Schleibinger CDF Manuale utente

Schleibinger Geräte
User Manual
CDF-Freeze-Thaw-Testing
Machine
Schleibinger Geräte Teubert u. Greim GmbH
Gewerbestraße 4, 84428 Buchbach
Telefon ( 8 86) 9 4 1 , Telefax ( 8 869) 9 4 14
Mobil ( 1 71) 7 32 16 7 , ( 172) 8 999 196

www. schleibinger.com , [email protected]
Contents
1 INTRODUCTION...............................................3
2 INSTALLATION AND SECURITY HINTS........4
2.1 SETUP OF THE MACHINE........................................4
2.2 INTERNET CONNECTION..........................................5
2.2.1 Chiptool...................................................6
2.2.2 CompactFlash Card................................7
2.3 PROTECTION SWITCHES AND PERSONAL SAFETY.........7
2.4 REPAIR AND MAINTENANCE.....................................8
3 PRINCIPLES OF OPERATION........................9
3.1 GENERAL............................................................9
3.2 SYSTEM OPERATION..............................................9
3.3 MECHANICAL CONSTRUCTION.................................10
3.3.1 Testing tub.............................................11
3.3.2 Circulation Unit......................................11
3.3.3 Freeze Resistance................................13
3.4 CUBE TEST.......................................................14
3.5 EY SWITCH.....................................................16
3.6 TRANSPORT OF THE CDF MACHINE.......................16
3.7 EMPTY THE COOLANT LIQUID................................16
3.8 COOLING WATER CONNECTION (OPTION).................17
4 HANDLING THE CONTROLLER...................18
4.1 INTRODUCTION....................................................18
4.2 EYBOARD AND DISPLAY......................................18
4.3 HANDLING.........................................................18
4.3.1 tart.......................................................18
4.3.2 tatus....................................................19
4.3.3 Cycle Time............................................21
4.4 SETUP..............................................................21
4.4.1 Target Value..........................................22
4.4.2 Profile Input...........................................22
4.4.3 Display..................................................24
4.4.4 Clock.....................................................25
4.5 SYSTEM MENU...................................................26
4.5.1 Manual..................................................26
4.5.2 DA Calibration.......................................27
4.5.3 Controller...............................................28
4.5.4 Probes...................................................31
4.5.5 RAM Reset............................................32
4.5.6 Misc.......................................................32
5 TECHNICAL DATA .......................................33
6 SERVICE HINTS.............................................34
6.1 MAINTENANCE CONTROLLER..................................34
6.2 VALUES FOR THE SECURITY DEVICES......................34
6.3 HELP YOURSELF................................................35
7 SCHEMATIC DRAWINGS .............................38
7.1 REFRIGERANT SCHEMATIC.....................................38
7.2 FUSES..............................................................39
8 INDE .............................................................40
CDF-Freeze Thaw- Testing Machine page 2

1 Introduction
Congratulations: You buy a sophisticated measurement system or testing the
reeze thaw resistance o concrete. This machine equipped, with the latest
generation o micro-controller and Internet technology will satis y you now and
also in the uture. This machine is engineered according to the latest standards o
security and environmental protection.
For maintenance all parts are easy accessible. The critical components are
redundant. To minimize condense water and energy loss all valves are care ully
isolated. All mechanical parts are manu actured on CNC machines, to guaranty
that all parts it in an optimal way. The tin parts are stainless or powder coated
according to medicine standards.
CDF-Freeze Thaw- Testing Machine page 3

2 Installation and Security Hints
2.1 Setup of the Machine
The ground loor should withstand a pressure o 300 kg/m². Air cooled machines
should be installed in rooms not smaller then 200 m³.. This rooms should have a
good air exchange, to keep the room temperature below 28°C. Also or water
cooled machines , according to DIN EN 378-1 the room volume should be at
least 8 m³ , i with leak cooling gas comes into the atmosphere.
I the distance between the backside o the machine and the wall is below 50cm,
you should change the per orated cover to the ront side to ensure a ree
circulation or the air ( or air cooled machines)
Be sure that the machine stands horizontal. Please check this by a level at the
cooling bath. I necessary the machine may be setup by the our adjustable eet.
The horizontal deviation should be not higher then 1-2 mm/m.
This machine is constructed according to DIN EN 378-1class A. This means it is
allowed to run this machine in a room where people are sleeping, disabled
persons are working, or a lot o not instructed people are present. So there are no
special requirements in the training o the people working with, or nearby the
machine.
As cooling liquid a mix o 45 % tap water and 55 % glycol coolant is used. This
according to the European water protection standard level 0 . There are no special
requirements or environmental or water protection.
The re rigerant is
R507 (or R404A). This
re rigerants are ree o
FCKW. They are not
reducing the ozone
shield in the
atmosphere.
Compared with CO2
(GWP = 1,0) R507
has a high potential
or global warming
(GWP = 3800). This
act requires a care ul
handling with the
re rigerant. Service
and repair jobs at the
CDF-Freeze Thaw- Testing Machine page 4
0,4m 0,4 m
0,5 m
abe llänge3 m
Schleibinger Geräte
0,8m
2,25m
Opti onalüh lwasser
Vor- /Rücklauf
Luftein lass
nicht v erstell en

