Ecolab Ecodos-L Manuale utente

Ecodos-L, Ecorinse-L, Ecoset-L Rev 3.12-07
Short Instruction Manual
Ecodos-L (1.237.21, 1.237.22)
Ecorinse-L (1.237.23, 1.237.24)
Ecoset-L (1.235.40)
(with PCB 2.237.82)

Ecodos-L, Ecorinse-L, Ecoset-L - 2 - Rev 3.12-07
Table of Contents
1General...................................................................................................................3
1.1 Scope of warranty................................................................................................................3
1.2 Applicable regulations..........................................................................................................3
1.3 Transport damage................................................................................................................3
1.4 Contact address / manufacturer...........................................................................................3
2Safety .....................................................................................................................4
2.1 Safety information................................................................................................................4
2.2 Emphasised point.................................................................................................................4
2.3 Special safety information for maintenance and repair work ...............................................4
3Assembly...............................................................................................................5
4Functional description, operation and settings .................................................6
4.1 Settings................................................................................................................................6
4.2 Adjustment of buzzer volume...............................................................................................6
5Mounting and installation.....................................................................................7
5.1 Pre-installation requirements ...............................................................................................7
5.2 Overview..............................................................................................................................7
5.3 Wall mounting ......................................................................................................................7
5.4 Installation of the product feed line and the metering hose..................................................7
5.5 Installation of conductivity sensor ........................................................................................7
5.6 Electrical connection............................................................................................................7
6Maintenance and repair instructions...................................................................8
6.1 Replacement of peristaltic tube............................................................................................8
6.2 Replacement of roller assy...................................................................................................9
6.3 Replacement of PCB..........................................................................................................10
6.4 Replacement of buzzer......................................................................................................10
7Trouble shooting.................................................................................................11
8Spare parts list....................................................................................................12
9Technical data.....................................................................................................13

Ecodos-L, Ecorinse-L, Ecoset-L - 3 - Rev 3.12-07
1 General
This manual contains all important information on the function, the operation, the setting,
the installation and maintenance and repair of the ECODOS-L / ECORINSE-L /ECOSET-L
dosing units.
The systems are speed/timed and conductivity controlled dosing units for liquid/solid deter-
gents and liquid rinse products. They are designed for the use in commercial dishwashers.
All safety information and emphasised points are always to be observed!
1.1 Scope of warranty
Operational safety, functionality and performance of this unit is only guaranteed by the
manufacturer under the following conditions:
- maintenance and repair must be performed by authorized personnel.
- the unit is only used in accordance with the contents of this Instruction Manual
- only original spare parts are used for service and repair
- only approved Ecolab products are used.
In addition, the general warranty and service conditions of the company
ECOLAB Engineering GmbH are applicable.
1.2 Applicable regulations
The unit was based on the following regulations:
89/336/EWG “Electromagnetic compatibility“(EMV Guideline)
1.3 Transport damage
If, when unpacked, the unit is found to have suffered damage in transit, it must not be in-
stalled.
1.4 Contact address / manufacturer
ECOLAB Engineering GMBH
Raiffeisenstraße 7
D-83313 Siegsdorf
Phone (+49) 86 62 / 61 0
Fax (+49) 86 62 / 61 166
E-mail: [email protected]

