Huawei RRU3931E Manuale utente

RRU3931E
V100R011C10
Installation Guide
Issue Draft A
Date 2016-03-30
HUAWEI TECHNOLOGIES CO., LTD.

Copyright © Huawei Technologies Co., Ltd. 2016. All rights reserved.
No part of this document may be reproduced or transmitted in any form or by any means without prior written
consent of Huawei Technologies Co., Ltd.
Trademarks and Permissions
and other Huawei trademarks are trademarks of Huawei Technologies Co., Ltd.
All other trademarks and trade names mentioned in this document are the property of their respective
holders.
Notice
The purchased products, services and features are stipulated by the contract made between Huawei and the
customer. All or part of the products, services and features described in this document may not be within the
purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information,
and recommendations in this document are provided "AS IS" without warranties, guarantees or
representations of any kind, either express or implied.
The information in this document is subject to change without notice. Every effort has been made in the
preparation of this document to ensure accuracy of the contents, but all statements, information, and
recommendations in this document do not constitute a warranty of any kind, express or implied.
Huawei Technologies Co., Ltd.
Address: Huawei Industrial Base
Bantian, Longgang
Shenzhen 518129
People's Republic of China
Website: http://www.huawei.com
Email: [email protected]
Issue Draft A (2016-03-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
i

Contents
1 RRU3931E Installation Guide..................................................................................................... 1
1.1 Changes in RRU3931E Installation Guide.....................................................................................................................4
1.2 Installation Preparations................................................................................................................................................. 4
1.2.1 Installation Environment............................................................................................................................................. 4
1.2.2 Reference Documents..................................................................................................................................................5
1.2.3 Tools and Instruments..................................................................................................................................................5
1.2.4 Skills and Requirements for Installation Personnel.....................................................................................................6
1.2.5 Installation Scenarios...................................................................................................................................................7
1.2.6 Installation Clearance Requirements........................................................................................................................... 8
1.3 Unpacking Inspection..................................................................................................................................................... 9
1.4 Obtaining the SN.......................................................................................................................................................... 11
1.5 Installation Process....................................................................................................................................................... 11
1.6 Installing a RRU3931E.................................................................................................................................................12
1.6.1 Mounting Kits............................................................................................................................................................12
1.6.2 Installing a RRU3931E on a Pole..............................................................................................................................14
1.6.3 Installing a RRU3931E on a Wall............................................................................................................................. 17
1.7 Installing Cables........................................................................................................................................................... 21
1.7.1 Cabling Requirements............................................................................................................................................... 21
1.7.2 Cable Connections.....................................................................................................................................................23
1.7.3 Opening the Maintenance Cavity Covers..................................................................................................................24
1.7.4 Installing a Power Cable............................................................................................................................................25
1.7.5 Installing an CPRI Fiber Optic Cable........................................................................................................................27
1.7.6 (Optional) Installing an CPRI Fiber Optic Cable for Cascading...............................................................................29
1.7.7 Closing the Maintenance Cavity Covers................................................................................................................... 30
1.7.8 Installing a PGND Cable........................................................................................................................................... 31
1.7.9 (Optional) Installing an RF Jumper........................................................................................................................... 33
1.8 (Optional)Replacing the Internal Antenna with External Antennas.............................................................................36
1.9 Checking the Hardware Installation............................................................................................................................. 41
1.10 Performing a Power-On Check...................................................................................................................................42
1.11 References...................................................................................................................................................................43
1.11.1 Assembling a Shielded RJ45 Connector and an Ethernet Cable............................................................................. 43
1.11.2 Checking the Appearance of Metal Contact Strips..................................................................................................47
1.11.3 Testing the Connection of Assembled Cables......................................................................................................... 49
RRU3931E
Installation Guide Contents
Issue Draft A (2016-03-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
ii

1.11.4 Assembling a Tool-less Female Connector (Pressfit Type) and a Power Cable......................................................53
1.11.5 Small Cell Engineering Label..................................................................................................................................56
1.11.6 Attaching a Sign Plate Label................................................................................................................................... 57
1.11.7 SN Collection Template...........................................................................................................................................59
RRU3931E
Installation Guide Contents
Issue Draft A (2016-03-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
iii

