STC Clear View Manuale utente

Y
e
a
r
s
W
a
r
r
a
n
t
y
P
C
S
H
E
L
L
7
10
Y
e
a
r
s
W
a
r
r
a
n
t
y
S
T
R
U
C
T
U
R
E
Clear ViewTM
Systems Trading Corporation
450 7th Avenue Suite 2809, New York, NY 10123
8’ x 12’ Greenhouse
Assembly Instructions


Introduction
Before Starting Assembly:
5. Make sure you have the proper tools:
After choosing a location, proper preparation of the site is essential. The site must be level. If the site is
not level, create a base slightly larger than the outside dimensions of the greenhouse using a perimeter
diagonals from both sides and making sure they are equal. The greenhouse is secured from the inside
with pegs into holes cast with concrete. See step15 for details.
level. Make sure you have checked with your local authorities regarding any required building permits.
water drainage and easy access to power and water necessary for greenhouse gardening.
Choose a sunny, level position away from overhanging trees and power lines and protected from the
wind as much as possible. The location should be away from structures that could cause snow to drift
on or around the greenhouse.
Locate underground pipes or cables before preparing the site or anchoring the greenhouse.
The List of Parts has the corresponding step number referenced to each part. We recommend that
while you go through the list, make staging areas for each step and place the parts necessary for
2. Lay the parts out in separate staging areas:
3. Select a Location:
4. Prepare a Foundation:
1. Make sure you have all the necessary parts:
Compare the contents of the three cartons to the List of Parts. If any parts are missing or damaged or
you have any questions, please contact Customer Service by phone at (877) 407-9100 ext. 1 or by email
CAREFULLY READ ALL INSTRUCTIONS BEFORE YOU BEGIN AND FOLLOW THE STEPS IN
THE ORDER THEY ARE PRESENTED.
NOTE: A cordless drill with Phillips head bit is highly recommended but not essential.
Tape Measure
Work Gloves
Safety Goggles
Phillips Screwdriver
Spirit Level
Small Step Ladder
Wooden Mallet
Liquid Soap or WD40 Lubricant
Scissors
Hex Key (included)
•
•
•
•
•
•
•
•
•
•
1 of 56
www.stcny.com
Our patented greenhouse has been designed to be easily assembled. All but one step can be completed
by one person. You will need assistance from another person to attach the roof. Although the greenhouse
can be assembled in six to eight hours, we recommend you take your time and make it a weekend project.
These instructions include helpful hints and important information needed to safely assemble and properly
maintain the greenhouse. Please read these instructions completely before you begin.
Thank you for purchasing your Clear ViewTM 8x12 Greenhouse. This model features two roof vents and a
circular air vent to ensure proper ventilation. We have also included an automatic vent opener to help
greenhouse will provide years of enjoyment.

General Order of Assembly
Step 1: Assemble Back
Step 2: Prepare Doors
Step 3: Assemble Front
Step 4: Assemble Sides
Step 5: Prepare Shelves
Step 6: Connect Sides to Back
Step 7: Connect Sides to Front
Step 8: Prepare Roof Vents
Step 9: Connect Gables and Roof Vents
Step 10: Brace Sides
Step 11: Install Circular Vent
Step 12: Install Side and Roof Panels
Step 13: Install Trim Plates
Step 14: Hang Doors
Step 15: Secure to Ground
Step 16: Install Trays and Bin Holder
1
3
4
9
5
8
13
12
11
14
16
6
7
2
2
10
2 of 56
www.stcny.com
Introduction .....................................
Safety Advice .................................
General Order of Assembly ......
List of Parts ......................................
Assemble Back .............................
Prepare Doors ..............................
Assemble Front .............................
Assemble Sides .............................
Prepare Shelves ............................
Connect Sides to Back ...............
Connect Sides to Front .............
Prepare Roof Vents ......................
Connect Gables and Roof Vents
Brace Sides ...................................
Install Circular Vent ..................
Install Side and Roof Panels ...
Install Trim Plates .......................
Hang Doors ..................................
Secure to Ground .........................
Install Trays and Bin Holder .......
Safety Advice
level surface.
Dispose of all plastic bags safely. Keep them out of the
reach of small children.
Keep children and pets away from the assembly area until
the work is completed.
Always wear shoes, gloves and safety goggles when working.
In manufacturing all sharp edges and burs have been removed
but caution should still be taken when handling metal parts.
Do not lean against or push the greenhouse during assembly.
Take special care not to touch overhead power lines with the
Do not attempt to assemble the greenhouse in windy or wet
conditions.
Do not position your greenhouse in an area exposed to
excessive wind.
If using power tools or a step ladder always follow the
manufacturer’s safety instructions.
Hot items such as recently used grills, blow torches etc.,
must not be stored in the greenhouse.
Store the polycarbonate panels in a cool dark place like a
garage until you are ready to use them.
Make sure the greenhouse complies with local building codes.
Table of Contents
1
2
2
3
6
15
19
27
33
34
36
39
40
46
48
49
50
52
55
56

