Huawei FusionDC1000A Manuale utente

FusionDC1000A Prefabricated All-in-One Data
Center
Quick Guide (2021, France,
Eutelsat)
Issue 01
Date 2021-04-30
HUAWEI TECHNOLOGIES CO., LTD.

Copyright © Huawei Technologies Co., Ltd. 2021. All rights reserved.
No part of this document may be reproduced or transmitted in any form or by any means without prior
written consent of Huawei Technologies Co., Ltd.
Trademarks and Permissions
and other Huawei trademarks are trademarks of Huawei Technologies Co., Ltd.
All other trademarks and trade names mentioned in this document are the property of their respective
holders.
Notice
The purchased products, services and features are stipulated by the contract made between Huawei and
the customer. All or part of the products, services and features described in this document may not be
within the purchase scope or the usage scope. Unless otherwise specied in the contract, all statements,
information, and recommendations in this document are provided "AS IS" without warranties, guarantees
or representations of any kind, either express or implied.
The information in this document is subject to change without notice. Every eort has been made in the
preparation of this document to ensure accuracy of the contents, but all statements, information, and
recommendations in this document do not constitute a warranty of any kind, express or implied.
Huawei Technologies Co., Ltd.
Address: Huawei Industrial Base
Bantian, Longgang
Shenzhen 518129
People's Republic of China
Website: https://e.huawei.com
Issue 01 (2021-04-30) Copyright © Huawei Technologies Co., Ltd. i

About This Document
Purpose
This document describes the initial conguration parameters of the data center, as
well as the installation precautions, processes, parameters, and drawings. It helps
customers quickly get familiar with product congurations, and provides
installation guidance and technical support for onsite installation personnel and
technical support engineers.
Intended Audience
This document is intended for:
● Maintenance engineers
● Technical support engineers
● System engineers
● Commissioning engineers
● Data conguration engineers
Symbol Conventions
The symbols that may be found in this document are dened as follows.
Symbol Description
Indicates a hazard with a high level of risk which,
if not avoided, will result in death or serious
injury.
Indicates a hazard with a medium level of risk
which, if not avoided, could result in death or
serious injury.
Indicates a hazard with a low level of risk which,
if not avoided, could result in minor or moderate
injury.
FusionDC1000A Prefabricated All-in-One Data
Center
Quick Guide (2021, France, Eutelsat) About This Document
Issue 01 (2021-04-30) Copyright © Huawei Technologies Co., Ltd. ii

Symbol Description
Indicates a potentially hazardous situation which,
if not avoided, could result in equipment damage,
data loss, performance deterioration, or
unanticipated results.
NOTICE is used to address practices not related to
personal injury.
Supplements the important information in the
main text.
NOTE is used to address information not related
to personal injury, equipment damage, and
environment deterioration.
Change History
Changes between document issues are cumulative. The latest document issue
contains all the changes made in earlier issues.
Issue 01 (2021-04-30)
This issue is the rst ocial release.
FusionDC1000A Prefabricated All-in-One Data
Center
Quick Guide (2021, France, Eutelsat) About This Document
Issue 01 (2021-04-30) Copyright © Huawei Technologies Co., Ltd. iii

Contents
About This Document................................................................................................................ ii
1 Quick Guide Usage.................................................................................................................. 1
2 Installation Guide.................................................................................................................... 3
2.1 Lowering a Fan (Applicable To Downow Units)........................................................................................................ 3
3 Installation Drawings............................................................................................................. 6
4 Removing Transport Protection Materials........................................................................ 7
5 Initial Conguration Parameters.........................................................................................8
A Common Torque Selection Table.........................................................................................9
FusionDC1000A Prefabricated All-in-One Data
Center
Quick Guide (2021, France, Eutelsat) Contents
Issue 01 (2021-04-30) Copyright © Huawei Technologies Co., Ltd. iv

