mitko DOME M5 Manuale utente

EN lDE lLT lCZ lPL
DOME
MANUAL lGEBRAUCHSANWEISUNG lINSTRUKCIJA lNÁVOD lINSTRUKCJA

3/28
ENGLISH
WE RECOMMEND
1. Useprotecveglovesduringassembly.Becarefulnottogetcutwhenyouconnect
proles.
2. Atleast2peopleareneededtosetupandtakedownthetent.Werecommend
askingthe3rdpersonforhelpwhileinstallingthemiddlepole.
3. Inordertomakesengupeasy,thecomponentshavebeengivensckers.Connect
theelementsaccordingtothesckers.
4. Itisadvisedtocleantheframebeforefoldingit,failuretodosomightdamagethe
frame.Ourcompanyisnottakinganyresponsibilityforanydamagesoccurringasa
resultoffoldingadirtyframe.
5. Thefabric(roofandsidewalls)shouldbecleanedanddriedbeforepackingitinto
transportbags.Ourcompanydoesnotbearanyresponsibilityforpossiblestains
arisenasaresultofstoringwetordirtyfabric.
6. Forcareinstruconseeconservaonmanual.
7. Toremovethepinsandanchors,werecommendthatyouuseaninstrument(thatis
notincludedinthestandardtentequipment)
SAFETY
1. TheDometentisnotdesignedtobeusedduringstrongwind,snowstorm,
hailstorm,storm,etc.
2. Thetentmustnotbelewithoutanysupervision.
3. Thetentsarenotadaptedtoexploitaonundersnowload.Oneshouldremovethe
DOME – MANUAL
Figure1.DomeM5tentcomponentlist
Figure1.DomeM6tentcomponentlist

4/28
ENGLISH
Wind
speed
[km/h]
Ground Weight / Anchor for each
foot
Anchor for rope mounted
under 45°
< 50
Concrete
substrate 2×27,5kg** –
Ground
substrate 3×steelanchor34cm* Twistedsteelanchor,
length34cm*
50–100
Concrete
substrate
3×standardsegmentanchor
HSA-RM6×8530/40***
Sleeveanchor(closed
eyebolt)HLC-EC16×100***
Ground
substrate 3×steelanchor34cm* Steelanchorlength45cm
*Tent’sstandardequipment
**Non-standardtentequipmentaccessory
***Art.oeredbyHil(Poland)Sp.zo.o.hps://www.hil.pl/)
Table1.Waystoanchoratent
snowgatheringontheroof,ifthelayerofthesnowis2cmorhigher.
4. Waterlingeringontheroofshouldbeimmediatelyremoved.
5. Withrecurringgustsofwind,anchoringshouldbecheckedsystemacally.
6. Producerdeclaresthatthestasccalculaonsforthetentwerecarriedoutin
accordancewithPN-EN13782:2005normconcerningTemporaryobjects,tents,
safety.Thetentmaybeusedinazonewithwindupto28m/s(100km/h)provided
itisprotectedagainstwindgustsasdescribedintableno.1.Duringstrongwindthe
productshouldbefoldedimmediately.Mechanicaldamageresulngfromfailureto
followtheaboverecommendaonsarenotcoveredbythewarranty.
ASSEMBLY SEQUENCE
1. Takeoutthecomponentsofthetentfromthebagandlayonevenground.
2. Theprolesareedwithcordstokeepthemtogether.
3. Connectintoarchestheproleswhichmaketheentrancess.Connectintoarches
theprolesoftheload-bearingstructure.
4. Inserttheproleoftheload-bearingstructureintothe5-wayconnector.
5. Litheframe(werecommendusingaladder).Releasebuonswillplace
themselvesinproleholes.
6. Settheprolesontheotherfeet.
7. Settheprolesthatmaketheentrancesonthesidetubesofthefoot.

5/28
ENGLISH
Figure3.InstallaonsequenceofDomeM5tent

6/28
ENGLISH
Figure4.InstallaonsequenceofDomeM6tent

7/28
ENGLISH
8. Makesurethateverypushpinbuonhasbeensnappedontheopeningsinthe
proles.
9. Installthestrutsontheproleswhichmaketheentrancess.Becarefulnotto
damagetheplascstrutscomponents.Donotblockthestruts.
10.Makesurethateveryclipoftheaachedroofisfastened.Next,drapethecanvas
overtheframe.
11.Onthetopoftheframeinsertthepolethrusngouttheaddionalroof.
12.Zipupthetunnelsatentrances.
13.Strutsshouldbeblockedonfabricreinforcementsintunnels.
14.Zipupthewalls.
15.Ontheground,securelegsofatentwith33cmlongsteelanchors.
16.Threadtheropethroughaloopandthendragitoutthroughtheopeningintheroof.
17.Fastentheropeto34cmlongtwistedanchor.Thenstretchtheropeata45°angle
andnailtheanchorintheground.
18.Ontheconcreteoor,securethetentwithsandweightsthatareeach27,5kgheavy
(place2weightsoneachfootofthetent,pullittogetherwithstrapsandfastenthe
clamps).
DISASSEMBLY SEQUENCE
1. First,unzipthewallsandnext,removethebungeecordsandthepins.
2. Removethepinsxedbesidethetentlegs(takeotheweightsorunscrewthe
anchors).
3. Removethespreaderstensingtheframe.
4. Unzipthetunnelsatentrances.
5. Removethepolethrusngouttheaddionalroof.
6. Removethecanvasfromtheframe.
7. Pressingthepushpinbuonsin,removetheprolesfromthetubesonthefeet.
8. Removethe5-wayconnector.
9. Disconnecttheproles.
10.Putthecomponentsofthetentintothebag.
TheProducerreservestherighttoimplementchangestoaboveinformaon.
THE PRODUCER:
MITKOSp.zo.o.
Osiedle1Maja16G|44-304WodzisławŚląski|Poland|TIN:PL6470509572
Tel.+48324446616|Fax:+48327570920|kontakt@mitko.pl|www.mitko.pl