Ecodos-L, Ecorinse-L, Ecoset-L - 4 - Rev 3.12-07
2 Safety
2.1 Safety information
•Connection and repair work on the ECODOS-L / ECORINSE-L / ECOSET-L may only be
performed by authorised experts.
•Suitable protective clothing is to be worn during maintenance and repair work.
•Safety provisions covering the handling of chemicals are always to be observed.
2.2 Emphasised point
The emphasised points CAUTION, WARNING, IMPORTANT and NOTE have the following
meanings in this Operating Manual:
CAUTION Is used if non-precise observance or non-observance of operating instructions, work in-
structions, specified sequences and such like may lead to injuries or accidents.
WARNING Is used if non-precise observance or non-observance of operating instructions, work in-
structions, specified sequences and such like may lead to damage to the equipment.
*IMPORTANT Is used if particular attention in handling the equipment is required.
)NOTE Is used if attention is to be drawn to a special feature.
2.3 Special safety information for maintenance and repair work
CAUTION
Suitable protective clothing must be worn when carrying out service and repair work and
during handling the system. All relevant safety regulations, which apply when handling
chemicals, must always be observed.
The unit must be installed as far away as possible from any risks and physical hazards.
Before any repair work is carried out, the dishwasher must be disconnected from the
power supply.
Any material of this unit, which is subject to disposal (packing material, replacement
parts etc.) must always be disposed of i.a.w. all applicable local and international envi-
ronmental protection laws and -regulations.
Maintenance and repair must be performed by authorized personnel.
*IMPORTANT Only original spare parts may be used in repairs.

Ecodos-L, Ecorinse-L, Ecoset-L - 5 - Rev 3.12-07
3 Assembly
Ecorinse-L Ecodos-L
Fig. 4.1
Fig. 4.2
Ecoset-L
Fig. 4.3
1
3
2
1
3
2
5
6
4
4
5
1
2
2
3
4
3
4
6
No. Description
1 Housing w. cover
2 Pump head
3 Prime button / Quit button
4 LED operation / LED fault ind.
5 Alarm buzzer
6 Inductive probe connector

Ecodos-L, Ecorinse-L, Ecoset-L - 6 - Rev 3.12-07
4 Functional description, operation and settings
The control electronic is supplied with voltage via an external transformer (see accessory
list) as soon as the corresponding enabling signal from the dishwasher is applied. The
green LED at the front side of the unit lights up continuously in operation mode or is flash-
ing in standby mode.
The metering can be performed in “continuous controlled”, “timed controlled” or in “conduc-
tivity controlled” dosing mode. These modes can be set on the PCB
4.1 Settings
Detailed description see: “Operation manual Ecodos-PCB 2.237.82”
4.2 Adjustment of buzzer volume
The unit comprises a buzzer for the acoustical alarm indication. It’s volume can be changed
by manually turning the inner disk (see illustration below).
Fig. 5.1

Ecodos-L, Ecorinse-L, Ecoset-L - 7 - Rev 3.12-07
5 Mounting and installation
5.1 Pre-installation requirements
)NOTE Mounting and installation guidelines will be suggested as the preferred method.
However varying types of conditions and surrounding physical environments will dictate
the actual mounting and installation. The installation must be in accordance with all local
regulations.
In order to ensure correct operation of the unit, the following dimensions must not be
exceeded:
- Mounting height: max. 1.8 meters
- Distance between unit and product container: max. 3.0 meters
5.2 Overview
Not available for field test units.
5.3 Wall mounting
Perform the mounting as follows:
1. Mark two drilling holes by using the holes of the unit housing as a template and drill holes.
2. Mount the housing using appropriate wall anchors
(screws and dowels, p/o delivery content).
5.4 Installation of the product feed line and the metering hose
Perform the installation of the product feed- and metering line as follows:
1. Mark water level within the wash tank and drain tank.
2. Drill appropriate hole into wash tank wall.
3. Install an appropriate tank connector to the tank wall.
4. Install metering hose between unit and tank connector.
5. Install the product feed line between the unit and the pick up probe (if available).
5.5 Installation of conductivity sensor
)NOTE
When selecting the measuring and metering points in the tank, the flow conditions in the
wash liquor must be considered. The measuring point must always be behind the mete-
ring point with regard to the flow direction.
In order to ensure correct operation of the unit, the following installation instructions for
the measuring cell must be followed:
Distance from Distance
tank corners at least 50 mm
heating elements as far as possible
Perform the installation and connection of the conductivity sensor as follows:
1. Drill an appropriate hole into the tank wall.
2. Install sensor into tank.
3. W. Inductive probe:
- Connect sensor w. plug to unit
W. 2-wire probe:
- Install the connection cable to the sensor.
- Connect the cable to screw terminal “7 8” of PCB
5.6 Electrical connection
See: “Operation manual Ecodos-PCB 2.237.82”