1 Quick Guide Usage
This chapter describes the notes for using the quick guide.
● Before the installation, check whether the materials are intact according to
the packing list. If there is any problem, contact Huawei technical support.
● This document provides only the initial conguration parameters required for
data center commissioning and O&M as well as the drawings and parameters
required for onsite installation.
● Before using this document, read through and keep in mind the safety
precautions and the cautions and notes for operations.
● Precautions provided in this document are only supplementary to the local
laws and regulations governing the data center.
● The system conguration parameters are essential to reliable running of the
system. Improper modications of parameters may easily cause abnormal
running status, or even damage to the system. You are not allowed to modify
conguration parameters without permission when using the data center. If a
modication is necessary, contact Huawei technical support. Huawei shall not
be responsible for any loss caused by unauthorized conguration
modication.
● You can modify initial congurations under the guidance of Huawei
engineers. Huawei assumes no liability for any loss caused by unauthorized
changes to the initial congurations.
● Some parameters mentioned in this document should be provided and
congured by onsite technical support engineers based on the actual
application of the data center.
● If parameters need to be modied during the running of systems, the
operator should be a professional in this eld and familiar with each system
and its working principles.
● Before performing an operation, ensure that the prerequisites are met.
Otherwise, the expected result may not be achieved. More seriously,
equipment damage and personal injury may occur.
● Put on necessary protective equipment such as the safety helmet and gloves
before entering the site.
● A data center can be powered on for commissioning only after it has been
installed and passed the installation check.
FusionDC1000A Prefabricated All-in-One Data
Center
Quick Guide (2021, France, Eutelsat) 1 Quick Guide Usage
Issue 01 (2021-04-30) Copyright © Huawei Technologies Co., Ltd. 1

● The gures provided in this document illustrate only installation and
connection methods. The actual product appearance prevails.
● Unless otherwise specied, the unit for the dimensions in the gures provided
in this document is mm by default.
● Before using this document, understand the actual product congurations,
solution conguration for the data center in use, type of power grid used by
the customer, and internal conguration of each pre-fab. module.
● When performing operations (such as installing an awning or outdoor unit)
over the top of a pre-fab. module, take measures to protect the top of the
pre-fab. module against damage. Do not perform operations such as arc
welding, drilling, and cutting on the top of a pre-fab. module.
Table 1-1 Reference Documentation
Item Document Name
UPS UPS5000-E-(350 kVA-800 kVA) User Manual (50 kVA Power
Modules)
Smart
cooling
product
NetCol8000-A(045, 055, 060, 090, 120) In-room Air Cooled Smart
Cooling Product User Manual
FusionDC1000A Prefabricated All-in-One Data
Center
Quick Guide (2021, France, Eutelsat) 1 Quick Guide Usage
Issue 01 (2021-04-30) Copyright © Huawei Technologies Co., Ltd. 2

2 Installation Guide
2.1 Lowering a Fan (Applicable To Downow Units)
Procedure
Step 1 Remove two beams.
Figure 2-1 Removing beams
Step 2 Rotate the fan upward by 30 degrees, and pull the rotating shaft of the fan to the
outermost side.
FusionDC1000A Prefabricated All-in-One Data
Center
Quick Guide (2021, France, Eutelsat) 2 Installation Guide
Issue 01 (2021-04-30) Copyright © Huawei Technologies Co., Ltd. 3

Figure 2-2 Turning a fan to 30 degrees
Step 3 Slowly rotate the fan by 90 degrees and ensure that the rotating shaft of the fan
is on the outermost side.
CA UTION
Exercise caution when handling the fan to avoid body injury.
Figure 2-3 Turning a fan to 90 degrees
Step 4 After the fan rotates to 150 degrees, push the fan back to the horizontal position.
FusionDC1000A Prefabricated All-in-One Data
Center
Quick Guide (2021, France, Eutelsat) 2 Installation Guide
Issue 01 (2021-04-30) Copyright © Huawei Technologies Co., Ltd. 4

Figure 2-4 Turning a fan to 150 degrees
Step 5 Use a torque wrench to secure the two beams, and interconnect the fan cables
using the interconnection terminal reserved in the cabinet.
Figure 2-5 Securing the fan beams
----End
FusionDC1000A Prefabricated All-in-One Data
Center
Quick Guide (2021, France, Eutelsat) 2 Installation Guide
Issue 01 (2021-04-30) Copyright © Huawei Technologies Co., Ltd. 5
Altri manuali per FusionDC1000A
8
Indice
Altri manuali Huawei Registratore di dati

Huawei
Huawei FusionModule2000 V500R003C10 Manuale operativo

Huawei
Huawei FusionModule500 Specifiche tecniche

Huawei
Huawei SmartLogger3000 Manuale utente

Huawei
Huawei SmartLogger2000-10-B-JP Manuale utente

Huawei
Huawei FusionModule 1000B Manuale operativo

Huawei
Huawei SmartLogger3000 Manuale utente

Huawei
Huawei FusionModule 1000A20 Manuale utente

Huawei
Huawei SmartLogger1000 Manuale utente

Huawei
Huawei FusionModule500 Manuale utente

Huawei
Huawei FusionDC1000A Manuale utente






