8/28
DEUTSCH
EMPFEHLUNGEN
1. BiebenutzenSiezumAuauArbeitshandschuhe.AchtenSiebesondersbeim
VerindenderProledarauf,dassSiesichnichtverletzen.
2. MontageundDemontagedesZelteserfordertmindestens2Personen.Eswird
empfohlen,dass3PersonenbeimAuaudeszentralenMastshelfen.
3. UmdieKonstrukonselementeleichterzusammensetzenzukönnen,sinddiese
markiert.VerbindenSiedieElementeentsprechenddenAulebern.
4. AchtenSiedarauf,dassdasGestellvordemAbbauensauberist.UnsereFirmaträgt
keineHaungfüreventuelleBeschädigungen,diebeimAb-undAuaueneines
verschmutztenGestellsentstehen.
5. VordemVerpackenistderZeltstozureinigenundzutrocknen.
SICHERHEIT
1. DasZeltDomeistfürdieVerwendungbeistarkemWind,Schneestürmen,Hagel,
Stürme,etc.nichtgeeignet.
2. DasZeltdarfnichtunbeaufsichgtgelassenwerden.
3. BeiderVerwendungindenWintermonatenmitSchneefall,istdieSchneelastauf
demZeltdachzukontrollieren.DerSchneeistvomZeltdachzuenernen.Eine
Schneehöhevon2cmistzulässig.
4. Wasseransammlungensindzuvermeidenundmüssenenerntwerden.
Zeichnung1.InhaltDomeM5
DOME – GEBRAUCHSANWEISUNG
Zeichnung2.InhaltDomeM6

9/28
DEUTSCH
Wind-
geschwindigkeit
[km/h]
Unter-
grund
Gewicht/Hering pro jeden
Fuß
Hering/Anker mit
Abspanseil pro jedes Bein
( 45°)
< 50
Fester
Boden 2×Sandballast27,5kg** —
Weicher
Boden
3×Stahlhering,
Länge34cm*
Torsionsstahlhering,
Länge34cm*
50–100
Fester
Boden
3×Segmentsicherung
HSA-RM6×8530/40***
HülsenankerRingschraube
geschlossen
HLC-EC16×100***
Weicher
Boden
3×Stahlhering,
Länge34cm*
Stahlhering
Länge45cm**
*StandardausrüstungdesZeltes
**ZubehörderNicht-Standard-AusrüstungdesZeltes
***Art.angebotenvonHil(Polen)Sp.zo.o.(hps://www.hil.pl/)
Tabelle1.ArtenderAbsicherungdesZeltes
5. DerHerstellerdeklariert,dassdiestaschenBerechnungendesZeltesgemäß
derNormPN-EN13782:2005-„TemporäreObjekte-Zelte-Sicherheit“.DasZelt
kannbiszueinerWindstärkevon28m/sek(100km/h)genutztwerden,unterder
Voraussetzung,dassesgegenWindstößegeschütztist,wieinTabelle1beschrieben.
BeieinerWindstärkeüber50km/h(6GradBeaufort-Skala)empehltessich,das
Produktzudemoneren(zuerstsinddieWändezudemoneren,danndasDach).
MechanischeSchäden,dieausfalscherHandhabungentstandensind,fallennicht
unterdieGarane.
AUFBAU
1. NehmenSiealleElementedesZeltesausderTascheundlegenSiedieseaufeine
ebeneFläche.
2. SteckenSiedieProlezusammen.Sokönnendiesenichtmehrverlorenwerden.
3. VerbindenSiedieVersteifungsproledesEingangszueinemBogen.VerbindenSie
dieRasterprolezuBögen.
4. MonerenSiedie5-fachVerbinder.
5. HebenSiedieGestängemitHilfeeinerLeiteran.WährenddessenrastendieKnöpfe
vonsichselbstindieLöcherindenProlenein.
6. StellenSiedasGestängeaufdieFüßenachdemSievorheralle5-fachVerbinder
monerthaben.

10/28
DEUTSCH
Zeichnung3.AuaudesDomeM5Zeltes
Indice
Lingue:
Altri manuali mitko Tenda























