Kiturami eco condensing - 16D Guida utente

Gas fired wall hung combination boilers
┃┃┃┃┃
Technical information and Installation Servicing Instructions
Model
eco condensing - 16D (18.6 kW)
eco condensing - 20D (23.2 kW)
eco condensing - 25D (29.1 kW)
eco condensing - 30D (34.9 kW)
eco-condensing Gas Boiler.................. …
…...………....

CONTENTS
1) overall view
1-1 Genearal information
2) Product description
2-1 Specification
3) Installation
3-1 Standard installation
3-2 Body installation
3-3 Connecting Flue
3-4 Piping for upper floor
4) Connecting Electric works
4-1 connecting wires
5) Test warking
5-1 Check list befor
5-2 First ignition operation
5-3 Water circuit Diagram
5-4 Checking the CO2
5-5 Adjustment and gas conversion
6) Direction for assembly
6-1 Disassembly
6-2 Part list
7) Maintenance guide
7-1 Main heat exchanger
7-2 Burner unit
7-3 Fan unit
7-4 controller unit
7-5 Temperature sensor
7-6 Over heating sensor
7-7 Gas valve
7-8 Circulation pump
7-9 3Way valve
7-10 Others
8) Function of the controller
8-1 Main controller
8-2 Function
9) Function of the controller
9-1 Room controller panel
9-2 LED Panel
10) Troubleshooting guide (error code)
10-1 Finding failure
11) Technical Data Table
12) Memo
13) Warranty

1. World-best level of thermal efficiency at over 90.8% of domestic heating and over 92% of hot water supply,
equipped with 4 pass main heat exchanger in world-first.
2. Consideration on Eco-Environment
(Low Nox burner controls the Nox emissions under 20ppm.)
3. Equipped with condensate neutralization device
(Durable condensate neutralization device works the strong acidity(PH3~4)
of condensate down the normal water(PH6).
4. Safety low voltage and powerful TURBO-FAN
(Powerful turbo fan offer the steady combustion system without interruption from the changeable wind. )
4. Durable condensing heat exchanger
- Aluminum and Stainless steel material of main heat exchanger extends its life cycle.
- And double collecting condensate design makes to work longer than others
* eco-condensing gas boiler Features of Product

7. Lasting Stainless steel heat exchanger for hot water
8. Quick and abundant hot water
- Precise hot water control
※ Hot water can be controlled by 1℃ in the range from 35 to 50℃.
9. Double protection against instantaneous high pressure of water
device and water pressure releaser of inlet pipe
10. Interruption Free operation from any condition of outside
-. With powerful turbo fan and wide proportional control on combustion, it operates efficiently and silently even
on the low pressured gas supply.
11. Thoughtful consideration on safety and convenience.
- It is equipped with gas leakage detector, water hammer protector, and water over-pressure reducer as special
safety devices.
- Additionally there are test operation function, precise water temperature setting function and reservation function
as useful and convenient features.
-. Stainless steel of heat exchanger provide the hot water without rust and block, with the constant efficiency
of hot water exchange.
-. It is designed to protect appliance against water hammer and thermal expansion with water hammer protection

1-1 Specification
Model : WORLD5000
사진
Room Control
34 (74.9) 34 (74.9)
133
B33-C13-C33-C43-C53-C63-C83
eco condensing-30Deco condensing-16D eco condensing-20D eco condensing-25D
199
LNG, 13A, G20, G30
106
WEIGHT (kg)
166
39 (85.9)
Fixing bolt BEND
39 (85.9)
1. Product description
Flue
MODEL
POWER SOURCE
507 x 310 x 788
220 - 240 V, 50Hz
DIMENSION (Wx Dx H)
INSTALLATION TYPE
FUEL TYPE
HEATING AREA (㎡)
AL 1st Heat Exchanger
AL 2nd Heat Exchanger
CU Heat Exchanger
Air Pressure Switch
Turbo Fan
PCB
Syphon
Gas Valve
Circulation Pump
DHW Heat Exchanger
Pressure Gauge
Auto Air-Vent
3 Way Valve
Igniter
Expansion Tank
Temperature sensor

2. Installation
2-1 Appliance dimension and required specification

ㅣ
Installing Boiler
ㅣ
1. The boiler has to be fixed horizontally to the wall with some space for cleaning and maintenance.
2. The wall should support enough to hang 35 ~ 45kg of Boiler and be incombustible surface
3. Before installing the boiler, check the pipes and valves for central heating water in & out-let, domestic hot water in
& out-let, and gas.
ㅣ
Selecting Location
ㅣ
1. Please select the location and position, considering some space for cleaning and maintenance.
2. The wall should support enough to hang the boiler of 35 ~45kg. If need, reinforce the wall before installing.
3. Corrosive gas [ex. Ammonia gas, Chloric gas, Sulfur, Acids, etc] can destroy or rust the boiler, flues, and pipes by a
chemical reaction. And it may reduce the efficiency of heater or igniter. Please avoid this location or clean up the place
before installing Boiler.
4. he boiler should be installed onto the incombustible surface.
5. Please avoid the wet place and hermetically sealed location.
The boiler can be installed on any suitable internal wall (suitable sound proofing may be required when installing onto a stud partition wall).
Provision must be made to allow for the correct routing of the flue and setting of the terminal to allow the safe and efficient removal of the flue
products.
Where a room sealed appliance is installed in a room containing a bath or shower, the appliance and any electrical switch or appliance control,
utilizing mains electricity should be situated specifically in accordance with current IEE Wiring Regulation.
[Installing Boiler]
1. The boiler has to be installed horizontally to the wall with some space for cleaning and maintenance.
2. The boiler has to be fixed firmly with special bolt for its weight and tightly against any vibration.
It is recommended to stick the rubber against vibration.
2-2 Body installation

