Inta HIPER II Manuale utente

In this document Inta have endeavoured to make all the informaon
and procedures accurate. Inta cannot accept responsibility should it
be found that in any respect the informaon is inaccurate or
incomplete as a result of future developments.
05/20 E&OE
Installaon and Operang Manual
Twin Plate Heat Interface Unit
Instantaneous priority hot water and heang

1. Important informaon and introducon
2. Dimensions
3. Components and schemac
4. Accessories
5. Installaon
6. Electrical wiring
7. The HIU Controller rst power up and set up, features and funcons
8. Commissioning
9. Maintenance instrucons and 9A Pump operang LEDs
10. Fault nding
11. Technical specicaon
12. Spares
13. Warranty
These instrucons describe the installaon, assembly, operaon, maintenance and fault nding of the Hiper Heat
Interface Unit (HIU). For operaon of the enre plant, the technical documentaon of all the components used
such as, boiler, tank, pumps, pipework and valves must be complied with. Inta does not accept any responsibility for
the design and performance of the heat network or components outside of the HIU.
Installaon should only be carried out by a qualied and competent plumbing installer and a qualied and
competent electrical installer in accordance with the current Building, Water and Electrical Regulaons, Legislaon
and Standards. Do not start installaon unl you have thoroughly read and understood these Assembly and Oper-
ang Instrucons and have complied with all safety provisions.
Symbols used in this manual :
DANGER – immediate risk of physical injury or even death.
DANGER – immediate risk of serious damage.
IMPORTANT – informaon crical to the installaon or installer.
IMPORTANT – informaon crical to the user.
NOTE – useful informaon regarding the operaon or installaon of the HIU.
SECTION 1 - Important informaon and introducon
Heat Interface Units (HIU) deliver heat generated from a centralised heang plant to mulple homes,
apartments or ats. The Inta Hiper HIU interfaces the heat network and dwellings systems through plate heat
exchangers and a control valve regulates the supply of heat to provide hot water (DHWS) and room heang (HTG) to the
dwelling. The Inta Hiper HIU has been developed to this concept with unique control
features to opmise its performance and operaon.
Heat from the main boiler plant is transferred to the home by two plate heat exchangers. One plate heat exchanger (PHE)
provides the hot water supply (DHWS) and the other plate heat exchanger supplies the central heang circuit (CH).
This can be by either radiators or underoor heang, the installer has the opon to commission for either.
HIUs do not generate their own heat so to deliver DHW and CH most suitable for the requirement of the home or apartment it
is the responsibility of the installer and or system designer that the heat network delivers heat at
sucient ow rate and temperature to do so.
05/20 E&OE
Installaon and Operang Instrucons SECTIONS
Page 2

D
E
A585 mm Height
B465 mm Width
C265 mm Depth
D100 mm Pipe Distance
E140 mm Pipe Distance
Dimensions
05/20 E&OE
Clearances
G
F
H
FSides 30mm
GBelow 300mm
HAbove 200mm
IIn front 50mm
I
SECTION 2 - Dimensions and components
Page 3
Hiper II Heat Interface Units Code
Hiper II Twin Plate HIU SZ 80kW DHW, 3 - 30 HTG HIPER2TPSZ80
Hiper II Twin Plate HIU 15-80kW DHW, 3 - 30 HTG ZENNER HEAT METER HIPER2TP1580ZE
A
CB

SECTION 3 - Components and schemac
7CH Circulang
Pump
8Automac air
vent
9Safety pressure
relief valve
10 Low pressure
switch
11 Plate heat
exchanger
(PHE)
12 Expansion
Vessel
13 Pressure gauge
14 Shock arrestor
15 Flushing bypass
accessory
16 Flow meter
switch
17 Temperature
sensor
18 Heat meter
posion
110mm pipe
05/20 E&OE
Page 4
Safety valve discharge pipe
Filling Group
CH Return
Cold Supply
CH Flow
DHW Supply
DH Return
DH Flow
Schemac Hiper II HIU
1
1
1
2
18
4
4
4
4
4
4
5
6
7
89
10
11 16
12
13
15
14
17
11
17
17
17
17 2
2
3
1Drain valve /
air venng
2Strainer with
drain valve
3Pocket for heat
meter sensor
4Isolaon Valves
Red - Flow
Blue - Return
5Diverter Valve
6Pressure
independent
control valve
(PICV)

