Mimio Board Manuale utente

Setup Guide for
For Windows 98SE/Me/2000/XP/Vista
& Mac OS X 10.3.9 or later
Use this to quickly setup and use your mimio Board or mimio Board HD.
Board

mimio Mouse - Ergonomic stylus with left-click, right-click, and
hover functions.
Wireless Receiver - Plugs into any available USB port, provides
a wireless link to your mimio Board.
USB Cable - 16ft (5m) USB cable to connect your mimio Board to
your computer.
USB Extension Cable - Extension cable for the wireless USB
Receiver, for computers with very close USB ports.
AC Adapter - Provides persistent power for your Wireless
mimio Board.
mimio Studio CD - Advanced user friendly interactive
application suite.
AA Battery - Battery included for your mimio Mouse stylus.
Microsoft Windows
• IBM compatible, Pentium 166 MHz minimum
• Windows 98SE/Me/2000/XP/Vista
• 32 MB RAM minimum (64 MB RAM recommended)
• 30 MB free disk space minimum
• CD-ROM Drive
• Available USB port
Accessory Box Contents
System Requirements
Mac OS X
• 400 MHz processor (800 MHz or faster recommended)
• Mac OS X version 10.3.9 or higher
• 128 MB RAM minimum (256 MB RAM recommended)
• 30 MB free disk space minimum
• CD-ROM Drive
• Available USB port 1

Setup Process
Install the mimio software from
CD if not already installed. Check
our website for the latest mimio
software (www.mimio.com).
1
2
2
Plug the Wireless Receiver into
an available USB port. If there
is insufficient space to fit the
Wireless Receiver into a USB
port, the included USB Exten-
sion cable can be used with the
Wireless receiver to allow for
the USB connection.

Setup Process continued
3
3
4
Install AA battery into the mimio Mouse stylus.
Power on mimio Board using the included AC Adapter.

Setup Process continued
4
Project desktop image onto mimio Board surface. Make
sure there is a 2-3” buffer between the left edge of the
projected image and the left edge of the mimio Board.
6
5
Press the interactive button on the mimio Board
to begin the calibration routine. Follow onscreen instructions.

Using the Interactive Mode
5
ł8VHWKHPLPLR0RXVHVW\OXVDVDPRXVHWRFRQWURO\RXUGHVNWRSRU
WRLQWHUDFWZLWKDSSOLFDWLRQV
ł3UHVVWKH+RYHUIURQWEXWWRQRQWKHPLPLR0RXVHVW\OXVWRKRYHU
WKHPLPLR0RXVHRYHU\RXU'HVNWRSRUDSSOLFDWLRQ
ł3UHVVWKH5LJKW&OLFNEDFNEXWWRQRQWKHPLPLR0RXVHVW\OXVWR
H[HFXWHDULJKWFOLFNDWWKHFXUUHQWPLPLR0RXVHORFDWLRQ
ł8VHWKHIORDWLQJPLPLR7RROVWRDQQRWDWHRQWRSRIDQ\
DSSOLFDWLRQ)ROORZVWHSVEHORZ
&OLFNRQWKH6FUHHQ0DUNXSEXWWRQWR³IUHH]H´WKH
SURMHFWHGLPDJHIRUDQQRWDWLRQ
8VHWKHYDULRXVGUDZLQJWRROVRQWKH'UDZWDERIWKH
PLPLR7RROVWRDQQRWDWHWKHSURMHFWHGLPDJH
&OLFNRQWKH0RXVHEXWWRQWR³XQIUHH]H´WKHSURMHFWHG
LPDJHDQGWRDXWRPDWLFDOO\VDYHWKHDQQRWDWHGLPDJHIRU
ODWHUUHWULHYDOIURPWKH0DUNXSVWDERQWKHPLPLR7RROV
ł8VHWKHPLPLR1RWHERRNDSSOLFDWLRQWRFUHDWHDQGSUHVHQWFRQWHQW
)RUPRUHLQIRUPDWLRQDERXWXVLQJ\RXUPLPLR%RDUGLQWHUDFWLYHO\
SOHDVHFKHFNRXWWKHFRPSUHKHQVLYHPLPLR6WXGLR8VHU¶V*XLGHRQWKH
PLPLR6WXGLR&'

User Interface
6
link status
data
transmission
power indicator
learn button*
Link Status Indicator
Green: A wireless link is established between the mimio Board and
the computer.
Amber: There is no wireless link between the mimio Board and the
computer. Refer to the Troubleshooting Section.
Flashing green: mimio Board is in Learning Process*.
Data Transmission Indicator
Slow flashing green: System is idle.
Fast flashing green: mimio stylus pen is in use.
Off: No data is being communicated between the mimio Board and
the computer. Refer to Troubleshooting Section.
* Refer to the Learning Section for more information.

Wall Mounting Instructions
7
It is important that walls or plaster be completely dry before installing
a board, as any moisture may cause the panel inserts to warp.
Complete hanging hardware is included with each unit. If wall
construction prevents the use of hardware as furnished, it is the
responsibility of the customer to furnish the required fasteners.
REFER TO WALL MOUNTING DIAGRAM ON PAGE 8
1) Locate wall studs on which to attach mounting rail. Determine
desired mounting height, measuring from the floor to the top of the
unit. Snap a chalkline along the wall at the desired location for the top
edge of the Crest-Line unit.
2) Mark the hole locations along the mounting rail (long leg up) to
correspond with stud locations in the wall. NOTE: Minimum hole
locations is 6” in from each end of the mounting rail and at approxi-
mately 24” spacing along the length of the mounting rail). Drill 13/64”
holes at each location marked on the mounting rail.
3) Align mounting rail (long leg up) along chalkline and mark on the
wall the location of the holes drilled into the mounting rail. At each
hole location marked on the wall, drill 1/4” holes 1” deep for expansion
plugs.
4) Install the mounting rail with the long leg up. It may be necessary
to shim out the mounting rail on uneven or irregular walls.
5) Subtract 1-1/4” from overall height measurement of unit being
installed. Using this figure, measure down from top of mounting rail.
Install L-Clip screw at this point. Leave L-Clip in down position. L-Clips
should be installed 6” in from each bottom corner and evenly space
along length of board.
6) Hang unit on mounting rail. Make any slight adjustment to desired
position by sliding to left or right. Be sure unit is hanging level.
7) Tap L-Clips up against bottom of the unit and drill holes into alumi-
num trim (holes must be smaller than diameter of screws). Fasten clip
to trim with screw furnished.
READ INSTRUCTIONS COMPLETELY BEFORE INSTALLING.

Wall Mounting Instructions continued
8
TRIM
HANGER BAR
L CLIP
#10 x 2 1/2”
SCREW WITH
PLASTIC SCREW
ANCHOR
#6-20 x 1/2”
DRILL & TAP SCREW

Floor Stand Assembly Instructions (optional)
9
READ INSTRUCTIONS COMPLETELY BEFORE ASSEMBLING.
Vertical Support Leg Vertical Support Leg
Top crossbeam with pre-installed board mount brace
Bottom Crossbeam
hex key
6 bolts
6 washers
* Verify all floor stand parts listed below are included in the box.
2 sheet metal screws
Indice
Altri manuali Mimio Lavagna interattiva


















