Peri UP Flex Staircase 100 with Deck UDG Istruzioni per il montaggio

PERI UP Flex
Staircase 100 and 125 with Deck UDG
Instructions for Assembly and Dismantling – Short lift system to NASC SG4:15 – dition 01 | 2019

Amendment L g
Version Details Issue Date
0 First Issue Jan. 2019

Overview 1
Intr ducti n 3
Safety c nsiderati ns 4
Part A
Assembling and Dismantling
A1 Assembling the base 5
A2 Assembling the first level 7
A3 Assembling additional levels 10
A4 Assembling the top level 13
A5 Anchoring 15
A6 Dismantling 17
Applicati n
A7 Base reactions 20
Page
C ntent
PERI UP Flex Staircase 100 and 125 with Deck UDG
Instructions for Assembly and Dismantling – Short lift system to SG4:15

Overview
1
Presentati nal reference:
The illustrations on the front cover of these instructions
are intended to be system representations only. The
assembly steps presented are examples using the
illustrated component sizes. They are also valid for
alternative component sizes.
Key
Pict gram │ Definiti n
Safety Instructions
Note
Visual check
Tip
Dimensi nal specificati ns
Dimensions are specified in mm. Other
units of measurement (cm) are used in
product descriptions.
C nventi ns
Instructions are numbered in
sequence: 1. 2. 3. etc.
Components are labelled with
numbers corresponding to the
overview drawing and are referenced
within the text in brackets thus (1).
Multiple component numbers
indicating alternatives are represented
with a slash: 1 / 2 etc.
Arr ws
Arrows represent an action
PERI UP Flex Staircase 100 and 125 with Deck UDG
Instructions for Assembly and Dismantling – Short lift system to SG4:15

Overview
C mp nents:
1. Adjustable Base Plate UJB
2. Base Standard UVB 24
3a. Ledger UH 250, UH 250 Plus*
3b. Ledger UH 200, UH 200 Plus*
3c. Ledger UH 100, UH 100 Plus*
4. Ledger UH 125, UH 125 Plus* (for Stair Tower 125)
5. Standard UVR 300
5a. Standard UVR 200
6. Stair Stringer UA 250/100
7. Stair Step UAR 100
7a. Stair Step UAR 125 (for Stair Tower 125)
8. nd Step UA 100
*Ledger UH may be replaced by Ledger UH Plus
**Steel Deck UDG may be replaced by Industrial Deck UDI
8a. nd Step UA 125
9a. Industrial Deck UDG 25x100
9b. Industrial Deck UDG 25x200
9c. Industrial Deck UDG 25x125 (for Stair Tower 125)
9d. Industrial Deck UDG 25x250 (for Stair Tower 125)
10. Node Brace UBK 250/200
11a. Ledger Brace UBL 200/200
11b. Ledger Brace UBL 250/200 (for Stair Tower 125)
12a. H-Brace UBH Flex 250/100
12b. H-Brace UBH Flex 100/100
12c. H-Brace UBH Flex 250/125 (for Stair Tower 125)
12d. H-Brace UBH Flex 125/125 (for Stair Tower 125)
13. Toeboard UPY 100
14. Toeboard UPY 200
2
PERI UP Flex Staircase 100 and 125 with Deck UDG
Instructions for Assembly and Dismantling – Short lift system to SG4:15
12a
12b
5a
3a
5
3c
2
1
11
10
9a
9b
3b 67
3b
8

Intr ducti n
Intended use
Pr duct descripti n
These Instructions for Assembly and
Dismantling are supplementary to the
P RI UP Flex Staircase 100 and 125
with Deck UDG Assembly Instructions
for Standard Configuration. All notes
and data contained therein remain valid.
They describe the configuration for stair
towers as a means of access for
temporary work to be carried out on
working areas situated above ground
level.
The assembly and dismantling
sequences describe a short-lift system
of work in compliance with NASC
SG4:15 Preventing Falls in Scaffolding
Operations.
3
Presentati nal reference
The illustrations indicate the sequences for
one bay size option. They are valid for both
1.00m. and 1.25m. bay options.
Components highlighted in red indicate
temporary installed components removed
before completion of the tower.
PERI UP Flex Staircase 100 and 125 with Deck UDG
Instructions for Assembly and Dismantling – Short lift system to SG4:15

Safety c nsiderati ns
4
Pers nal Pr tecti n
nsure persons are clipped to suitable
anchor point before moving on and off
temporary platforms.
For the scaffolds in this manual, safe
connection points are:
Any Rosette within a completed
scaffold lift.
Any Rosette up to 1m above a top
platform level.
Any Ledger connected between two
uprights within a completed scaffold
lift.
Any Ledger connected between two
uprights up to 1m above a top
platform level.
Inspecting the anch ring
All anchor connections to the supporting
structure should be tested in
accordance with NASC TG4:17
Anchoring Systems for Scaffolding.
PERI UP Flex Staircase 100 and 125 with Deck UDG
Instructions for Assembly and Dismantling – Short lift system to SG4:15

