
4 von 54
Version 2.0 (04/2019) Online
Translation of the original operating manual
Inhalt
3.6 Meaning of the LEDs 20
3.7 DIP switches 21
3.8 Meaning of signals 22
ZONE_STATUS 22
3.9 Dimensions 22
4 Transport and storage 23
4.1 Transport 23
4.2 Storage 23
5 Assembly and installation 24
5.1 Warning notices for installation 24
5.2 Assembling the ZoneControl 24
5.3 Warning notices for electrical installation 25
5.4 Electrical installation 26
Required cables: 26
Signal status of inputs 28
Signal status of outputs 28
Schematics of all outputs 28
5.5 Sensors 29
5.6 Inputs and outputs 30
RollerDrive connection: 8 mm snap-in, 5-pin, pin location in accordance with DIN EN 61076-2 30
Start sensor connector: WAGO 733-103 mating plug 30
Zone sensor connector: WAGO 733-103 mating plug 31
Upstream peer-to-peer connection: RJ45 socket, 8-pin Molex 43860 31
Power supply connector: WAGO 734-102 mating plug 32
Inputs/outputs connector: WAGO 733-108 mating plug 32
Downstream peer-to-peer connector: RJ45 socket, 8-pin Molex 43860 33
5.7 Wiring diagrams 34
ZoneControl within the conveyor section 34
ZoneControl at the start of the conveyor section 35
ZoneControl at the end of the conveyor section 36
Connection of the external speed control 37
Connection of a second RollerDrive 38
6 Initial startup and operation 39