List of Parts
!
The greenhouse is shipped in three cartons. These cartons are heavy. Be careful when lifting them.
Wear proper safety gear including work shoes, gloves and goggles.
Place all the parts for each step in staging areas, checking that you have all parts as you go.
If any parts are missing or damaged, contact STC customer service before beginning assembly:
G14C
G14D
4
4
Step 5
Step 5
G14J 4 Step 4
G06A
G06K 1
1 Step 3
2 Step 8
1 Step 2
DOOR 1G
DOOR 2G
VENT
1 Step 2
G06J 1 Step 3
G07C 2 Step 4
G07D 2 Step 4
Step 3
QTYFactory Assembled
QTY
1 Step 3G17A
1 Step 3G17B
1 Step 1G17C
1 Step 1G17D
G05D
G05D
1
1
4 Step 1
Step 9
Step 9G05G
G05H
QTY
G01D
G02A
G02H
G02I
G02J
G02K
G02L
1
1
1
1
2
1
1
1
1
1
4 Step 4
Step 1
Step 3
Steps 1,3
G02B 2 Steps 1,3
Step 1
Step 1
Step 9
G02N 1 Step 9
Step 1
Step 3
G03B
G03D
G03K
G03M
G03L
G03N
1
4
1
Step 4
G03C 1
1
1
4
1
1
1
Step 1
Step 1
Step 1
Step 1
G03W 1 Step 3
G03T 2 Step 4
G03V 4 Step 4
Step 9
Step 9
Step 9
Step 9
Step 9
G04C
G04D
4
4
G04G 2 Step 16
G04B 4 Step 4
Step 4
Step 4
G03R
G03Q
G03S
2 Step 9
G03U
Step 3
Step 3
G01I
G01J
G01M
G01N
1 Step 3G01O
3 of 56
www.stcny.com

Clear Panel QTY
1 Step 3
1 Step 1
GY1
GY8
1 Step 1GY9
2 Step 1GY2
1 Step 3GY5
1 Step 3GY6
1 Step 1GY7
Twin Panel QTY
4 Step 12Y21
6 Step 12Y22
2 Step 12Y23
Clear Panel QTY
4 Step 12
1 Step 3
GY21
GY18
2 Step 1
GY19
8 Step 12
GY12
1 Step 1
GY13
2 Step 1
GY20
1 Step 1
GY16
1 Step 3
GY17
4 of 56
www.stcny.com
Door Handle QTY
S29
S30
S31
S33
S44
2
1 Step 2
Step 2
Step 2
Step 2
Step 2
1
1
1
1
S25 Step 8
Roof Vent Handle QTY
2
4
S40
S40A
Step 2
Step 2
Door Lock QTY
9petS14S 1
2
S41A Step 9
Auto Vent Opener QTY
S06
S07
S16
hex key
G15D
S23
4
1
2
24 Steps 1,3,10
Steps 1,3,10
Steps 1,3
8
9 Step 9
Step 910
Step 2
Bracing Parts QTY
circular vent
vent frame
plastic nut 4
4
1 Step 11
1 Step 11
Step 11
Step 11
Circular Vent QTY
#S43 screw
Step 14
Step 14
Step 14
Step 14
Door Hinge Parts QTY
#S51
#S50
4#P30
2
2
2
#S49