Always begin erecting at the highest
point, preferably at an internal corner.
A1.1 L ad distributing base area
recting the scaffold must follow the
sequence described below!
Settlement must be av ided! The
scaff ld must nly be erected n
suitable distributi n plates n gr und
r structure capable f withstanding
all imp sed l ads!
Lay the Ledgers UH 250 (3a), Ledgers UH
200 (3b) and Ledgers UH 100 (3c) down to
determine the length of the surface to be
scaffolded. This will fix the distance between
the Adjustable Base Plates UJB (1)
A1.2 Adjustable Base Plates UJB
Position Adjustable Base Plates (1) at the
ends of the Ledgers UH 250 (3a), Ledgers
UH 200 (3b) & Ledgers UH 100 (3c).
UJB 38-80/55
Yellow handle
A – Assembly and Dismantling
A1 Assembling the base
UJB 38-50/30
Red handle
Fig.A1-2
Fig.A1-3
5
Fig.A1-1
PERI UP Flex Staircase 100 and 125 with Deck UDG
Instructions for Assembly and Dismantling – Short lift system to SG4:15
A1.3 Changes in base level
Steps, slopes and changes in level can be
accommodated using adjustment of the
Adjustable Base Plates / Base Spindles.
Base Spindles TR 38-70/50, without
coloured handles, may be used instead of
Adjustable Base Plates UJB (1). xtension
range = 47mm – 535mm to top of collar
handle.
Adjustable Base Plates UJB 38-50/30 with
red handles have a maximum extension of
355mm to top of collar handle. Adjustable
Base Plates UJB 38-80/55 with yellow
handles have a maximum extension of 595
mm. to top of collar handle. Check with
P RI for suitability of use.

A1.4 Base Standard UVB
Place Base Standards UVB 24 (2) over the
Adjustable Base Plates UJB (1) and
position at the required distance from the
wall. nsure all UVB Ø11 holes are aligned
in same direction.
2
1
A1.5 Ledger UH & Base Decks
Form a base frame by connecting the Base
Standard UVB 24 (2) with the Ledger UH
250 (3a), Ledger UH 200 (3b) and the
Ledger UH 100 (3c).
Two red Ledgers UH 250 (3a) are
Temporary, they will be removed later.
nsure all Ledgers UH are level by
adjusting the Adjustable Base Plates (1).
Place Steel Decks UDG 200 (9b) on the
Ledgers UH 100 (3c) as an assembly aid
to check squareness.
Four red Decks UDG 25x200 (9b) are
Temporary, they will be removed later.
Do not secure Ledger wedges at this stage
The decks used at the base are an aid to
erection only, they may be removed later.
Ø11
h le
A1 Assembling the base
Fig.A1-6
Fig.A1-4
Fig.A1-5
Fig.A1-8
6
Fig.A1-7
PERI UP Flex Staircase 100 and 125 with Deck UDG
Instructions for Assembly and Dismantling – Short lift system to SG4:15

A2 Assembling the first level
A2.1 Vertical Standards UVR
P RI recommend using UVR 300 (5) at the
first level.
Attach UH Ledgers (3b, 3c) to the Rosette
on the Vertical Standards UVR (5), then
securely fix all wedges at UVB level using
a 500g hammer.
Place provisional Ledgers UH 100 (3c)
shown in red, they will be removed later.
A2.2 First level Ledgers UH
2
Ø11
h le
Ø11
h le
Fig.A2-1
Fig.A2-2
Other combinations of standards (e.g. UVR
200 inside with UVR 300 outside) are
structurally acceptable, but the customer
must ensure safe method of erection &
striking.
Fix UBK 250/200 (10) to the uppermost
Rosette of 2 No UVR 300 (5) shown as
pre-assembly.
Insert Vertical Standards UVR 300 (5) into
the Base Standards UVB (2) ensuring
alignment of the Ø11 holes.
7
Fig.A2-3
Fig.A2-2a
Pre-assembly
Fig.A2-2b
PERI UP Flex Staircase 100 and 125 with Deck UDG
Instructions for Assembly and Dismantling – Short lift system to SG4:15
Questo manuale è adatto per i seguenti modelli
1
Indice
Manuali Sistema di sollevamento popolari di altre marche

Genie
Genie Z-60/34 Manuale utente

Screen Technics
Screen Technics INTERFIT Vertical Up Lift Manuale utente

Mortuary Lift
Mortuary Lift ULTIMATE 1000 Manuale utente

Custom Equipment
Custom Equipment Hy-Brid 3 Series Manuale di programmazione

Custom Equipment
Custom Equipment Hy-Brid Lifts 2 Series Manuale di programmazione

Hy-Brid Lifts
Hy-Brid Lifts HB-P3.6 Manuale di programmazione











