
213006 | v01_1.8.0
Contents
1 Overview ......................................................5
1.1 General Description ................................5
1.2 Warranty..............................................5
1.3 Type label.............................................5
2 Disposal and recycling ......................................5
3 Important Safety Information.............................6
3.1 Intended Use.........................................6
3.2 Admonitions .........................................6
3.3 Declaration of Conformity ........................7
4 Technical Data ................................................8
4.1 Power consumption and fuse size ..............8
4.2 Dimensions and Weight ...........................8
4.3 Connections Left and Right
models ..............................................10
4.4 Installation recommendation regarding
condensation ...................................... 10
4.4.1 Condensation inside of the
unit.......................................10
4.4.2 Condensation outside of the
unit.......................................10
5 Delivery, Transport, Storage............................. 11
5.1 Transport and storage ........................... 11
5.2 Delivery/Unloading............................... 11
6 Prerequisites for Installation............................. 12
6.1 Location and Space Requirements............ 12
6.2 Wall preparation for mounting
bracket ..............................................12
6.3 Outdoor Air Intake Location
Recommendation................................. 12
6.4 Access to Power supply ......................... 12
7 Installation................................................... 12
7.1 Ventilation Duct Connection and
Insulation ........................................... 14
7.2 Installation and Configuration of
Accessories......................................... 14
8 Electrical connections..................................... 14
8.1 Main board layout ................................ 14
8.2 External connections (Connection
board) ...............................................16
9 Before Starting the System.............................. 16
10 Commissioning ............................................. 16
11 Concluding Routines ...................................... 17