B. Equipment storage and installation requirements.
The equipment should be stored or installed in a shady, normal temperature, ventilated and
dry place.
C. The equipment should be unload and transfer by forklift.
D. SPECIFICATIONS OF CONCRETE (See Fig. 4)
Specifications of concrete must be adhered to the specification as following.
Failure to do so may result in lift and/or vehicle falling.
1. Concrete must be thickness 120mm minimum and without reinforcing steel bars, and
must be dried completely before the installation.
2. Concrete must be in good condition and must be of test strength 210kg/cm2
minimum.
3. Floors must be level and no cracks.
D. AIR SUPPLY
Air pressure requirement: 0.5Mpa~0.8Mpa, Air line size Φ8 *Φ6.
E. POWER SUPPLY
The electrical source must be 4HP minimum. The source cable size must be 2.5mm² and in
good condition of contacting with floor. Single phase power unit connect fire, zero and
ground lines (Total 3 wires); 3 phase power unit connect fire, zero and ground lines (Total
5 wires).
Concrete intensity must be 210kg/cm2minimum