SCIEX CESI 8000 Plus Manuale utente

CESI 8000 Plus High Performance
Separation-ESI Module
Preinstallation Manual
August 2016RUO-IDV-05-3345-B | B11953AE

This document is provided to customers who have purchased SCIEX equipment to use in the operation of such SCIEX
equipment. This document is copyright protected and any reproduction of this document or any part of this document is
strictly prohibited, except as SCIEX may authorize in writing.
Software that may be described in this document is furnished under a license agreement. It is against the law to copy, modify,
or distribute the software on any medium, except as specifically allowed in the license agreement. Furthermore, the license
agreement may prohibit the software from being disassembled, reverse engineered, or decompiled for any purpose. Warranties
are as stated therein.
Portions of this document may make reference to other manufacturers and/or their products, which may contain parts whose
names are registered as trademarks and/or function as trademarks of their respective owners. Any such use is intended only
to designate those manufacturers' products as supplied by SCIEX for incorporation into its equipment and does not imply
any right and/or license to use or permit others to use such manufacturers' and/or their product names as trademarks.
SCIEX warranties are limited to those express warranties provided at the time of sale or license of its products and are SCIEX’s
sole and exclusive representations, warranties, and obligations. SCIEX makes no other warranty of any kind whatsoever,
expressed or implied, including without limitation, warranties of merchantability or fitness for a particular purpose, whether
arising from a statute or otherwise in law or from a course of dealing or usage of trade, all of which are expressly disclaimed,
and assumes no responsibility or contingent liability, including indirect or consequential damages, for any use by the purchaser
or for any adverse circumstances arising therefrom.
For research use only. Not for use in diagnostic procedures.
AB Sciex is doing business as SCIEX.
The trademarks mentioned herein are the property of AB Sciex Pte. Ltd. or their respective owners.
AB SCIEX™is being used under license.
©2016 AB Sciex
AB Sciex LLC
500 Old Connecticut Path
Framingham, Massachusetts 01701
USA
Preinstallation ManualCESI 8000 Plus High Performance
Separation-ESI Module
RUO-IDV-05-3345-B | B11953AE2 of 24

Chapter 1 Introduction...............................................................................................................................5
Customer Site Planner Responsibilities..............................................................................................................................5
FSE Responsibilities............................................................................................................................................................6
During Installation.......................................................................................................................................................6
Operator Familiarization..............................................................................................................................................6
Technical Support..............................................................................................................................................................6
Chapter 2 Site Planning Checklist..............................................................................................................7
Customer Information........................................................................................................................................................7
Requirements.....................................................................................................................................................................7
Site Layout...................................................................................................................................................................7
Electrical Requirements................................................................................................................................................8
Ventilation and Waste Collection Requirements..........................................................................................................8
Environmental Requirements.......................................................................................................................................8
BioSafety Requirements...............................................................................................................................................9
Customer Preparation..................................................................................................................................................9
Mass Spectrometer Requirements................................................................................................................................9
Solutions and Equipment Requirements......................................................................................................................9
Mass Spectrometer Information.......................................................................................................................................10
Customer Profile..............................................................................................................................................................10
Comments and Exceptions...............................................................................................................................................11
Signoff.............................................................................................................................................................................11
Appendix A Site Requirements................................................................................................................12
Site Layout Requirements................................................................................................................................................12
Laboratory Layout and Clearances.............................................................................................................................12
Height Requirements.................................................................................................................................................13
Weights and Dimensions...........................................................................................................................................13
Electrical Requirements....................................................................................................................................................14
Mains Supply Connections.........................................................................................................................................14
Mains Supply Fluctuations.........................................................................................................................................14
Protective Earth Conductor........................................................................................................................................14
Surge Suppression......................................................................................................................................................14
System Electrical Specifications..................................................................................................................................14
Ventilation and Waste Collection Requirements..............................................................................................................15
Ventilation Requirements...........................................................................................................................................15
Waste Collection Requirements.................................................................................................................................15
Environmental Requirements...........................................................................................................................................15
BioSafety Requirements.............................................................................................................................................16
Customer Preparation Requirements...............................................................................................................................16
Mass Spectrometer Requirements....................................................................................................................................16
CESI 8000 Plus High Performance
Separation-ESI Module
Preinstallation Manual
3 of 24RUO-IDV-05-3345-B | B11953AE
Contents