1 RRU3931E Installation Guide
Introduction
This document describes how to install a RRU3931E in different scenarios and provides the
hardware installation checklist as a reference.
Product Version
The following table lists the product versions related to this document.
Product
Name
Solution Version Product Version
RRU3931E lSRAN11.1 and later versions
lRAN18.1 and later versions
leRAN11.1 and later versions
V100R011C10 and later versions
Intended Audience
This document is intended for:
lRRU3931E installation engineers
lSystem engineers
lSite maintenance engineers
Organization
1.1 Changes in RRU3931E Installation Guide1.1 Changes in RRU3931E Installation
Guide
This section describes the changes in RRU3931E Hardware Description.
1.2 Installation Preparations1.2 Installation Preparations
This section describes the preparations for installation. Before starting the installation, you
must get the installation environment ready, obtain the required reference documents, tools,
and instruments, and familiarize yourself with the skills required.
RRU3931E
Installation Guide 1 RRU3931E Installation Guide
Issue Draft A (2016-03-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
1

1.3 Unpacking Inspection1.3 Unpacking Inspection
This section describes how to unpack and check the delivered materials to ensure that all the
materials are included and intact.
1.4 Obtaining the SN1.4 Obtaining the SN
This section describes how to obtain the serial number (SN) of a RRU3931E. Before
installing the RRU3931E, record its SN for future use during commissioning.
1.5 Installation Process1.5 Installation Process
This section describes the process for installing a RRU3931E. The process includes:
lInstalling a RRU3931E
lInstalling cables
lChecking the hardware installation
lPerforming a power-on check
1.6 Installing a RRU3931E1.6 Installing a RRU3931E
This section describes the procedure and precautions for installing a RRU3931E.
1.7 Installing Cables1.7 Installing Cables
This section describes the procedure and precautions for installing cables.
en-us_topic_0027706033.xmlen-us_topic_0027706033.xml
This section describes the procedure and precautions for adjusting the installation angles of a
RRU3931E.
1.9 Checking the Hardware Installation1.9 Checking the Hardware Installation
This section describes how to check the hardware installation after a RRU3931E is installed.
1.10 Performing a Power-On Check1.10 Performing a Power-On Check
This section describes the procedure for performing a power-on check on a RRU3931E.
1.11 References1.11 References
This section describes reference information and common operations involved during
installation.
1.1 Changes in RRU3931E Installation Guide
This section describes the changes in RRU3931E Hardware Description.
1.2 Installation Preparations
This section describes the preparations for installation. Before starting the installation, you
must get the installation environment ready, obtain the required reference documents, tools,
and instruments, and familiarize yourself with the skills required.
1.3 Unpacking Inspection
This section describes how to unpack and check the delivered materials to ensure that all the
materials are included and intact.
1.4 Obtaining the SN
This section describes how to obtain the serial number (SN) of a RRU3931E. Before
installing the RRU3931E, record its SN for future use during commissioning.
RRU3931E
Installation Guide 1 RRU3931E Installation Guide
Issue Draft A (2016-03-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
2

1.5 Installation Process
This section describes the process for installing a RRU3931E.
1.6 Installing a RRU3931E
This section describes the procedure and precautions for installing a RRU3931E.
1.7 Installing Cables
This section describes the procedure and precautions for installing cables.
1.8 (Optional)Replacing the Internal Antenna with External Antennas
This section describes how to replace the RRU3931E internal antenna with external antennas.
1.9 Checking the Hardware Installation
This section describes how to check the hardware installation after a RRU3931E is installed.
1.10 Performing a Power-On Check
This section describes the procedure for performing a power-on check on a RRU3931E.
1.11 References
This section describes reference information and common operations involved during
installation.
RRU3931E
Installation Guide 1 RRU3931E Installation Guide
Issue Draft A (2016-03-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
3