Warning
The exhaust gas duct must not be contact with or close to inflammable material and must not pass through building
structures or walls made of inflammable material. When replacing an old appliance, the flue system must be changed.
MAX Length
MIN 150 Assemble with
packing without
100
150

2-3-1 FLUE
The provision for satisfactory flue termination must be installed in accordance with local regulations.
The appliance must be installed so that the flue terminal is exposed to outdoor air.
The terminal must not discharge into another room or space such as an outhouse or lean-to. It is important that the
position of the terminal allows a free passage of air across it at all times. The terminal should be located with due
regard for the damage or discoloration that might occur on buildings in the vicinity,
it must also be located in a place not likely to cause nuisance. In cold or humidity weather water vapor may condense
on leaving the flue terminal The effect of such “steaming” must be considered. If the terminal is less than 1 meter
above a balcony, above ground or above a flat roof to which people has access, then a suitable stainless steel terminal
guard must be fitted. The minimum acceptable spacing from the terminal to obstructions and ventilation openings
are specified in Fig. X.
2-3-2 Installing flue (Connecting)
COAXIAL FLUE Connecting
ASSEMBLING the socket of inlet and outlet flue.
1. Join the flue socket on flue outlet.
2. After sealing the top of boiler and socket with gasket,
fix the socket to the boiler body with screw.
JOINING FLUE WITH BOILER
1. Fix the socket, boiler adapter and flue elbow with sealing
tape after adjusting all.
2. After sealing well, join and screw the flue duct adapter.
3. Join and fix the flue elbow to main flue with careful check
of exhaust flue and inlet flue.
4. Seal the joint completely with tape and screw the Flue
duct adapter.
5. Slope down the flue outlet by 3 ~ 5˚ in order to drop the
condensation down.
Flue Air Duct
Flue Duct Adapter
Gasket
Flue Elbow
Flue Duct Adapter
Boiler Adapter
Gasket
Socket
Exhaust Flue

2-3-3 Installing flue (For Roof Terminals)
①
For Roof Terminals
1. In the case of a pitched roof 25-50 degrees, position the lest
tile to replace/flash over existing roof tilling. Make an aperture
in the roof suitable for the lower tube of the roof terminal and
ensure the integrity of the roof cover is maintained. The
adjustable plastic collar can either be positioned. on the lead
tile or the lower tube of the roof terminal prior to the final
positioning of the vertical flue through the tile Check the collar
is correctly located to suit required roof pitch (either 25˚ to 38˚ or
37˚ to 50˚) From inside the roof adjust the to vertical position and
secure to the roof structure with the clamp supplied.
2. For flat roof installations the aluminum flashing must be
incorporated into the roof covering and the appropriate aperture
aperture made in the roof decking. The vertical flue is lowered
onto the flashing. (A mastic seal may be necessary). From inside
the roof, structure with the clamp supplied
IMPORTANT : If the boiler is not fitted immediately after the flue
System, temporary precautions must be taken to prevent rain entry
into the room of installation, Any precautionary measures must
be removed prior to commissioning the boiler.
② Flue Dimensions
The standard horizontal telescopic flue kit allows for lengths between
315mm and 500mm from elbow to terminal (Fig 13)
The maximum permissible equivalent flue length is :
10 meters (60/100 system)
20 meters (80/125 system)
③ Flue Trim
1. The rubber flue trim supplied may be fitted to either the outside
wall or on the inner wall of installation.
④ Terminal Guard (Fig. 14)
1. When codes of practice dictate the use of terminal guards, they
can be obtained from most Plumber' and Builders' Merchants.
2. There must be a clearance of at least 50mm between and part
of the terminal and the guide.
3. When ordering a terminal guide quote the appliance name and
model number.
4. The flue terminal guide should be positioned centrally over the
terminal and fixed as illustrated.
⑤ Flue Deflector
1. If required push the flue deflector over the terminal end and
rotate to the optimum angle for deflecting plume. Secure the deflection
to the terminal with screws provided
Questo manuale è adatto per i seguenti modelli
3
Indice
Altri manuali Kiturami Caldaia

Kiturami
Kiturami TURBO CONDENSING - 13 Manuale di istruzioni

Kiturami
Kiturami KRH-35B Manuale utente

Kiturami
Kiturami KRP-20PA Manuale utente

Kiturami
Kiturami Elite Fire Tube Combi Manuale di installazione

Kiturami
Kiturami KRP-20A Manuale utente

Kiturami
Kiturami KF Manuale utente

Kiturami
Kiturami PELLET BOILER Manuale utente

Kiturami
Kiturami KF-35B Manuale utente

Kiturami
Kiturami TURBO-21 Manuale

Kiturami
Kiturami WORLD PLUS-13D Manuale



















