TABLE OF CONTENTS
1
INTRODUCTION..................................................................................................................................1
2
GENERAL SYSTEM DESCRIPTION ..................................................................................................2
3
PARTS LISTS ......................................................................................................................................4
4
INSTALLATION PROCEDURE...........................................................................................................9
4.1
EXISTING SYSTEM CHECK ...............................................................................................................9
4.2
BOOM SPEED TEST........................................................................................................................9
4.3
WING SENSOR INSTALLATION.......................................................................................................11
4.4
MAIN LIFT SENSOR INSTALLATION..................................................................................................14
4.5
ROLL SENSOR INSTALLATION.......................................................................................................15
4.5.1
Intermediate Frame Roll Sensor Mounting.......................................................................16
4.5.2
Reference Frame Roll Sensor ............................................................................................17
4.5.3
Boom Frame Roll Sensor Mounting..................................................................................18
4.6
HYDRAULIC INSTALLATION ...........................................................................................................19
4.6.1
Valve Assembly...................................................................................................................19
4.6.2
Valve Mounting....................................................................................................................21
4.6.3
Hydraulic Plumbing.............................................................................................................22
4.6.4
120’ Boom Orifice Installation............................................................................................24
4.7
ELECTRICAL INSTALLATION..........................................................................................................25
4.8
COMPLETING THE INSTALLATION ..................................................................................................29
5
ELECTRICAL REFERENCE – CABLE DRAWINGS........................................................................30
5.1
ITEM C01: 44674 –CABLE UC3 SENSOR ROLL BIAS ...................................................................30
5.2
ITEM C02: 44668 –SENSOR BRANCH CABLE...............................................................................30
5.3
ITEM C02B: 44664 –CABLE UC4 CAN NODE .............................................................................31
5.4
ITEM C03: 44656 –CABLE VALVE VARIABLE RATE......................................................................31
5.5
ITEM C04: 44658-62 –CABLE VALVE CS4 INTERFACE.................................................................32
5.6
ITEM C05: 44658-46D –CABLE VALVE DT ROLL WITH PIGTAIL...................................................33
5.7
ITEM C10: 44650-39 –CABLE POWER GENERIC SELF-PROPELLED..............................................34
5.8
ITEM C11: 44651-03 –CABLE EXTENSION CABLE VALVE GENERIC..............................................35
5.9
ITEM C12: 44658-24 –CABLE INTERFACE UC4 C12 DT06-2X GND2..........................................36
5.10
ITEM C13: 44658-47 –CABLE INTERFACE UC4 BC C13 DT2 MAIN EXTENSION ...........................37
5.11
ITEM C14: 44658-28 –CABLE INTERFACE UC4 BC C14 POWER PIGTAIL.....................................38
6
APPENDIX A – VALVE CONNECTOR CHANGE.............................................................................39