Huck Douglas Fir Manuale utente

HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen
1
Assembly Instructions
Douglas Fir Swing Frame
Art. 4577-1-200
Operator: ___________________________________________________
Location: ___________________________________________________

HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen
2
Datasheet douglas - swing frame
suspension height 2,00 m (Art.-No. 4577-1-200) incl. post shoes
1 Space required: 4.20 x 4.00 m, safety area: 4.20 x 7.30m
Height of fall
2.10 m
2 SurfacematerialDescriptionMinimum
thickness
Maximheightogdrop
mmoflayer(mm)mm
Grass/topsoil <=1000*
Chippedbarkgranularsize20to80300/400<=2000/3000
Woodchippingsgranularsize5to30300/400<=2000/3000
Sandgranularsize0.2to2300/400<=2000/3000
Gravelgranularsize2to8300/400<=2000/3000
othersurface
materials
astestedinaccordancewithHICcriticaldropheightas
tested
3Nameandoveralldimensionofthelargestitemofequipment:
1Woodenpost,Length4,00m,Ø18cm,(50kg)
4 Weightoftheheaviestitemofequipment:
1packDouglasposts;180kg(setoftwoscissorframesincl.Postshoes)
5Attention! System for concrete
foundation !
Concrete: C25/30
Concrete necessary: 1.26 m³
Round off foundation edges (min.R = 100 mm)! Sizes of fundations are “4-5”
(natural ground). Soil class 4: soft to medium plasticity, interleave bound, with
minor portion of stone (portion < 30% with bigger diameter of 63 mm grain size)
Soil class 5 : ground with soil class 3 and 4 with big portion of stones (portion >
30% with bigger diameter of 63 mm grain size) In case of sandy and soft soils, the
surface measure of foundations have to be enlarged for about 50%!

HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen
3
6Sizeoffoundations:depth0.90m,width70cmx100cm(incl.Drainagelayerof0.10mheight)
concretefoundationblockof40cm
7Anysparepartswhichmaybeneededcanbeobtaineddirectlyfromyoursupplierorfromyour
manufacturer.
8Weherebyconfirmthatthisitemofplayequipmenthasbeentestedandcertifiedinaccordance
withthenewplayequipmentstandardEN1176.
Drawings / Views
All optical drawings are showing only the measurements/dimensions
and are no mandatory technical views of the complete item.
We reserve the right to change technical details of our articles which
are serving for the further development of our articles and are reasonable for the customer.
Measurement tolerances
Because of the properties and characteristics of the components, minor measurement tolerances
compared to the indication on the sketches are possible.
This concerns all shown measurements except the foundation measurements resp.
Measurements below upper edge ground level/play.

HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen
4
- ASSEMBLY INSTRUCTIONS -
Multiple Swing frame Art. No. 4577-1-200, made of Douglas fir with a suspension height of 2.00m
Package contents:
- 4 wooden posts, Ø 16cm, 4.05m long, installed like scissors
(incl. post shoes )
- 1 cross beam, Ø 18cm, 4.00m long,
- 1 carton of accessories:
- 4 cover caps, Ø 16cm, red + screws
- 2 cover caps, Ø 18cm, red + screws
- 4 bolts M16 x 360mm
- 4 washers for M16
- 4 stop nuts M16
- 4 cover caps for M16
Play equipment:
different play equipment (therefore see package contents and freight documents)
Required devices:
1 wood drilling machine, Ø 17 / 18 x 350mm
Required assembly space:
4.20 x 4.00m / 4.20 x 7.30m incl. safety area
Height of fall:
1.60m
Recommended ground surface:
Sand, gravel, chipped bark, etc.
Round off foundation edges (min.R = 100 mm)! Sizes of fundations are “4-5” (natural ground).
Soil class 4: soft to medium plasticity, interleave bound, with minor portion of stone (portion < 30% with
bigger diameter of 63 mm grain size)
Soil class 5 : ground with soil class 3 and 4 with big portion of stones (portion > 30% with bigger diameter of

HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen
5
63 mm grain size)
In case of sandy and soft soils, the surface measure of foundations have to be enlarged
for about 50 %
Assembly instruction:
1. Measure out the assembly space including required safety area. Dig out the foundations in accordance
to the foundation plan. Take care that rubble drain bed is 10cm (see sketch). Attention! Treat the
wooden parts as described in the enclosed leaflet (maintenance tips for handling the douglas wood).
2. Lay the cross beam on the ground. (Attention: do not remove the steel belt!).
3. Lay the uprights on the ground and stretch them in accordance to the measurement.
3.1 Before assembling the bolts at the connection of the pair of stand poles and the carriage
bolts of the post shoes have to be retightened.
4. For stabilization of the scissors position during the installation, fit a temporary lath on the upper edge of
the marking tape and nail it to the upper edge of the playing level! Measuring of the temporary lath is
2.60m (middle post to middle post).
5. Set down the two scissors frames into the foundation.
6. Put on the top beam with a projecting end on both sides of 1.49m (fix them rectangular to the uprights
posts; see sketch).
Attention! The drillings are Ø 17cm in vertical line! Go through the existing drillings of the wood post to
set the drillings on the cross beam. To avoid that the wood tears out while drilling, you should hold a
board against it, secure the cross beam with the 4 bolts
M16 x 360, the washers, the lock nuts and cover caps. Attention! The lock nuts have to point to the top!
7. Set in concrete C20/25 (B25) in accordance with the foundation plan, at least 40cm deep (see enclosed
sketch).
8. After the setting time (at least 5 days) fix the swing bearing. Take care that bearing is fastened straight,
so that you can attach the play equipment.
For the big Bird´s Nest Art.No. 4650 (bearing on the inside) and for the Huck Honeycomb Art. No. 4550
(bearing on the outside) you always have to fit in the double joint bearing Art. No. 4608-1 (pay attention to
the turn direction of the main bearing: upper axis shows askance to the swing direction; lower axis shows in
swing direction).
We recommend to use a jigsaw with a steel saw blade for the bolt length -adjusting of the joints.
If an angle grinder is used, the surface of the wood can get dark because of chemical reaction
by contact with flying sparks (no impairment to the safety ness and durability of the frame).
Install it with the enclosed safety chain. The safety chain is prepared so that you only have to fit in the eye
bolts (turn direction shows to swing direction) which are installed in the drillings accordance to the
foundation plan. Hang up the free end of the chain on the
second link from the equipment chain (counted from the top) with the already installed shackle. For the
safety swing seat Art. No. 4712 is the simple bearing enough!

HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen
6
ATTENTION! For the use of other hanging up-equipments (as bird´s nest Art. No. 4650/ 4550) you can
take the drillings distance for the bearing from the enclosed foundation plan.
9. For all swings you have to take care that there is at least a distance of 45cm measured from the bottom
to the deepest point of the swing. Possibly it is necessary to short the chain!
10.Fix the enclosed cover caps with VA- wood screws at the top of the wooden posts.
11.Fit all screwed connections additional with the enclosed glue. Secure the bolts with a knock.
12.Cover all left drillings (from above) with the plastic caps.
At the projecting ends (left and right side) of the top beam it is possible to install an equipment like the
pendulum seat, swing seat, rope ladder and other one-point-bearing equipment. Attention! You are only
allowed to fix the one-point- bearing equipment on the exterior drillings. The fixing of the climbing net is
even possible.
Tips for maintenance
Latest after 3 days check all bearings and suspension-connections. Retighten if necessary.
All bolts must be periodically tightened due to wood shrinking.
The bearings are maintenance-free and depending on the use-frequency. We recommend to check them
regularly of wear and tear.
We recommend you to use a silicon spray for the plastic socket from time to time.
From our years of experience, we recommend to check the complete item each week.
You have to block off the complete item in case of incompleted installation, dismanteling or during repair of
the play equipment.

HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen
7

HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen
8

HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen
9

HUCK Seiltechnik GmbH - Dillerberg 3 – 35614 Asslar-Berghausen
10
13.Post
14.Playingsurface
15.Topoffoundation
16.Basiclevelmark
If the playing surface is sand you have to make the top of foundation round (as you see in the upper
sketch), if you let in the foundation 20 cm deep under the upper edge of the playing surface.
In any case it is very important that you slop the top of foundation to prevent accumulation of water (danger
of rotting).
Questo manuale è adatto per i seguenti modelli
1
Indice
Altri manuali Huck Altalena
Manuali Altalena popolari di altre marche

Ledon
Ledon 1185 Manuale utente

Backyard
Backyard LITTLE BRUTUS 2051171 Manuale per l'uso e la cura

Component Playgrounds
Component Playgrounds CP-PS24-8x10 Manuale utente

Kettler
Kettler 0S01053-0000 Manuale utente

Lemeks
Lemeks Palmako MV70-3121-4 Manuale dell'installatore

Lifetime
Lifetime 90143 Manuale utente

Component Playgrounds
Component Playgrounds AF30 Manuale utente

OOGarden
OOGarden FOSSA Manuale utente

Lakeland Mills
Lakeland Mills CF1128 Manuale utente

Backyard Discovery
Backyard Discovery MONTPELIER 30211F Manuale utente

LifeSpan Kids
LifeSpan Kids AMBER PE83 Manuale utente

SPORTSPOWER
SPORTSPOWER MSC- 4132 Istruzioni per l'installazione