SECTION 3 - Components and schemac
1. Drain / air venng
2. Strainer with drain valves
3. Pocket for heat meter strainer
4. Isolaon Valves
5. Diverter valve actuator
6. Pressure independent control valve & actuator
7. CH Circulang pump
8. Automac air vent
9. Safety pressure relief valve
10. Low pressure switch
11A DHW Plate heat exchanger
11B CH Plate heat exchanger
12. Expansion vessel 8 Ltr
13. Pressure gauge
14. Shock arrester
15. Flushing by pass connecons
16. Flow meter switch
17. Temperature sensor
18. Heat meter posion 110mm pipe
19. Filling group
20. PID Controller
05/20 E&OE
11B
14
16
Rear view of HIU with the HIU back panel made hidden
12
Page 5
3
1
6
15
2
18
2
View from underneath
19
20
3
2
4
7
9
10
13
20
17
4
View from above
5
1
5
8
11A
12
11B
1

SECTION 3 - Components and schemac
05/20 E&OE
ACCESSORIES for HIPER 2 TWIN PLATE HIU range Part Code
Flushing By Pass Kit A (temporary pipe). HI2AKITA
Flushing By Pass Kit B (Fixed connecon to HIU with shut o valve). HI2AKITB
Flushing By Pass Kit C (External valve and tee ngs). HI2AKITC
First x JIG. HI2ACJIG
Primary only rst x kit, use with Hiper rst x JIG and supplied with the HIU. HIACPFFKIT
Pair stand o wall brackets. HIAC01SOBPACK
All connecons from above KIT (set of 4 insulated preformed pipes).
All connecons from above KIT (set of 2 pairs M x M isolaon valves).
Lower connecons pipe kit (set of 4 preformed pipes to bring connecons 'back to the wall'. HIAC02BVPACK
Pack of 4 Secondary straight isolaon valves. HIAC03BVPACK
Prepayment relay (for billing systems using a 230v signal). HIAC04230KIT
Security - an tamper xing screws + driver. HIAC05SSPACK
Insulaon jacket for HIU isolaon valves. ARM022129
ZE102C5 Zenner Ultrasonic Heat Meter with Mbus. ZE102C5
Page 6
Primary only rst x kit, use
with Hiper rst x JIG
Pack of 4 Secondary isolaon valves Pack Wras approved Pair stand o wall brackets Lower connecons pipe kit
Accessories - ‘First Fix Jig’
The installaon plan may require pipe work to be made up to the
posion where the HIU is to be installed, but at this stage not involve
installing the HIU itself. At this ‘rst x’ stage not having the HIU in
posion eliminates risk of damage or even vandalism while the
property is not secure.
Using the Jig allows pipe work to be installed without the HIU and
saves the cost of the purchase of a ‘rst x rail’ for every HIU.
This simple method allows the wall bracket, pipes and isolaon valves
to be posioned. Then the Jig is removed, and the installer moves to
the next installaon and so on, unl all rst x pipe work is in place,
and allowing other trades on site to carry out their work. The HIUs
can be installed simply on to the wall bracket and connect to the
isolaon valves at a planned later date.

5.1 Before installaon read and comply with the following
Comply with all safety provisions.
The Installer’s Responsibility -in accordance with Part L of the Building Regulaons, all hot and
cold water pipes should be labelled and insulated to the current standards.
Installaon should only be carried out by a qualied and competent plumbing installer and a qualied and
competent electrical installer in accordance with the current document Building Regulaons, Legislaon
and Standards.
It is the installer’s responsibility to ensure that the place of installaon and wall is suitable.
An unsuitable locaon or provision of adequate supplies (Primary Heang and Cold Water mains) will not
jusfy any warranty or fault claim;
• The wall must be capable of bearing the weight of the HIU lled with water permanently
• Locaons where access is restricted for maintenance, see page 3.
• The HIU is only for WALL MOUNTING in the orientaon shown in this manual.
• Locaons where criminal damage or illegal tampering cannot be reasonably preventable.
• Locaons where discharge pipe is not able to be safely or legally installed and connected
• Supplies which are not suitably clean, and free from contaminants.
• Supplies which contain chemical contaminants.
• Supplies with inadequate ow or pressure (less than 1.5 bar)
• All cold and hot water pipes must be labelled and insulated in line with Part L of the
Building Regulaons
Cold water mains supply should be protected from excessive high pressures.
A Pressure Reducing Valve is recommended and pre-set to 3 bar.
• Wall xing bolts are to be provided by the installer and be suitable to bear the weight of the HIU perma-
nently when full of water.
• The posion of the HIU should be where the pipe run lengths to DHW outlets are kept to a minimum.
SECTION 5 - Installaon
05/20 E&OE
5.2 Consider which installaon method is to be used.
1. HIU as delivered to site.
2. HIU and stand o brackets as delivered to site
3. HIU JIG at First Fix Pipe work stage, with the HIU to follow later.
4. HIU JIG and stand o brackets, with the HIU to follow later.
Page 7
5.3 General installaon notes
• Ensure all hot and cold water pipes are labelled and insulated in accordance with Part L of the build-
ing regulaons.
• The HIU can only be installed in one orientaon, with the heat network connecons at the top, and
in a vercal posion.

