Sun Microsystems ALIGNMENT EELR124A Manuale utente

INSTALLATION
d OPERATION
INSTALLATION
d OPERATION
SUN®an
d
OPERATION
MANUAL
an
d
OPERATION
MANUAL
READ THIS INSTRUCTION MANUAL THOROUGHLY BEFORE
INSTALLING OPERATING SERVICING OR MAINTAINING THE
INSTALLING
,
OPERATING
,
SERVICING
OR
MAINTAINING
THE
LIFT. SAVE THIS MANUAL.
KODIAK QUAD RACK
MODEL: ALIGNMENT EELR124A /
EELR124APKG
SERVICE WHE18406
18000 LB
JUL 2010 REV.- 6-1787
SUN is a trademark of
Snap-on Tools
Corporation
1-800-268-7959

2 of 42
THE FOLLOWING APPLIES TO ALL LIFTS
IMPORTANT SAFETY INSTRUCTIONS
When using this lift, basic safety precautions should always be followed, including
the following:
1. Read all instructions in this manual and on the lift thoroughly before
installing, operating, servicing or maintaining the lift.
2. Inspect lift daily. Do not operate if it malfunctions or problems have been
encountered.
3. Never attempt to overload the lift. The manufacturer’s rated capacity is
shown on the identification label on the power side column. Do not
override the operating controls or the warranty will be void.
4. Only trained and authorized personnel should operate the lift. Do not allow
customers or bystanders to operate the lift or be in the lift area.
5. Caution! Never work under the lift unless the mechanical safety locks
are engaged.
6. Always keep the lift area free of obstruction and debris. Grease and oil
spills should always be cleaned up immediately.
7. Never raise vehicle with passengers inside.
8. Before lowering check area for any obstructions
9. To protect against the risk of fire, do not operate lift in the vicinity of open
containers of flammable liquids.
10. Adequate ventilation should be provided when working on internal
combustion engines.
11. Do not remove hydraulic fittings while under pressure.
12. Do not raise or lower the lift with the vehicle on the Jacking Beam.
SAVE THESE INSTRUCTIONS

3 of 42
TABLE OF CONTENTS PAGE
1.0 GENERAL SPECIFICATION......................................................................4
2.0 TOOLS REQUIRED FOR INSTALLATION.................................................5
3.0 CONTENTS................................................................................................6
4.0 INSTALLATION INSTRUCTIONS..............................................................7
4.1 Chalk Line Layout....................................................................9
4.2 Front And Rear Crossmember Assemblies............................10
4.3 Power Pack Installation..........................................................14
4.4 Hydraulic Installation..............................................................14
4.5 Electrical Connections ...........................................................15
4.6 Cable Installation...................................................................15
4.7 Air Installations ......................................................................16
4.8 Anchor Installation.................................................................17
4.9 Deck Leveling Procedure.......................................................18
4.10 Final Check Of Assembled Lift.............................................20
4.11 Operation Test With Vehicle ................................................21
5.0 SAFETY AND OPERATING INSTRUCTIONS.........................................22
6.0 SAFETY AWARENESS............................................................................23
7.0 RECOMMENDED MAINTENANCE..........................................................24
8.0 PARTS LIST.............................................................................................25
8.1 Lift Assembly .........................................................................25
8.2 Parts List – Lift Assembly ......................................................26
8.3 Tower Assembly....................................................................27
8.4 Parts List – Power Tower Assembly......................................28
8.5 Deck Assembly (Left Side).....................................................29
8.6 Parts List – Deck Assembly (Left Side)..................................30
8.7 Crossmember Assembly........................................................31
8.8 Parts List – Crossmember Assembly.....................................32
8.9 Cylinder Assembly.................................................................33
8.10 Parts List – Cylinder Assembly ............................................34
8.11 Hydraulic And Air Kit............................................................35
8.12 Parts List – Hydraulic And Air Kit .........................................36
8.13 Cable Routing......................................................................37
8.14 Parts List – Cable Routing ...................................................38
8.15 Power Pack Assembly .........................................................39
8.16 Parts List – Power Pack.......................................................40
9.0 AVAILABLE ACCESSORIES ...................................................................42

4 of 42
1.0 GENERAL SPECIFICATION
Maximum Capacity: 18,000 lb. 8,165 kg
Overall Length: 304-7/8” 7468mm
Overall Width: 152-1/8” 3864mm
Down Position Height: 9-1/2” 241mm
Maximum Lifting Height: 72” 1829mm
Maximum Wheel Base: 210” 5334mm
Power Rating: 208-230 Volts, 1Ph., 20 Amp, 60Hz.
Air Requirements: 90 – 120 psi Shop Air
Shipping Weight: 5,465 lb. 2,484 kg

5 of 42
CHECK CONTENTS OF ACCESSORY BOX WITH THE PACKING LIST
ENCLOSED
ATTENTION! This lift is intended for indoor installation only. It is
prohibited to install this product outdoors. Operating environment
temperature range should be 41 – 104 °F (5 – 40 °C). Failure to
adhere will result in decertification, loss of warranty, and possible
damage to the equipment.
2.0 TOOLS REQUIRED FOR INSTALLATION
ROTARY HAMMER DRILL
3/4” CONCRETE DRILL BIT
4’ LEVEL
HAMMER (for anchor installation)
PRY BAR (for shim installation)
CHALK LINE (lift location)
TAPE MEASURE
ELECTRICAL TAPE
STEP LADDER (adjusting cables and/or safety ladder in posts)
SIDE CUTTERS (for cutting shipping straps)
4 WORK STANDS (set up)
STANDARD SOCKETS AND WRENCHES
ALLAN KEY SET
SCREWDRIVER SET
FLOOR JACK OR ENGINE HOIST

