK
SFP+ SFP
SATA
0/MGMT 1 2 3 4 5 6 7
PWR RESET
CONSOLE
USB
SYS
8F 9F
SPEED
10/100
1000
LINK/ACT
Security Gateway
DOWN
LINK
SFP+ SFP
PoEStatus RESET
WAN0
LAN1/WAN1
LAN2
LAN3 LAN5 LAN7
LAN4 LAN6
SG-3110
CONSOLE
SG-5105
Grounding Cable x1
M4 Screw x6Mounting Bracket x2

Front Panel Ports
M4 Screw x6
Rubber Pad x4
Power Cord x1
Hardware Overview
Mounting Bracket x2
Console Cable x1
Power Cord Tie x1
Network Cable x1
SG-5105/SG-5110
SG-3110
CONSOLE
NOTE: FS gateways have dust plugs delivered with them. Keep the dust plugs properly
and use them to protect idle optical ports.
PoEStatus RESET
WAN0
LAN1/WAN1
LAN2
LAN3 LAN5 LAN7
LAN4 LAN6
SG-3110
CONSOLE
USB RJ45

Front Panel Buttons
RJ45 10/100/1000BASE-T ports for Ethernet connection
SFP port for 1G connectionSFP
SFP+
CONSOLE
MGMT
USB
An RJ45 console port for serial management
An Ethernet management port
A USB management port for software and conguration backup
and oine software upgrade
SFP+ port for 10G connection
Ports Description
SG-5105/SG-5110
SG-5105/SG-5110
SG-3110
SATA
0/MGMT 1 2 3 4 5 6 7
PWR RESET
CONSOLE
USB
SYS
8F 9F
SPEED
10/100
1000
LINK/ACT
Security Gateway
DOWN
LINK
SFP+ SFP
SATA
0/MGMT 1 2 3 4 5 6 7
PWR RESET
CONSOLE
USB
SYS
8F 9F
SPEED
10/100
1000
LINK/ACT
Security Gateway
DOWN
LINK
SFP+ SFP
RJ45
CONSOLE
MGMT
USB SFP+ SFP
RESET
RESET
RESET
Press and release the RESET button to restart the device. To restore
to factory default, press and hold the RESET button for more than
three seconds.
Button Description
PoEStatus RESET
WAN0
LAN1/WAN1
LAN2
LAN3 LAN5 LAN7
LAN4 LAN6
SG-3110
CONSOLE

Back Panels
Back Panel Button
Power ON/OFF Control the gateway power supply.
Button Description
Front Panel LEDs
SG-5105/SG-5110
SG-3110
SG-3110
Status
RJ45
PoE
Solid Green
Blinking Green
Blinking Green
Solid Green
Solid Green
Red/Green Flashing
Alternately
LEDs Status
System is being initialized.
The initialization process is complete.
Solid Red
Solid Red
The system sends out an alarm.
The port is receiving or transmitting data.
The port is up.
PoE works normally.
An alarm is generated.
PoE overload occurs.
Description
SATA
ON
100-240V~;50/60Hz,0.6A OFF
100V-240V~;50/60Hz;3A max
Grounding Point Power Supply
Power Supply ON/OFF
Hard Disk Drive Slot
Grounding Point
PoEStatus RESET
WAN0
LAN1/WAN1
LAN2
LAN3 LAN5 LAN7
LAN4 LAN6
SG-3110
CONSOLE
Status RJ45 PoE

