
2533800 Watson McDaniel Company HB Valve Manual Rev 0
installed or internal components may
not be functioning properly. Parts
should be checked for wear or
damage. Consult the factory with
questions.
VALVE DISASSEMBLY /
MAINTENANCE
NOTE: A spare parts kit is strongly
recommended when disassembling the
valve.
1. Make sure fluid supply is safely shut
off.
2. Allow sufficient time for valve to cool if
required.
3. Remove the actuator assembly from
the valve. See the Removing Actuator
section for instructions.
4. Remove the body plug from the
bottom of the valve body
5. Loosen and remove the packing gland
nut located at the top of the body.
6. Push down on the valve stem to
remove from body.
7. Remove the packing and spring out of
the packing chamber. Reinserting the
valve stem back through the packing
may help to push packing out of
chamber.
8. From the bottom, use a 9/16” socket
to remove the lower seal bushing.
The packing washer and o-ring should
drop out with the bushing.
9. Inspect the guide bushings in the
packing gland nut and lower seal
bushing. Replace as required.
10.Replace the packing O-ring as
required. Be sure to lubricate prior to
install.
11.Clean all surfaces of the stuffing box,
seat, stem, and plug. If the stem or
plug is corroded, worn or marred, it
must be replaced.
LAPPING THE SEAT AND PLUG
1. Follow the disassembly instructions
above for the valve.
2. Loosely reinstall the gland nut and
lower seal packing into the body.
3. Apply a thin amount of lapping
compound around the plug at the
taper near the bottom.
4. Slide the stem through the packing
until the plug rests on the seat.
5. Apply a very light pressure to the plug
on the seat and rotate back and forth.
Rotation should not exceed 90
degrees.
6. Lift the plug away from the seat and
rotate 90 degrees.
7. Repeat steps 5 and 6 several times to
ensure a proper seat. Then remove
the stem & plug and clean the lapping
compound off of the parts.
VALVE ASSEMBLY
1. Install the packing washer, O-ring, and
lower seal bushing from the bottom
opening of the valve body. Be sure to
lubricate the O-ring prior to install.
Packing must be clean and free of
dirt or debris.
2. Install spring from the top of the valve
body.
3. Slide the stem up through the packing
area.
V rings must be carefully installed
over the stem threads and into the
stuffing bore to avoid snagging of
the lips on threads or on the bore. A
sharp edge on the lips is imperative
for sealing.