SECTION 5 - Installaon
05/20 E&OE
Page 8
5.4 Ensure the chosen installaon site is inside the building, weather proofed and provides good access for mainte-
nance, minimum requirements as on page 3. Note where and which pipe connecons will be
Required, and pay aenon to where the safety valve discharge pipe will terminate, and ensure this meets all cur-
rent building regulaons and has a connuous fall. All pipe runs for domesc hot water services (DHWS) should be
at a minimum to prevent water wastage and maximise DHWS delivery mes.
5.5 Making sure the wall the HIU is to be mounted on complies with 5.1, mark up the posion for the wall bracket. The
posion of the HIU is to be on a true vercal plane as in 5.3. Drill and plug the wall, and secure the HIU with suitable
wall xings (not provided with the HIU).
90o
Hang on to the wall
bracket hooks and with
care posion the HIU
against the wall
5.6 Hang the HIU as shown in this illustraon on to the
inner hooks on the wall bracket.
5.8 Plumbing Connecons LOWER
C 3/4” Heang Flow (radiators or
underoor heang.
D 3/4” DHW Supply
E 3/4” Cold Water supply
F 3/4” Heang Return
G 1/2” Safety valve discharge
Make connecons with HIAC03BVPACK
Oponal - use HIAC02BVPAC (see page 6)
CDEF
G
AB
5.7 Plumbing Connecons UPPER
A Heat Network Flow
B Heat Network Return
Make connecons with
HIACPFFKIT
Isolaon valves
3/4” F Union nut x 3/4” M
and wall bracket
HIAC03BVPACK
C & D use red handles
E & F use blue handles
3/4” F Union nut x 3/4” M
A
B

5.9 For lling the Heang Circuit for the radiators or UFH, the lling
valves and connecng pipes are integral to the HIU.
This may be removed while pipe work and isolaon valves are made
good. Ret when commissioning.
On compleon of lling the heang the temporary connecon pipe
between cold Water supply should be removed, and le for later use
inside the HIU.
Wras approval number 1804045
SECTION 5 - Installaon
Page 9
05/20 E&OE
Cold water lter
Electrical connecons cable glands.
Safety valve
discharge
connecon
Accessory opon - stand o brackets (SOB)
5.10 Stand o brackets create a space behind the
HIU that can be used to run pipes in.
The stand o brackets are 40mm o the wall allow-
ing for 13mm pipe insulaon thickness.
First aach the brackets using 4 x xing screws to
the back of the HIU in the matching xing holes pro-
vided.
Fit the wall bracket as in 5.6 and per 5.1
Then hang the HIU as in diagram 5.6, but this me
using the outer wall bracket hooks.
Use outer bracket hooks.
5.11 Safety valve discharge pipe.
The safety valve has a 1/2” F threaded connecon for 15mm pipe to
be connected to (15mm x 1/2” M compression coupling to be provid-
ed by the installer).
The discharge pipe should have a connuous fall and conform to
BS6798.
Where the pipe empes into a drain then that area must be frost free,
and consideraon as to a trap being include as well as a tundish to
maintain any discharge is fully visible. Discharge connecon

SECTION 5 - Installaon
Page 10
05/20 E&OE
5.12 Accessory opon - pre-formed pipes
Also available are me saving pipes which are formed to run behind the HIU
and make all the connecon from above
The isolaon valve kit that can be used for this are 3/4” MxM union nuts, and
seal with bre washers., and can be ed either below or above the HIU.
First aach the brackets using 4 x xing screws to the back of the HIU in the
matching xing holes provided.
Fit the wall bracket as in 5.6 and per 5.1
Fit the stand o brackets as per 5.10
The isolaon can be connected either;
• Below the HIU
• Above the HIU
Hang the HIU as in diagram 5.6, using the outer wall bracket hooks.
All connecons from above
Set of 4 preformed insulated pipes
5.13 Accessory opon - rst x JIG HI2ACJIG
oo
1. Mount the wall bracket as per 5.5
2. Hang the JIG, as in 5.6
3. Make the isolaon and pipework con-
necons as in 5.7 and 5.8
4. Remove the JIG, and move on
to the next installaon site.
Wall bracket and valves and pipes
are in posion ready to receive
the HIU at a later date.
Repeat as required, the JIG is an
installaon tool.
Clip and insulate pipes
Clip and insulate pipes
Minimum 22mm pipe
JIG
Isolaon valves packs
HIACPFFKIT
HIAC03BVPACK
Use HIAC02BVPACK for best pracce,
(in place of HIAC03BVPACK) - see page 6
Flushing Bypass Kit C ed at this point in rst x installaon!
Altri manuali per HIPER II
1
Questo manuale è adatto per i seguenti modelli
2
Indice
Altri manuali Inta Sistema di riscaldamento