at the cooling machine are allowed only or well trained and special educated
persons. Pleas contact our service center or urther questions.
The lubricant o the cooling machine has not be changed during the li etime o the
machine. The oil is classi ied at water dangerous class =1. There are no special
oil protection requirements necessary, because the machine automatically stopp i
there is a leakage in system.
The CDF/CIF-machine has a mains connection with a 3x32A/400V/50Hz CEE
connector. As circuit protection 3x32A are necessary.
The environmental conditions should be at 10 to 28 °C at maximum 65 % relative
humidity. I the humidity is higher there may be more condense water at some
machine parts. Below 10°C s special winter-controller should be ordered with the
machine. For temperatures over 28°C an additional water cooling is necessary.
Opening the lid o the cooling bath is only allowed when the bath temperature is
near the room temperature. We strongly recommend water-proo isolation
protection gloves. Contact to the cooling bath may cause reezing the skin,
ingers, or the hand.
2.2 Internet Connection
The CDF testing machine rom Schleibinger is equipped (option) with an internet
inter ace. So you may easy integrate the machine in your laboratory network or in
the world-wide-net. You can contact the CDF machine as easy as any other web-
site. Also you may use the telnet or FTP service.
The WEB server integrated in the CDF machine displays the the temperature data
as well as the actual temperature and some status in ormation.
To contact the CDF machine input the IP address o the CDF machine in your
web-browser so tware. For example :
http://192.168.1.40
The CDF machine need a ix IP address.
CDF-Freeze Thaw- Testing Machine page 5

2.2.1 Chiptool
To change this, start the so tware chiptool.exe delivered with the CDF machine on
your PC. This PC must be connected to the same network then the CDF machine.
Choose the menu point
Chip -Find in the chiptool
so tware. I everything is
well connected the CDF
machine will be
displayed. Then select
the machine and change
the IP address and the
network address
according to you local
network requirements.
Be sure that your PC and
the CDF machine are in
the same IP namespace, otherwise you may have to con igure also the Netmask.
You may also access the CDF machine with the chiptool File Trans er Protocol
"FTP Client" in the menu "Tools":
User is tp, password is tp.
Change the Drive to B: in the right column. All measurement data are in the
subdirectory :
B:\httpd\htdocs\daten
CDF-Freeze Thaw- Testing Machine page 6

All program iles in:
B:\httpd\cgi-bin.
For advanced users: As super user you may also have an access to the machine
via Telnet:
User is tel, password is tel.
In the telnet window a command line terminal will be opened. Here you may use
most o the usual DAS commands. Press help Enter i you are in doubt. Give the
command closetelnet to close the connection.
2.2.2 CompactFlash Card
You may also read the data iles
rom the built in CF card.
Switch o the machine. Open the
electrical cabinet. On the le t side
you will see the electronic.
Remove the card.
All measurement data are in the
subdirectory :
B:\httpd\htdocs\daten
All program iles in:
B:\httpd\cgi-bin
2.3 Protection S itches and Personal Safety
The machine is equipped with the ollowing sa ety and security components. This
components are adjusted by Schleibinger, Its not allowed to change the settings.
(6.2 ):
•Over-temperature protection or the heating unit (70 °C)
•Level indicator or the bath and the liquid bu er.
•A sa ety switching device or limiting the high pressure or the compressor
•A sa ety switching device or limiting the low pressure or the compressor
CDF-Freeze Thaw- Testing Machine page 7
CF Card