6 of 42
3.0 CONTENTS
The lift is packaged to protect it from any damage that may occur during shipping.
The two deck assemblies and crossmembers are packaged together with the
accessory boxes strapped to them.
Main Structural Components:
1 - Left Side Deck Assembly (complete with hydraulic cylinder, sheaves
and cables)
1 - Right Side Deck Assembly
1 - Front Crossmember Assembly (with air cylinder release locks and
sheaves)
1 - Rear Crossmember Assembly (with air cylinder release locks and
sheaves)
Accessory Box Components
Box 1 Contents:
1 - Power Post (with safety ladder)
3 - Post (with safety ladder)
Box 2 Contents:
1 - Hardware Kit (with separate packaging list)
2 - Ramp pin
2 - Front Wheel Stop
4 - Sheave Cover
2 - Approach Ramp
1 - Coupler, ¼”NPT
2 - Recoil Hose
1 - Power Unit 220v/1Ph/3hp
10ft - 1/4” DIA. Polytube
10ft - 3/8” DIA. Polytube
1 - Hose Guard
1 - Hydraulic Hose Assembly (16ft. lg.)
2 - Cable Tie
1 - Air Valve & Filter Assembly
1 - Flow Control
1 - Installation & Operation Manual
1 - Lift it Right Manual “ALI”
1 - Lift it Right Safety Tips
1 - “ALI” Standards
1 - “ALI” Quick Reference Guide
8 - Glide Bearing

7 of 42
4.0 INSTALLATION INSTRUCTIONS
PLEASE TAKE THE TIME TO READ THESE INSTRUCTIONS COMPLETELY.
A QUICK CHECK OF THE CONTENTS OF THE ACCESSORY BOX WOULD
ALSO DECREASE THE INSTALLATION TIME.
•Gather the tools and materials required for the installation.
•Select the location best suited for your lift.
NOTE: In determining lift area check for the following:
- Ease of driving a vehicle on and off the lift.
- Overhead obstructions, low ceiling height, overhead doors, overhead
heaters etc.
- Floor obstructions, uneven floor in lift area, floor drains, work benches,
electrical wiring in floor, etc.
- Concrete grade: Lifts should only be installed on level concrete floors with
a minimum thickness of five (5) inches. Concrete must have a minimum
strength of 4,000 psi., and should be aged 30 days prior to the installation
of the lift.
Recommended clearance around the lift is three (3) feet. Ensure clearance
conforms to local building and fire codes.
Recommended overhead clearance is a minimum twelve (12) foot ceiling
providing 6 feet for the maximum lift height and 6 feet for the supported vehicle.
For vehicles taller than 6 feet it is recommended that the user provides additional
overhead clearance or a shut off mechanism to stop the lift from raising the
vehicle too high.
An outline matching the dimensions shown in Figure 1 will need to be marked
on the floor. Refer to Figure 1 for outline dimensions. Refer to General Lift
Specifications for overall lift dimensions.

8 of 42
TYPICAL BAY LAYOUT

9 of 42
4.1 CHALK LINE LAYOUT
Figure 1. Chalk line layout
•Refer to Figure 1. Make a chalk line parallel to the doorway at least 322-7/8” in
from the doorway. This will be the location for the front face of the tower baseplate.
Call this line "A".
•Determine the center of the doorway and bay. Make a centerline to intersect with line
"A".
•Make a chalk line parallel to line “A”, 263-3/8” back toward the door. Call this line “B”.
•Make two chalk lines spaced 76-1/8” to the left and right side of the centerline
intersecting line “A” and line ”B”. Call these lines, line “C”. These will be the lines that
the outside edge of the tower baseplate runs along.

10 of 42
4.2 FRONT AND REAR CROSSMEMBER ASSEMBLIES
IMPORTANT
NOTE: To determine the front, rear, left side and right side of the decks check the
following:
•The left side deck has the hydraulic cylinder mounted to its underside and
includes the cables. The work steps, attached to the turn plate pocket cutouts,
are located at the front of the lift and should point outward when installed.
NOTE: To determine the front and rear, of the crossmembers check the
following:
•The rear crossmember has three ears for attaching the approach ramps.
There are 2 locating tabs on each side of the crossmembers for positioning the
decks between the crossmembers (see Figure 2).
Figure 2. Front and rear crossmembers
Front Right
Rear Right
Rear Left Front Left
Locating Tabs
Questo manuale è adatto per i seguenti modelli
1
Indice
Manuali Sistema di sollevamento popolari di altre marche

Genie
Genie Z-60/34 Manuale utente

Screen Technics
Screen Technics INTERFIT Vertical Up Lift Manuale utente

Mortuary Lift
Mortuary Lift ULTIMATE 1000 Manuale utente

Custom Equipment
Custom Equipment Hy-Brid 3 Series Manuale di programmazione

Custom Equipment
Custom Equipment Hy-Brid Lifts 2 Series Manuale di programmazione

Hy-Brid Lifts
Hy-Brid Lifts HB-P3.6 Manuale di programmazione











