Service Manual Traverse Switch • 3EN120401 Rev. 7 8 www.liko.com lwww.hill-rom.com
5.0 Periodic Inspecon Informaon, Traverse Switch
According to ISO 10535:2006 Annex B, Periodic Inspecon of medical device Liko™ overhead rail systems
should be performed at least once a year. Periodic Inspecon Liko™ overhead rail system (3EN111001) is
available in Agile and on the Partner Web.
Periodic Inspecon protocol
Liko™ overhead rail system
3EN111001 Rev. 13
INSTALLATION
Acon required:
Approved Not
approved
1 Decal rail marking
2General inspecon
3* Rails
4End stops
5Ceiling/Wall aachments
System informaon Customer reference
Type of rail system: Agreement No:
S/N: Name:
Approved Max Load: Address:
Year of installaon: Post Code
ADDITIONAL COMPONENTS
N/A S/N:
Acon required:
Approved Not
approved
6* Rail Switches
7 Ultra Twist
8Transfer Motor Traverse
9Acvity Rail
10 Pool Side Lier
ENVIRONMENTAL IMPACT
11 Corrosive environments
LOAD TESTING
Max Load applied:
Approved Not
approved
12 Maximum load rail system Kg: Lbs:
REQUIRED MEASUREMENTS:
N/A
Dimension and unit
Approved Not
approved
3* Joint Gap mm: Inch:
6B* Rail Switch play
mm: Inch:
6C* Turn Table clearance
mm: Inch:
Inspecon sign o
Complete inspecon according to the instrucons (page 2-11), ll in this page and sign below.
Approval to use the overhead system Approved Not approved
If the overhead system has one or more inspecon points “Not approved”, the system must not be used.
Acon required: Acons according to the inspecon items "NOT APPROVED" should be performed immediately. Aer performed acons
sign below. If anything is unclear or if you have quesons, please contact Hill-Rom or your local Hill-Rom representave.
Contact informaon is to be found at www.hill-rom.com.
Inspecon performed by: Date:
Next inspecon:
Inspecon performed in accordance with ISO 10535:2006 Annex B- Periodic inspecon
Liko™ Overhead Rail System must be thoroughly inspected at least once per year. Inspecon and service must be carried out by Hill-Rom authorized personnel.
See "Installaon condion checklist" on next page, to determine how to perform inspecon points 2 and 5.
Periodic Inspecons are available for: Liko™ Overhead Lis (3EN191001), FreeSpan and FreeStand (3EN301001), Accessories (3EN601001) and Mobile Lis (3EN371001)
North America only: For non Liko™ Rail system, use “Non Liko® Rail Installaon Periodic Inspecon” (193725)
If printed: Make a colour print of this instrucon.
Liko technical documentaon can be found on the Partnerweb:
hps://partner.liko.com - “My informaon” - “Documents”
If you don’t ha
ve access, send a mail f
or regis
tra
on to: se.cust
omer
[email protected]
Periodic Inspecon may only be performed by personnel authorized by Hill-Rom and using
original Liko™ spare parts.
Available Liko Periodic Inspecons:
• 3EN371001PeriodicInspeconLiko™mobilelis
• 3EN111001PeriodicInspeconLiko™OHrailsystem
• 3EN191001PeriodicInspeconLiko™overheadLis
• 3EN301001PIFreespan™-Freestand™freestandinglisystems
• 3EN601001PeriodicInspeconLiko™accessories
Also available is Periodic Inspecon Slings. This inspecon should be performed by a person who is
suitable, has good experience and sucient knowledge about design, use and maintenance of the sling.
• 7EN160834GeneralPeriodicInspeconProtocolLikoSlingsandSabinaSupportVests
NOTE!
Periodic Inspecon shall be performed at least once per year.
INFORMATION