- 3 -
Theright sideofthe screenisthe projectlist, where
the details for every valve can be seen. The cells
with green background can be edited and thus the
settings (of valves with adjustable settings) can be
changedtoreectthespeciedmaximumow.Af-
ter changing settings please press the reset button
(2 green arrows) to update the cells.
To save the project press the save button, which
will turn green when everything is saved and be
red when there has been changes to the project
since the last save.
Setting up wafers.
To make a wafer consisting of several stainless
steelcartridges, pleaseuse themulti-block window
by clicking the button with the circle and several
dots. Add a new multi-block for every new wafer
conguration. The multi-blocks can be named in
the same way as levels and valves (clicking twice).
Cartridges are added to a multi-block in the same
way that they are to valves (click, then drag and
drop). However, you will be prompted for how
many of this particular cartridge you wish to add
to the wafer and the summarized ow of the
cartridges will be added to the wafer. The multi-
plied cartridges will function as one, so in case
of alterations of numbers, the old cartridges will
need to be deleted (right-click and choose delete)
and new cartridges must be added. Adding an-
other cartridge to a wafer will not overwrite the old
cartridge(-s), but simply add the new cartridge to
thelistandtheowofthecartridgetothetotalow
of the wafer.
Whenthe waferis nished,it canbe addedto a
valve in the project tree like every other valve (click
then drag and drop). However as soon as a wafer
is added to a project, it is locked for further altera-
tions.
By clicking on each cartridge (type) in the wafer,
the cartridges can be checked to verify the ow
(which is shown in the lower part of the multi-block
window).
Exporting to/importing from FAC6HP.
When the project is ready to use, you can export it
to a commissioning meter thus:
1. Have the relevant project open in the program.
2. Turn on the commissioning meter and connect
it with the USB cable.
3. Press the export button (with the red arrows)
and choose “Yes” when prompted.
4. Wait while the project is transferred, then press
“OK”.
5. Now you can turn off the commissioning meter
and remove the USB cable.
To use the project in the memory of the commis-
sioning meter, please follow the notes in the general
instruction for the FAC6HP commissioning meter
in the chapter on memory and the section about
repeating measurements.
A project can also be imported from the commis-
sioning meter thus:
1. Have the program open.
2. Turn on the commissioning meter and connect
it with the USB cable.
3. Press the import button either from the quick
start or from the button with the blue arrow
(above an open project).
4. When prompted, choose a name for the project.
5. The setup will now be the same as for projects
made in the program, but the column “D.P.” will
be updated with the measured differential pres-
sures and the column “Auto Flow” with the sub-
sequentowrate.