G09C 2 Step 13
G09D 2 Step 13
J02L 2 Step 13
J02R 2 Step 13
J03 2 Step 13
J06 1 Step 13
Trim Plate QTY
30
J05 Step 16
Shelf Trays QTY
5 of 56
www.stcny.com
Connector QTY
20
12
4
Steps 2,3,4
Steps 1
Step 1,3
1
1
Step 3
Step 3
Step 3
1
Steps 1,3,4
S11
S17L
S17R
S08
S08C
S01
12
2
Steps 5,15S37
G16A
4 Step 9
8 Step 4
S22
S20
Connector QTY
219
12
12
Steps 1,9
Steps 1,9
Step 8,13
4 Step 16
Steps 1,3,4,9
S13
2
S14
S24
S36
S02
2 9petSS42
4
3petSS52
Step 138S48
Connector QTY
2 Steps 1,3
P05
2 Steps 1,3
P09
2 Steps 1,3
P10
2 Steps 1,3
P04
4 Step 4
P03
4 Steps 3,4P01
2 Step 4P19
4 Step 4P39
1 Step 9P21
2 Step 3P28
1 Step 3P18
1 Step 1P12
10
10
S34
S35
Step 15
Step 15
Anchor Clip and Peg QTY
Step 13S43 1

1.1A
Assemble Back
1.2A
Secure with S02 screws.
1.1B
Secure with S02 screws.
1.2B
QTY
4
6
#S01
#S02
QTY
1
1
1
1#G03C
#G03D
Connector
QTY
#G02A
#G02B
Line up bottom hole on short side of
connectors S01 with hole on side of
S01
S02
Place all the parts for the back face on a level surface.
Make sure the pieces are in the correct positions before assembling.
Carefully follow the order of assembly to ensure an easy installation.
Wear proper safety gear including work shoes, gloves and goggles.
!The back is assembled with the outside face to the ground. ALL VIEWS ARE SHOWN FROM INSIDE.
6 of 56
www.stcny.com
NOTE: ALL VIEWS ARE FROM INSIDE.
!
26”
(660 mm)
G03C G03D
S01
S02
26”
(660mm)
G02B
G02A

1.1A
Assemble Back
1.2A
Secure with S02 screws.
1.1B
Secure with S02 screws.
1.2B
QTY
4
6
#S01
#S02
QTY
1
1
1
1#G03C
#G03D
Connector
QTY
#G02A
#G02B
Line up bottom hole on short side of
connectors S01 with hole on side of
S01
S02
Place all the parts for the back face on a level surface.
Make sure the pieces are in the correct positions before assembling.
Carefully follow the order of assembly to ensure an easy installation.
Wear proper safety gear including work shoes, gloves and goggles.
!The back is assembled with the outside face to the ground. ALL VIEWS ARE SHOWN FROM INSIDE.
6 of 56
www.stcny.com
NOTE: ALL VIEWS ARE FROM INSIDE.
!
26”
(660 mm)
G03C G03D
S01
S02
26”
(660mm)
G02B
G02A

1.3A
1.3B
Secure with four S02 screws.
channels lining up last hole of
S01 with holes in G17D.
7 of 56
www.stcny.com
NOTE: ALL VIEWS ARE FROM INSIDE.
QTY
QTY
1#G17D
1#G17C
Screw
4#S02
G02B
G03C G03D
G02A
G17D
G17C
G02A
G03D
G03C
G17D
G17C
G02B
Altri manuali per Clear View
3
Indice
Altri manuali STC Kit serra

