SCIEX Mass Spectrometers........................................................................................................................................16
Thermo Scientific Mass Spectrometers.......................................................................................................................17
Bruker Mass Spectrometers.......................................................................................................................................17
Waters Mass Spectrometers.......................................................................................................................................17
Customer-Supplied Solutions and Equipment..................................................................................................................17
Appendix B Equipment Safety Categories..............................................................................................19
Appendix C System Specifications...........................................................................................................20
Instrument Specifications.................................................................................................................................................20
Cart Specifications...........................................................................................................................................................20
Controller Specifications..................................................................................................................................................21
Detector Specifications....................................................................................................................................................21
(Optional) UV Detector Specifications........................................................................................................................21
(Optional) Laser Induced Fluorescence (LIF) Detector Specifications..........................................................................22
(Optional) Photo Diode Array (PDA) Detector Specifications......................................................................................22
Revision History........................................................................................................................................24
Preinstallation ManualCESI 8000 Plus High Performance
Separation-ESI Module
RUO-IDV-05-3345-B | B11953AE4 of 24
Contents

This guide is for the site planner, the individual responsible for preparing the facility for the installation of the CESI
8000 Plus system.
Note: Refer to the Safety Manual for instructions for safe use of the system.
Note: If the site preparation tasks are not complete when the SCIEX Field Service Employee (FSE) arrives, then
the scheduled installation will be postponed.
Customer Site Planner Responsibilities
Complete the Site Planning Checklist on page 7 in consultation with facilities services personnel (electrical,
ventilation, and information technology [IT]), and return it to the FSE before the completion date. Refer to Signoff
on page 11.
Note: The FSE will follow up if the checklist is not received prior to the scheduled installation date.
•Verify that adequate space and the required shipping facilities are available. Refer to Site Layout Requirements
on page 12.
•Provide all required electrical receptacles. Refer to Electrical Requirements on page 14.
•Provide and install all required vents and ventilation devices. Refer to Ventilation and Waste Collection
RequirementsVentilation Requirements on page 15.
•Verify that the requirements for the operating environment are met. Refer to Environmental Requirements on
page 15.
•Verify the mass spectrometer to be used with the system is operational by executing a performance test. Refer
to Mass Spectrometer Requirements on page 16.
•Verify that any required additional equipment for the ion source or mass spectrometer is present. Refer to Mass
Spectrometer Requirements on page 16.
•Verify that all required solvents and laboratory supplies are available. Refer to Customer-Supplied Solutions
and Equipment on page 17.
•When the shipment arrives, inspect the packaging for damage and then contact SCIEX Customer Service or
the local FSE to schedule the installation.
CESI 8000 Plus High Performance
Separation-ESI Module
Preinstallation Manual
5 of 24RUO-IDV-05-3345-B | B11953AE
1
Introduction

FSE Responsibilities
•Review the checklist and discuss outstanding issues with the site planner.
•Unpack and set up the CE equipment sold and supported by SCIEX.
•Test and qualify the system to the specifications in the Operational Qualification 1.
During Installation
WARNING! Lifting Hazard. Make sure that at least four people are available to lift
the CE system. Follow established safe lifting procedures.
The FSE unpacks the system (with the assistance of customer staff), sets up the system, and then confirms its
operation. When the system is installed, the FSE conducts an operational qualification.
Operator Familiarization
During installation, the FSE provides a system and software overview, reviews data, and provides some basic
operator familiarization.
Note: Online training is available at sciex.com/education .
Technical Support
SCIEX and its representatives maintain a staff of fully-trained service and technical specialists located throughout
the world. They can answer questions about the system or any technical issues that might arise. For more
information, visit the SCIEX Web site at sciex.com.
Preinstallation ManualCESI 8000 Plus High Performance
Separation-ESI Module
RUO-IDV-05-3345-B | B11953AE6 of 24
Introduction

