Twine TS-1800 Istruzioni operative

TS-1800 Site Preparation Guide
November, 2022
Revision 1.5
© 2022 Twine Solutions Ltd. All rights reserved.
This document and the information contained herein is CONFIDENTIAL to TWINE Solutions Ltd, and shall
not be used, published, disclosed, or disseminated outside TWINE in whole or in part without TWINE’s
consent. This document contains TWINE trade secrets. Reverse engineering based on any of the
information in this document is prohibited.
This copyright notice does not imply publication of this document.
This document shall not be circulated in part or whole outside TWINE.

Contents
Confidential
TS-1800 Site Preparation Guide
Page 2
Hatnufa 7, Kiryat Arie, Petach Tiqva, 4951025, Israel
P.O. Box 3391 | +972 3 5589505/606 | twine-s.com
Contents
1About This Guide ................................................................................................ 4
2Terms and Abbreviations ................................................................................ 5
3Physical Description ......................................................................................... 6
3.1 Overview ........................................................................................................................................ 6
3.2 Size and Weight.........................................................................................................................7
4Shipping and Delivery....................................................................................... 8
4.1 Shipping Pallet........................................................................................................................... 8
4.2 Pallet Lifting Equipment ...................................................................................................... 8
4.3 Unpacking Area........................................................................................................................ 8
4.4 Transporting the System in a Building.................................................................... 8
5Installation Area ................................................................................................ 9
5.1 General ........................................................................................................................................... 9
5.2 Floor Plan......................................................................................................................................10
6Electrical Requirements ...................................................................................11
6.1 Power................................................................................................................................................ 11
6.2 Grounding..................................................................................................................................... 11
6.3 Circuit Breaker........................................................................................................................... 11
6.4 Residual Current or Earth Leakage Device ......................................................... 12
6.5 Power cable................................................................................................................................ 12
6.6 UPS - Recommendations.................................................................................................12
7Network...............................................................................................................13
7.1 Network Connections..........................................................................................................13
8Environmental Conditions..............................................................................14
8.1 Temperature, Humidity and Altitude.......................................................................14
8.2 Air Quality.....................................................................................................................................14
8.3 System Environmental Specifications....................................................................14
9Accessories and Utilities .................................................................................15
9.1 Start-Up Kit..................................................................................................................................15
9.2 Fire Safety Equipment.........................................................................................................15
9.3 Cleaning the System...........................................................................................................15
9.4 Inputs and Outputs...............................................................................................................15
9.5 Color Selection tools............................................................................................................15
10 Materials Handling & Storage........................................................................ 17
10.1 Ink Cartridges............................................................................................................................ 17
10.2 Handling Waste....................................................................................................................... 17
11 Customer Information.....................................................................................18
11.1 Customer Details....................................................................................................................18
11.2 Site Preparation Checklist ...............................................................................................19

About This Guide
Confidential
TS-1800 Site Preparation Guide
Page 4
Hatnufa 7, Kiryat Arie, Petach Tiqva, 4951025, Israel
P.O. Box 3391 | +972 3 5589505/606 | twine-s.com
1About This Guide
The information and requirements provided in this document ensure proper
installation and operation of the Twine TS-1800 Digital Thread & Yarn Dyeing
system. The customer is responsible for:
Preparing the site as described in this document.
Complying with all applicable local regulations.
Filling out and signing the Site Preparation Checklist.
Sending the Site Preparation Checklist to your Twine representative.
If you have any questions about the information in this document, contact
your Twine representative.
All site preparation requirements must be met before the installation date.