1.1 Changes in RRU3931E Installation Guide
This section describes the changes in RRU3931E Hardware Description.
Draft A (2016-03-30)
This is a draft.
1.2 Installation Preparations
This section describes the preparations for installation. Before starting the installation, you
must get the installation environment ready, obtain the required reference documents, tools,
and instruments, and familiarize yourself with the skills required.
1.2.1 Installation Environment
Before starting the installation, ensure that the power supply equipment, transmission
equipment, and related matching equipment are ready.
Precautions for Site Selection
lDo not install a RRU3931E near an interference source, such as a broadcast and
television tower, high and low-voltage substation, high-voltage tower, high-power radio
transmitter, and radar station.
lFor the sake of surge protection, the mounting height of a RRU3931E should not be
greater than 10 m. Do not install a RRU3931E along a highway or railway or on the
mountain top, tower, standalone pole in a suburban area or open field, or standalone
rooftop in a non-urban area.
Requirements for the Upper-level Circuit Breaker
Slow-blow fuses of the gL (DIN VDE)/gG (IEC) class in accordance with IEC60269-1 are
recommended. Fuses of the same specifications must be configured for L and N wires for the
sake of O&M security.
Type C bipolar circuit breakers in accordance with IEC60934 are recommended. Circuit
breakers must be configured for L and N wires for the sake of O&M security.
Table 1-1 describes the recommended specifications.
Table 1-1 Requirements on the upper-level circuit breakers and power cables
Power Supply Current of the Upper-
level AC Circuit
Breakers (or Fuses)
Cross-Sectional Area of
the Input Power Cable
220 V AC single-phase lMinimum value: 5 A
lRecommended value: 16
A
1.5 mm2 to 2.5 mm2
110 V AC dual-live-wire
RRU3931E
Installation Guide 1 RRU3931E Installation Guide
Issue Draft A (2016-03-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
4

Power Supply Current of the Upper-
level AC Circuit
Breakers (or Fuses)
Cross-Sectional Area of
the Input Power Cable
110 V AC single-phase lMaximum value: 20 A
NOTE
lThe requirements provided in the preceding table are based on the peak power of a RRU3931E and
do not represent power consumption when the RRU3931E is running.
lMinimum value: Ensures that a RRU3931E can work normally under normal circumstances.
However, lightning strikes or abnormal voltage fluctuations may trip the circuit breaker or melt the
fuse.
lRecommended value: Ensures that a RRU3931E can work normally under normal circumstances
and that the circuit breaker does not trip in the event of lightning strikes or abnormal voltage
fluctuations.
lMaximum value: Indicates the maximum rated current allowed in the product design.
Requirements for Surge Protection and Grounding
Huawei by default uses a three-core power cable to connect a RRU3931E and external power
supply equipment. The power supply side must ensure that the PE wire of the three-core
power cable can be properly grounded. In outdoor installation scenarios or outdoor cabling
scenarios, PGND cables must be used to guarantee the surge protection and grounding for the
ground terminals of the mounting kits.
Requirements for power supply
During installation, power off the RRU3931E.
1.2.2 Reference Documents
This section describes reference documents required for installation.
Before starting the installation, you must be familiar with the following reference documents:
lSafety Information
lRRU3931E Hardware Description
1.2.3 Tools and Instruments
Before starting the installation, prepare the following tools and instruments.
Marker (diameter ≤ 10 mm) Hammer drill (Ø12 bore) Rubber mallet
RRU3931E
Installation Guide 1 RRU3931E Installation Guide
Issue Draft A (2016-03-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
5

Level Torque screwdriver
Phillips (M3, M4)
Flat-head (M6, M8)
Torque wrench
Cable cutter Wire stripper COAX crimping tool
Crimping tool for power
cables
RJ45 crimping tool Diagonal pliers
Heat gun Utility knife Multimeter
ESD gloves Vacuum cleaner Measuring tape
1.2.4 Skills and Requirements for Installation Personnel
Installation personnel must be qualified, trained, and familiar with correct operation methods
and safety precautions before performing any operations.
Before starting the installation, pay attention to the following items:
lThe customer's technical engineers must be trained by Huawei and be familiar with the
proper installation and engineering methods.
lThe number of required installation personnel depends on the engineering schedule and
installation environment. Generally, three to five installation personnel are necessary.
RRU3931E
Installation Guide 1 RRU3931E Installation Guide
Issue Draft A (2016-03-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
6
Altri manuali per RRU3931E
1
Indice
Altri manuali Huawei Ricevitore