Customer Information
Organization
Address
City
Country
Zip/Postal code
Telephone
FaxSite planner contact
name
E-mail address
Requirements
Site Layout
Refer to Site Layout Requirements on page 12.
CompleteRequirements
There is adequate lab space to accommodate the equipment.
If the mass spectrometer inlet is lower or higher than the range of the CESI 8000 Plus cart, a
table or stand of the appropriate height for the CESI 8000 Plus system is available.
Additional personnel are available to help the FSE move the equipment. Four people are
recommended.
CESI 8000 Plus High Performance
Separation-ESI Module
Preinstallation Manual
7 of 24RUO-IDV-05-3345-B | B11953AE
2
Site Planning Checklist

Electrical Requirements
Refer to Electrical Requirements on page 14.
N/ACompleteRequirement
Installation of electrical supplies and fixtures complies with local regulations and
safety standards.
One branch circuit is provided for the CE components. One AC mains supply outlet
is required.
The mains supply voltage does not fluctuate more than ±10% from the nominal
voltage.
The mains supply includes a correctly installed protective earth conductor.
A qualified electrician has determined the appropriate AC mains supply
configuration based on the system electrical specifications found in System
Electrical Specifications on page 14.
Ventilation and Waste Collection Requirements
Refer to Ventilation and Waste Collection Requirements on page 15.
CompleteRequirement
Ventilation of the laboratory environment in which the system will be used complies with
local regulations and the air exchange rate is appropriate for the work performed.
Environmental Requirements
Refer to Environmental Requirements on page 15.
CompleteRequirement
The altitude does not exceed 2000 m (6562 ft) above sea level.
Temperature and humidity requirements have been met.
Preinstallation ManualCESI 8000 Plus High Performance
Separation-ESI Module
RUO-IDV-05-3345-B | B11953AE8 of 24
Site Planning Checklist

BioSafety Requirements
Refer to BioSafety Requirements on page 16.
CompleteRequirement
The site is not designated as BioSafety Level 3 (BSL-3) or BioSafety Level 4 (BSL-4).
Customer Preparation
Refer to Customer Preparation Requirements on page 16.
CompleteRequirement
Up to two customers have been identified for familiarization.
A mass spectrometer will be available during the installation.
Mass Spectrometer Requirements
Refer to Mass Spectrometer Requirements on page 16.
CompleteRequirement
A performance test has been performed on the mass spectrometer and a printout of the results
is attached.
Any required equipment for the ion source or mass spectrometer is available at the site.
Solutions and Equipment Requirements
Refer to Customer-Supplied Solutions and Equipment on page 17.
N/ACompleteRequirement
All of the required solutions and bottles are available.
CESI 8000 Plus High Performance
Separation-ESI Module
Preinstallation Manual
9 of 24RUO-IDV-05-3345-B | B11953AE
Site Planning Checklist

Mass Spectrometer Information
Mass spectrometer
manufacturer
Mass spectrometer model
Mass spectrometer serial
number
Software version
Firmware version
Ion source model
Customer Profile
(Optional) To allow the FSE to provide site-specific training, enter the following information.
Number of operators
Years of experience with mass spectrometry
Years of experience with capillary electrophoresis
CESI applications to be performed
Will the CESI 8000 Plus system be used stand-alone?
If the system will be used stand-alone, which detectors will be used?
UV
LIFPDA
Preinstallation ManualCESI 8000 Plus High Performance
Separation-ESI Module
RUO-IDV-05-3345-B | B11953AE10 of 24
Site Planning Checklist
Altri manuali per CESI 8000 Plus
2
Indice
Manuali Unità di controllo popolari di altre marche

Festo
Festo Compact Performance CP-FB6-E Manuale elenco delle parti

Elo TouchSystems
Elo TouchSystems DMS-SA19P-EXTME Manuale utente

JS Automation
JS Automation MPC3034A Manuale utente

JAUDT
JAUDT SW GII 6406 Series Guida rapida

Spektrum
Spektrum Air Module System Manuale utente

BOC Edwards
BOC Edwards Q Series Manuale utente