PWR
SYS
SATA
LINK/ACT
SPEED
SFP+
SFP
O
Solid Green
Blinking Green
Solid Green
Solid Green
Blinking Green
Solid Green
Blinking Green
O
Solid Orange
Solid Green
Solid Green
Blinking Green
Blinking Green
LEDs Status
The power module is not in the position or fails.
The power module is working properly.
The system is being initialized.
The initialization process is complete.
Solid Red The system sends out an alarm.
The SATA disk is installed.
The port is receiving or transmitting data.
The port is connected at 10/100/1000M.
The ber port is connected.
The ber port is receiving or transmitting data.
The ber port is connected.
The ber port is receiving or transmitting data.
The port is connected at 1000M.
The port is connected at 10/100M.
The SATA disk is reading or writing data.
Description
SG-5105/SG-5110
SATA
0/MGMT 1 2 3 4 5 6 7
PWR RESET
CONSOLE
USB
SYS
8F 9F
SPEED
10/100
1000
LINK/ACT
Security Gateway
DOWN
LINK
SFP+ SFP
SYS
SATA
PWR SFP+ SFP
LINK/ACT
SPEED
Installation Requirements
Before you begin the installation, make sure that you have the followings:
Phillips screwdriver.
Standard-sized, 19" wide rack with a minimum of 1U height available.
Category 5e or higher RJ-45 Ethernet cables and ber optical cables for connecting network
devices.

Do not place the device in a damp or wet location. Do not let any liquid enter the chassis.
Do not install the equipment in a dusty environment.
Keep the device away from heat sources.
Ensure the normal grounding of device.
Wear an anti-static wrist strap to install and maintain the device.
Use UPS (Uninterruptible Power Supply) to prevent power failure and other interferences.
Mounting the Gateway
Desk Mounting
1. Attach four rubber pads to the bottom.
2. Place the chassis on a desk.
USB
SATA
0/MGMT
1 2 3 4 5 6 7
PWR
RESET
CONSOLE
SYS
8F 9F
SPEED
10/100
1000
LINK/ACT
Security Gateway
DOWN
LINK
SFP+ SFP
Site Environment:
SATA
0/MGMT
1 2 3 4 5
PWR
RESET
CONSOLE
USB
SYS
SATA
0/MGMT
1 2 3 4 5 6
PWR
RESET
CONSOLE
USB
SYS

78F 9F
SPEED
10/100
1000
LINK/ACT
Security Gateway
DOWN
LINK
SFP+ SFP
Rack Mounting
1. Secure the mounting brackets to the two sides of the gateway with six M4 screws.
2. Attach the gateway to the rack using four M6 screws and cage nuts.
8F 9F
SPEED
10/100
1000
LINK/ACT
Security Gateway
DOWN
LINK
SFP+ SFP

Grounding the Gateway
1. Connect one end of the grounding cable to a proper earth ground, such as the rack in which the
gateway is mounted.
2. Secure the grounding lug to the grounding point on the gateway back panel with the washers and
screws.
Connecting the Power
1. Plug the AC power cord into the power port on the back of the gateway.
2. Connect the other end of the power cord to an AC power source.
CAUTION: Do not install the power cord while the power is on, and when the power cord
is connected, the fan will start to operate whether the power button is on or o.
OFF
ON
SATA
100-240V~; 50/60HZ,0.6A

OFF
ON
PSO
~100-240V/1A
Connecting the RJ45 Ports
1. Connect an Ethernet cable to the RJ45 port of a computer or other network devices.
2. Connect the other end of the Ethernet cable to the RJ45 port of the gateway.
SATA
0/MGMT
1 2 3 4 5 6 7
PWR
RESET
CONSOLE
USB
SYS
8F 9F
SPEED
10/100
1000
SFP+ SFP
Questo manuale è adatto per i seguenti modelli
2
Indice
Altri manuali FS Portale
Manuali Portale popolari di altre marche

LST
LST M500RFE-AS Manuale utente

Kinnex
Kinnex Media Gateway Manuale utente

2N Telekomunikace
2N Telekomunikace 2N StarGate Manuale utente

Mitsubishi Heavy Industries
Mitsubishi Heavy Industries Superlink SC-WBGW256 Manuale utente

ZyXEL Communications
ZyXEL Communications ZYWALL2 ET 2WE Manuale utente

Telsey
Telsey CPVA 500 - SIP Manuale utente













