Installation, commissioning & check manual – FST-3 5
9.4.2 Checking installation mode (commissioning step 3) 73
9.4.3 Checking system speed (commissioning step 4) 73
9.4.4 Performing a reset and activating the safety system 75
9.4.5 Installation drive without sensor 76
9.4.6 Checking auxiliary mode control (commissioning step 5) 76
9.4.7 Checking SHK relay triggering (commissioning step 6) 77
9.4.8 Checking the traction (commissioning step 7) 77
9.4.9 Checking SBR relay triggering (commissioning step 8) 77
9.4.10 Checking the folding supports protected space version (commissioning step 9) 78
9.4.11 Checking the inspection control (commissioning step 10) 79
9.4.12 Installing the position system (commissioning step 11) 80
9.4.13 Installing the magnetic tape 80
9.4.14 Installing the magnetic tape with magnetic tape holder 81
9.5 Installing the sensor 87
9.5.1 Connecting the sensor and switching on the control system 89
9.5.2 Sensor LEDs 90
9.5.3 Checking the position system (commissioning step 12) 91
9.5.4 Installation check 91
9.5.5 Checking a loss of traction (commissioning step 13) 92
9.5.6 Teachingendswitchesandendoors(commissioningsteps14and15) 92
9.5.7 Checking inspection end switches (commissioning step 16) 95
9.5.8 Checking access monitoring (commissioning step 17) 96
9.5.9 Carrying out calibration drive 97
9.5.10 Checking positioning accuracy 99
9.5.11 Checking the trigger speed (commissioning step 18) 100
9.5.12 Checking deceleration monitoring (commissioning step 19) 102
9.5.13 Checking the pre-triggered stopping system protected space version (commissioning step 20) 104
9.5.14 Checking emergency end switches (commissioning step 21) 104
9.5.15 Checking the bypass switch (commissioning step 22) 105
9.5.16 Setting the door zone length (commissioning step 23) 106
9.6 Teachingandcheckingtheoors(commissioningstep24) 106
9.6.1 Levelling adjustment 107
9.6.2 Level adjustment via FPM-1 or FPM-2. 107
9.6.3 Checking unintended movements (UCM) (commissioning step 25) 109
9.7 Setting control options 110
9.7.1 Optimising re-levelling 110
9.7.2 Crawl drive 110
9.7.3 Door times 111
9.7.4 Password 112
9.8 Test actuation and checking monitoring functions in accordance with EN81 113
9.9 Emergencycalllter 119
9.10 Creating & loading a bacbcp 119
9.11 LONmoduleconguration 120
10 Technical data 127
10.1 FST-3 control module 127
10.1.1 General 127
10.1.2 Dimensions 128
10.1.3 FST-3 jumpers 131
10.1.4 Microfuses 131