Terms and Abbreviations
Confidential
TS-1800 Site Preparation Guide
Page 5
Hatnufa 7, Kiryat Arie, Petach Tiqva, 4951025, Israel
P.O. Box 3391 | +972 3 5589505/606 | twine-s.com
2Terms and Abbreviations
The table below lists terms and abbreviations used throughout this
document.
Term/Abbreviation
Definition
A
Ampere
AC
Alternating Current
ASL
Above Sea Level
°C
degrees Celsius or Centigrade
°F
degrees Fahrenheit
ft
feet
kg
kilograms
lb
pounds
TS-1800
Digital Thread Dyeing system
VAC
Volts Alternating Current

Physical Description
Confidential
TS-1800 Site Preparation Guide
Page 6
Hatnufa 7, Kiryat Arie, Petach Tiqva, 4951025, Israel
P.O. Box 3391 | +972 3 5589505/606 | twine-s.com
3Physical Description
3.1 Overview
The TS-1800 comprises a single stand-alone unit, as shown in the figure
below.
Figure 1: TS-1800 Digital Thread & Yarn Dying System

Physical Description
Confidential
TS-1800 Site Preparation Guide
Page 7
Hatnufa 7, Kiryat Arie, Petach Tiqva, 4951025, Israel
P.O. Box 3391 | +972 3 5589505/606 | twine-s.com
3.2 Size and Weight
The TS-1800 has the following main dimensions and weight:
Length (L) 2.0 meters (79 inches)
Width (W) 0.75 meters (30 inches)
Height (H) 1.45 meters (57 inches)
Weight 480 kg (1058 lb)
Figure 2: TS-1800 Dimensions

Shipping and Delivery
Confidential
TS-1800 Site Preparation Guide
Page 8
Hatnufa 7, Kiryat Arie, Petach Tiqva, 4951025, Israel
P.O. Box 3391 | +972 3 5589505/606 | twine-s.com
4Shipping and Delivery
4.1 Shipping Pallet
The approximate size and weight of the TS-1800 system when mounted on a
pallet is as follows:
Length (L) 2.25 meters (89 inches)
Width (W) 0.89 meters (35 inches)
Height (H) 1.74 meters (69 inches)
Weight 600kg (1323lb)
4.2 Pallet Lifting Equipment
A forklift must be available for pallet lifting. It must be able to lift at least
600kg (1323 lb).
4.3 Unpacking Area
An unpacking area must be available. The area must enable sufficient
clearance to lift the machine pallet and to unload the machine from the
pallet.
4.4 Transporting the System in a Building
Before entering the building with the system, identify the route you want to
use to get the system to the installation site.
The site manager is responsible for ensuring that:
All floors enroute to the site installation area can handle the total weight
of the system together with the transportation mechanism.
The building infrastructure (such as the elevators) can handle the total
weight of the system together with the transportation mechanism.

Installation Area
Confidential
TS-1800 Site Preparation Guide
Page 9
Hatnufa 7, Kiryat Arie, Petach Tiqva, 4951025, Israel
P.O. Box 3391 | +972 3 5589505/606 | twine-s.com
5Installation Area
5.1 General
IMPORTANT!
If the TS-1800 is going to be located in an area that is not on ground floor
level, you must ensure that the area has sufficient capacity for the
weight and physical dimensions of the machine.
The installation area should be free of sources of vibration and
electromagnetic interference that might affect the proper functioning of
the TS-1800.
Locate the TS-1800 in an area with a level floor, with a gradient of no
more than 0.5% (5mm per meter).
The floor should be stable and must be capable of bearing the weight of
the TS-1800. The minimum floor load specification is 235Kg/m2
(48lb/ft2).
Clearance around and above the TS-1800 should ensure convenient
access and servicing.
The area around the TS-1800 must always remain dry.

Installation Area
Confidential
TS-1800 Site Preparation Guide
Page 10
Hatnufa 7, Kiryat Arie, Petach Tiqva, 4951025, Israel
P.O. Box 3391 | +972 3 5589505/606 | twine-s.com
5.2 Floor Plan
A sample floor plan is shown below, with the TS-1800 placed in a likely
operating area. The dimensions shown in the figure are minimum clearance
requirements.
Figure 3: Floor Plan Sample (not to scale)
Altri manuali per TS-1800
3
Indice


