Ecodos-L, Ecorinse-L, Ecoset-L - 8 - Rev 3.12-07
6 Maintenance and repair instructions
CAUTION Any service and repair work must be carried out by authorized personnel only.
Ensure, that the power supply from the dishwasher is interrupted.
WARNING Only the original spare parts must be used.
Before any repair work is carried out, the unit must be disconnected from it’s power
source. Following each repair work a functional test of the unit must be performed.
)NOTE
The following points are to be given particular attention during servicing
of the unit:
- Condition of all product leading parts
- Condition of all electrical wiring
Repair policy:
Any maintenance and repair is limited to parts of the pump head, peristaltic tube and the
PCB. For all other defective components, the unit must be either returned to the equipment
center or disposed in accordance with the environmental regulations.
6.1 Replacement of peristaltic tube
1. Loosen tube ties and remove product feed- and metering tube from fittings.
Fig. 6.1 Fig. 6.2
2. Open lever while
pressing strap (1)
on back wall and lift
lever.
3. Remove old peristaltic tube.
4. Clean tube housing and remove old silicone residues. Fig. 6.3
5. Insert new peristaltic tube and lubricate tube.
1
1

Ecodos-L, Ecorinse-L, Ecoset-L - 9 - Rev 3.12-07
Fig. 6.4
6. Push cover on back wall and click blue lever into strap.
Fig. 6.5 Fig. 6.6 Fig. 6.7
6.2 Replacement of roller assy
Perform the replacement of the roller assy as follows:
1. Remove cover (see Chapter 6.1).
2. Remove old peristaltic tube.
3. Clean tube housing and remove old silicone residues. Fig. 6.8
4. Press fixation strap (1) with screw driver and lift of
holder of roller assy (2).
5. Carefully remove roller assy from pump head housing. Fig. 6.9
6. Insert new roller assy, mount roller holder.
7. Reinstall pump head (see Chapter 6.1).
2
1

Ecodos-L, Ecorinse-L, Ecoset-L - 10 - Rev 3.12-07
6.3 Replacement of PCB
Perform the replacement of the PCB as follows:
1. Remove cover.
2. Remove all cables from PCB.
3. Remove the screws from PCB and install new PCB simultaneously in reverse order.
6.4 Replacement of buzzer
Perform the replacement of the buzzer as follows:
1. Remove screws from housing cover and carefully remove cover with seal.
2. Remove the two buzzer connectors from the screw terminal “ALARM AC24V” of the
PCB.
3. Unscrew and remove coupling nut from buzzer and remove buzzer.
4. Install new buzzer simultaneously in reverse order.
Questo manuale è adatto per i seguenti modelli
8
Indice
Altri manuali Ecolab Unità di controllo

Ecolab
Ecolab MULTILINE 1000-S Manuale utente

Ecolab
Ecolab MFV III Manuale utente

Ecolab
Ecolab DegasPLUS Manuale utente

Ecolab
Ecolab DryExxEco Advanced-ETH Manuale utente

Ecolab
Ecolab EMP Kompakt II Manuale utente

Ecolab
Ecolab MFV II Manuale utente

Ecolab
Ecolab EMP Kompakt II Manuale utente

Ecolab
Ecolab MULTILINE 1000 Manuale utente
Manuali Unità di controllo popolari di altre marche

Festo
Festo Compact Performance CP-FB6-E Manuale elenco delle parti

Elo TouchSystems
Elo TouchSystems DMS-SA19P-EXTME Manuale utente

JS Automation
JS Automation MPC3034A Manuale utente

JAUDT
JAUDT SW GII 6406 Series Guida rapida

Spektrum
Spektrum Air Module System Manuale utente

BOC Edwards
BOC Edwards Q Series Manuale utente