Changing the setup of the security devices is not allowed.
Any manipulation will lead to a total warranty loss!
Pleas ollow care ully all standards and laws or personal protection. Also ollow
the DIN EN 378-1 and DIN EN 378-2 standards.
The owner o the machine has to supply personal protection equipment, specially
security gloves and security eye glasses or all people working with the machine.
2.4 Repair and Maintenance
The ollowing jobs may be done by the user:
Maintenance quarterly yearly
Check the rost resistance o the
cooling liquid, at least at -38 - -45 °C
or density @ 20°C 1.072 – 1.075
g/cm3. Using a re ractometer is
recommended
X
Checking the coolant level in the bath.
Stop the machine and level checking
with specimen containers mounted.
X
Cleaning all components outside.
Cleaning the tin plates o the heat
exchanger. Removing concrete loss
or sand out o the bath.
X
Following jobs are recommended but not necessary:
Maintenance yearly
Checking the bath temperature probe X
Calibration o the bath probe at
-20°, 0°, 20°C
X
Checking the compressor heater X
Checking the magnetic valves X
Changing the backup battery o the controller X
i necessary, latest
a er 4 years
Repair jobs should be done only by quali ied persons
Please call Schleibinger or special questions.
CDF-Freeze Thaw- Testing Machine page 8

3 Principles of Operation
3.1 General
The CDF reeze-thaw testing machine is developed ollowing the CDF standards
o RILEM-(Materials and Structures (1996) Vol 29 (193), pp 523-528), the RILEM
CIF standard and prEN 12390-9. The main advantage o thees standards is the
very good reproducibility o the measurement results. The specimen containers
are hanging in an coolant liquid. So you get a constant temperature distribution, a
ast temperature balance and temperature gradient right to tested specimen
sur ace. Due to the low thermal resistance the temperature deviations are very
small.
BetonLuftPrüfflüssigkeitühlflüssigkeit
Kühl lüssigkeit = coolant liquid; Prü lüssigkeit = test luid, water or water with
salt; Lu t = air; Beton = concrete
Also the cube test according to prEN 12390-9 may be run (option) by the CDF
machine. In opposite to air cooled test chambers, the cube test cycle may be
shortened rom 24h to 12h. This cuts testing time and costs dramatically..
3.2 System Operation
The CDF machine is a bath o circulation coolant liquid. In the bath stainless steel
containers are mounted. The concrete specimen is placed on three small spacers
in the middle o this containers. Each container is illed with some amount o water
or water/ salt solution. The coolant liquid, and so the specimen, are rozen and
thawed in a well de ined temperature cycle.
The re erence temperature is measured at the bottom o the container. Be shure
that minimum one container is in contact with the probe.
CDF-Freeze Thaw- Testing Machine page 9

Z e mpera turz y klus
-2 0
-1 5
-1 0
-5
0
5
1 0
1 5
2 0
0 1 2 3 4 5 6 7 8 9 1 0 1 1 1 2
T
e
m
p
e
r
a
t
u
r
h
The coolant liquid is circulated by pump 1. In the circulation a electrical heater is
mounted. For cooling a dosage o cooler liquid, cooled in a special bu er
container, is added by two magnetic valves. The coolant in the bu er is pumped
in a 2nd circulation through the evaporator, which is cooled to -38°C by the
compressor, back to the bu er. The bu er-temperature is always below the
temperature in the main circulation. The compressor is cooled by air, water or
water + air.
Ä L T E
B a d
S p e i c h e r
P u m p e 2
P u m p e 1
H e i z u n g
V e r d a m p f e r
M a g n e t v e n t i l e
Kälte = cool re rigerant; Verdamp er = evaporator; Pumpe = pump;
Magnetventile = magnetic valves; Bad = bath; Speicher = bu er, Heizung =
heater
3.3 Mechanical construction
The CDF machine is a ready to run test chamber. It is based on three main
components:
•Test-bath
•Re rigerating installation
CDF-Freeze Thaw- Testing Machine page 10
Altri manuali per CDF
2
Indice
Altri manuali Schleibinger Apparecchiature di prova
Manuali Apparecchiature di prova popolari di altre marche

SMART
SMART KANAAD SBT XTREME 3G Series Manuale utente

Agilent Technologies
Agilent Technologies BERT Serial Manuale utente

Agilent Technologies
Agilent Technologies N3280A Manuale utente

Vernier
Vernier Go Direct Voltage Manuale utente

Lifeloc
Lifeloc R.A.D.A.R. Manuale utente

Fluke
Fluke T5-600 Istruzioni per l'uso e l'installazione













