Voron 2.4 Conveyor 90 Belt Kit assembly manual P a g e 5 | 27
www.belt3dprinterkit.com
We remove heating bed at this point, by releasing 4 units M3 bolts that holds it down,
it is highly recommended to remove any magnetic base plate, and clean the aluminum
heatbed with IPA in order to remove any glue from it:
*Note: Do not disconnect the heatbed from the electronics, just keep it loose for next
steps.
Figure 4 Removing heatbed screws
Now we can securely remove both 2020 aluminum bars that holds the heatbed, by
removing the 4 screws on each side, you have to disconnect cable from the Z endstop
unit, since it won’t be used:
Figure 5 Removing heatbed support bars
Chapter 3 Preparing frame
We are pretty much ready to install our kit.
Step 3.1 Installing bottom plates
Let’s identify each bracket part first: