Introduction
Please read this entire service guide prior to
beginning installation.
The CommPro Series commercial reverse osmosis system has been designed for quick
and simple installation and maintenance. By carefully reading this instruction manual
and following the operational guidelines you will insure a successful installation and reli-
able operation. Routine maintenance is essential to the longevity and performance of
the system.
CONDITIONS FOR OPERATION
CAUTION
(2)
Do not use this system where the water is microbiologically unsafe or of unknown quality.
Adequate pretreatment must be installed to remove organic and inorganic contaminants
that may lead to membrane fouling.
Disconnect the electrical power and turn off feed water supply before servicing the unit
Never allow the pump to run dry.
Do not run the system with waste or recycle valves fully closed.
•
•
•
•
DesignT
emperature77°F Max.TurbidityNTU^1
Max. Feed Temperature 85 °F Max. Free Chlorine ppm 0
Min.
.
Feed Temperature 40°F Max TDS ppm 2,000
Max.Ambient Temperature 120°F Max.Hardness GPG ^^ 1
Min.Ambient Temperature 40°F Max.pH(Continuous)11
Max. Feed Pressure PSI 85 Min
.pH(Continuous) 3
Min. Feed Pressure PSI 45Max. pH(Cleaning 30 Min.) 12
Max. Operating Pressure PSI 150 Min. pH(Cleaning 30 Min.)2
Max.S
DI Rating <3
Test Parameters:
Static pressure test for 5 minutes.
^Appropriate filtration must be installed in order to prevent premature membrane fouling.
^^ Scale prevention measures must be taken to prolong membrane life.
CAUTION
•

Specifications
(3)
COMMPRO MODEL# XPRO-2500D XPRO-5000D XPRO-7500D XPRO-10000D XPRO-15000D
System Design
Treatment Configuration Single Pass Single Pass Single Pass Single Pass Single Pass
Feed Water Quality TDS < 2,000 TDS < 2,000 TDS < 2,000 TDS < 2,000 TDS < 2,000
Recovery with Recycle* 35%-50% 35%-50% 50%-75% 50%-75% 50%-75%
Rejection and Flow Rates*
Nominal Salt Reduction 98.50% 98.50% 98.50% 98.50% 98.50%
Permeate Flow Rate 1.8 gpm 3.5 gpm 5.4 gpm 7.1 gpm 10.5 gpm
Concentrate Flow Rate 2.0 gpm 3.2 gpm 4.5 gpm 6.0 gpm 8.0 gpm
Concentrate Recycle Flow Rate Up to 2.0 gpm Up to 2.0 gpm Up to 5.0 gpm Up to 5.0 gpm Up to 5.0 gpm
Water Connections
Feed Connection 3/4” CTS QC 3/4” CTS QC 1” CTS QC 1” CTS QC 1” CTS QC
Permeate Connection 1/2” QC 1/2” QC 3/4” QC 3/4” QC 3/4” QC
Concentrate Connection 1/2” QC 1/2” QC 3/4” QC 3/4” QC 3/4” QC
Membrane Elements
Membrane Quantity 1 2 3 4 6
Membrane Size 4” x 40” 4” x 40” 4” x 40” 4” x 40” 4” x 40”
Booster Pumps
Pump Type Multi-Stage Multi-Stage Multi-Stage Multi-Stage Multi-Stage
Motor HP 1/2 HP 3/4 HP 1 HP 1.5 HP 1.5 HP
RPM @ 60 HZ 3450 3450 3450 3450 3450
Electrical Specifications
Standard Voltage 110 1ph 60hz 110 1ph 60hz 220v 1ph 60hz 220v 1ph 60hz 220v 1ph 60hz
Safety Factor (SF) Amps 12.4 14.5 9 13 13
Weight and Dems*
Shipping Weight 135lb 150lb 225 lbs. 240 lbs. 255 lbs.
Approx. Dimensions (L x W x
H)
27” x 25” x 56” 27” x 25” x 56” 30” x 35” x 56” 30” x 35” x 56” 30” x 35” x 56”
*Based on internal testing, actual results may vary.
Operating Parameters
Design Temperature 77°F Max. Turbidity NTU^ 1
Max. Feed Temperature 85°F Max Free Chlorine ppm 0
Min. Feed Temperature 40°F Max. TDS ppm 2,000
Max. Ambient Temperature 120°F Max. Hardness GPC ^^ 1
Min. Ambient Temperature 40°F Max. ph (Continuous) 11
Max. Feed Pressure psi 85 Min. ph (Continuous) 3
Min. Feed Pressure psi 45 Max. ph (Cleaning 30 Min.) 12
Max. Operating Pressure psi 150 Max. ph (Cleaning 30 Min.) 2
Max. SDI Rating <3
Test Parameters: Static pressure test for 5 minutes.
^ Appropriate filtration must be installed in order to prevent premature membrane fouling.
^^ Scale prevention measures must be taken to prolong membrane life.

System Diagrams
1
2
3
4
5
6
7
8
9
10
11
1) DM-2 * INLINE DUAL TDS METER
2) CHIP-V RO CONTROLLER; VERTICAL
3) AFM-055 PANEL FLOWMETER C/W CONTROL
4) PG-100-PC PANEL MOUNT GAUGE; 0-100 PSI
5) S211YF02NPEG5 FEED SOLENOID; 3/4" N/C 120VAC
6) PSEI012826E JG 3/4" CTS X 3/4" NPT MALE CONNECTOR, BLACK
7) PFM-055 PANEL FLOWMETER
8) 40L30N-1W * 4"X40" CODELINE FRP VESSEL; 300PSI; EP; WH
MH-4040SS.C ** 4X40 SS PRESSURE VESSEL
9) PG-300-PC PANEL MOUNT GAUGE; 0-300 PSI
10) 150233 20" BIG BLUE HOUSING BL/BK W/PR
11) FF-36" FALCON 3/4x3/4 FPT; SS FLEX CONN; 36"L
(4)
* Deluxe models only (2600-D & 5200-D)
** Basic models only (2600-B & 5200-B)

12
13
14
15
(5)
(1)
(1)
12) 95880505 *** 5FBT05C4 - 5GPM; 1/2 HP 120V; PUMP AND MOTOR
95880710 **** 7FBT07C4 - 7GPM; 3/4 HP 120V; PUMP AND MOTOR
13) WPS-4-4MF-3-7-30-15 LOW PRESSURE SWITCH; 30-15 PSI
14) ACV15 PRODUCT CHECK VALVE; 1/2" FPT
15) S211YF02NPDG4 * FLUSH SOLENOID; 1/2" N/C 120V
Items Not Shown:
x) C-4010 DIN CONNECTOR (required for all solenoid valves)
x) 1227868-V-BB VX05-20" BB 5M SEDIMENT CARTRIDGE
x) 3056683 MEMBRANE AK-90LE; 4X40; HR;ULE; 2800GPD; 110PSI
x) 144368 SW-4; WRENCH FOR 20" BB
* Deluxe models only (2600-D & 5200-D)
*** Single membrane units (2600-B & 2600-D)
**** Dual membrane systems (5200-B & 5200-D)

System Installation Instructions
1. Feed Water Supply
The 3/4" CTS push to connect fitting for the feed water supply is connected
to the solenoid on the inlet side of the pre-filter.
NOTE: Minimum line size for the feed line is 3/4" with a minimum pressure
of 45 PSI not to exceed 85 PSI.
To Connect
- Cut the pipe square, removing all burrs and sharp edges.
- Insert pipe fully into fitting.
- Turn locking cap quarter turn clockwise to locked position; an audible
click will be heard; indicator marks will be aligned.
To Disconnect
- Depressurize the system.
- Turn locking cap quarter turn counter-clockwise.
- Depress collet against fitting and remove the pipe.
Inlet Solenoid
Feed connector
(6)
(1)

3. Concentrate (Waste Water) Connection
The 1/2" O.D. push to connect fitting is
connected to the outlet of the flowmeter
labelled "Concentrate".
Run the drain line in 1/2" O.D. tubing
to an open drain, ensuring that the
drain is free and unobstructed.
Drain connection to be made in
accordance to local plumbing codes.
4. Auto-Flush Drain Connection
(Deluxe Models Only)
The 1/2" O.D. push to connect
2. Permeate (Product Water) Connection
Locate the 1/2" O.D. push to connect fitting connected to the check
valve located on the outlet (top) side of the permeate water flow meter.
The permeate line should be connected to the storage tank by 1/2" O.D.
poly tubing or other suitable material.
System rear view
Product check
valve
Permeate
Concentrate
fitting for the auto-flush is on the
outlet of the 1/2" flush solenoid.
Run this drain to an open drain via a 1/2"
O.D. drain line.
This drain needs to be separate from the
1/2" concentrate drain line.
(7)

Tank Level Control5.
All CommPro-Series systems are pre-
wired for a tank level control (not
included).
Tank level control needs to be a normally
closed switch (open connection in the
tank full position shut the system down).
5' of wiring is included with the system.
NOTE: Tank level control needs to only act as
a dry contact.
6. Pretreatment Lockout
CommPro-Series systems are also wired for pretreatment lockout,
allowing the system to be shut down while critical equipment installed
ahead of it is backwashed/regenerated.
5' of system wire is attached to the system controller and can be
connected to either a micro switch or relay installed on the
pretreatment equipment.
The lockout wire needs to be connected to the terminals on the micro
switch or relay that provide an open contact in the service position and
a closed contact while in backwash.
NOTE: Pretreatment lockout does NOT need to be installed. If it is not
required simply leave the two leads unconnected.
7. Electrical
CommPro-Series systems are wired for 110 VAC 60 HZ.
A suitable 15 amp dedicated circuit needs to be provided.
If required, have a licensed electrician install a suitable power outlet
at the install location.
(8)

Membrane Loading Instructions
CommPro-Series systems are shipped without the membrane installed in the
membrane pressure vessels. Membranes are left in their original packaging increasing
the time frame the system can sit before installation.
NOTE: Membranes must be loaded correctly. The brine seal on the membrane needs
to be on the same side of the membrane housing as the feed water connection.
For ease of service, all membrane vessels on CommPro-Series are plumbed so
that they are fed from the top allowing the membranes to also be loaded from
the top.
Please refer to the loading procedure below for initial installation and future
replacement of the membranes.
1. End Cap Removal
A) Basic Models with Stainless Membrane Housings (2600-B & 5200-B)
Remove the red locking clip from the
push to connect fitting and remove tubing.
Remove the two bolts holding the upper
band clamp together.
Gently pull up on the black plastic cap to
remove it from the stainless housing.
B) Deluxe Models with Codeline Membrane Housings (2600-D & 5200-D)
Using your fore finger in the end of the tab of the
retaining ring, lift it up and out of the groove in the shell.
Remove the ring from the groove in the shell by rotating
your finger behind the ring as it continues to exit the
groove.
Thread a 1/2" threaded pipe nipple into the center port
and carefully rock the head assembly to release the seal.
Once the seal is broken, pull straight outward to remove
the head assembly from the vessel.
Remove the red locking clip from the
push to connect fitting and remove tubing.
(9)

Membrane Installation2.
Carefully remove membrane from the packaging.
Note which end of the membrane that the brine
seal is installed on as the membrane will need to
be installed so that this is at the top of the vessel.
With a smooth and constant motion, push the
Brine seal
membrane into the housing. You will feel some
resistance as the membrane product tube seals
into the bottom end cap.
Install the end caps back into the housing and
reconnect any fittings that had been disconnected.
NOTE: Should it be necessary to lubricate any of the seals or o-rings, a
food grade silicon based product can be used. Never use petroleum based
lubricants.
NOTE: Membranes must be flushed for at least 30 minutes prior to be being
used. During this time all permeate must be discarded.
(10)
Questo manuale è adatto per i seguenti modelli
5
Indice
Altri manuali HM Digital Strumento di misura

HM Digital
HM Digital COM-300 Manuale utente

HM Digital
HM Digital TDS-3 Manuale utente

HM Digital
HM Digital COM-100 Manuale utente

HM Digital
HM Digital FLM-3 Manuale utente

HM Digital
HM Digital COM-100 Manuale utente

HM Digital
HM Digital PH-200 Manuale utente

HM Digital
HM Digital DM-1 Manuale utente

HM Digital
HM Digital HydroMaster HM-500 Manuale utente