Laguna Tools Smartshop Composite Fabricator 16 Manuale utente

Features:
•Huge machining area 5′ x
16′ —1500mm x 4800mm
*Custom sizes available
•Unique Pressure “Shoe”
design for optimum depth
accuracy- even if the panel is
not completely flat
•Helical Rack and Pinon
drives on X and Y axes. Ball
screw on Z axes
•1,2 and 3 spindle design.
Also available with ATC
spindle.
•(3) 6HP Italian HSD spindles
shown on machine below.
Smartshop (SUV II) Composite Fabricator 16
2021
© 2021, Laguna Tools, Inc. LAGUNA® and the LAGUNA Logo® are the registered trademarks of Laguna Tools, Inc. All rights reserved.

Table of Contents
Receiving and CNC Introduction: Pg. 4.
Machine Set-Up: Pg. 5-8.
Parts and Main Components of the Smartshop (SUVII) Composite Fabricator: Pg. 9-10.
Glossary of Main Components of the Smartshop (SUVII) Composite: Pg. 11-12.
More & Additional Safety Information for CNC Machine: Pg. 13.
Machine Set-Up: Pg. 14-15.
Fitting the Router Bit into the Router Head: Pg. 16-17.
Machine Operation: Pg. 18.
Manual Tool Release: Pg. 19.
Types of Router Bits: Pg.20-22.
Water Pump Assembly Protocol: Pg. 23-24.
Tool Clips: Pg. 26.
Automatic Tool Contact Button or Tool Touch Off: Pg. 27
From “Set-Up” Screen to CNC Tool Data: Pg. 28.
Electrical Cabinet & Control Panel: Pg. 29.
Turning on the Machine: Pg. 30-31.
Main Screen Button(s) & Flow: Pg. 32.
Main / Home Screen Defined: Pg.33-36.
Main Screen Buttons & Flow to proceed to CNC Positions: Pg. 37.
Loading a Program into the Machine: Pg. 38-42.
Activate Start Program/File in the Machine: Pg. 43.

Table of Contents
Using the Vacuum Table & Vacuum Zones: Pg. 44-45.
Fitting the Foam Rubber Gasket: Pg. 46-49
Spoil Board Material and Precautions: Pg. 50.
Securing Job to Table: Pg. 51.
Maintenance & Trouble Shooting: Pg. 52.
Schematics: Pg. 53-66.
Machine Set-Up: Pg. 67-68.
Delivery Protocol: Pg. 69.
Warranties: Pg. 70-73.
Laguna Tools Packaging/RMA Procedures: Pg. 74.
Laguna Tools Packaging/Laguna Tools RMA Example: Pg. 75.
Laguna Tools Packaging/Laguna Tools BILL of LADING Example: Pg. 76.

Receiving and CNC Introduction:
Receiving the Machine:
Note: It is probable that your machine will be delivered by a third party. Before you unpack your new machine, you
will need to first inspect the packing, invoice, and shipping documents, supplied by the driver. Ensure that there is
no visible damage to the packing, or the machine. You need to do this prior to the driver leaving. All damage must
be noted on the delivery documents and signed by you and the delivery driver. You must then contact the seller,
Laguna Tools, within 24 hours. It is probable that you will find sawdust on your Smartshop II. Laguna endeavors to
test all machines prior to shipping.
Introduction to CNC Machines:
The CNC is designed to give you years of safe service. Read this Owner’s Manual in its entirety before assembly or
use. The advantage of the CNC machine is that it can, in most cases, fully machine the complete job without it being
removed from the table so that you have finished parts of high accuracy that are totally repeatable. It can also
produce intricate carvings with the purchase of the relevant software. Nesting is also a valuable feature of CNC
machining that saves on waste and costs. It is possible to reduce the amount of different machines in the shop, as
the CNC will perform a multiple of functions and is a must for cabinet makers and serious woodworkers.

5
Machine Set-Up:
CNC Machine (SUV II) CF 16: Machine Set-Up
IMPORTANT: In order for installation to be efficient and cost effective we require several items to be completed PRIOR to our Technician’s arrival.
Should you have any questions please feel free to call our Customer Service at 1-800-234-1976 or contact your Sales Representative.
Following are the steps you have to perform in order for us to schedule the set-up/training-
1.) Remove all protective coating and packaging.
2.) Check if machine has all the tooling (Tools, Bits, Kits, etc.) components that were placed in your order.
3.) Make sure your building/shop have appropriate electrical voltage and amperage per machine(s).
*Electricians and service staff are welcome to contact our Customer Service if they have any questions.
4.) Make sure the main power & vacuum pumps can be connected to the cabinet.
5.) Make sure the machine(s) are leveled with the leveling feet installed.
6.) Clean dry air is vital for the machine(s) performance. Make sure the clean dry compressed air is attached to the machine(s).

6
Machine Set-Up (Cont’d.):
Should a technician representing Laguna Tools not be able to come to the site and work on the machines due to the lack of
preparedness or inoperable equipment per the above and/or beyond Laguna Tools control any expenses incurred will be passed
on to you. The customer will cover all expenses incurred during set up and training on the proper use of the machine(s) including
but not limited to: Airfare, Rental Car, Hotel, Parking and/or Toll Fees per Diem, plus $115.50 per hour.
The above points have been read and understood, and the customer will be responsible for any delay and agrees to reimburse
Laguna Tools for any additional expenses incurred.
7.) Prepare adequate supply of materials for practice cutting as well as several 3⁄4” MDF sheets for use as spoil boards (Material
to be cut and tested on).
8.) Has the person to be trained to work on the machine(s) by our technician read all the instruction manuals prior to set-
up/training?
9.) Make sure the Associates has been trained in the software prior to set-up/training.

7
Machine Set-Up (Cont’d.):
CNC Machine (SUV II) CF 16: Machine Set-Up
IMPORTANT: In order for installation to be efficient and cost effective we require several items to be completed PRIOR to our Technician’s arrival.
Should you have any questions please feel free to call our Customer Service at 1-800-234-1976 or contact your Sales Representative.
Following are the steps you have to perform in order for us to schedule the set-up/training-
1.) Remove all protective coating and packaging.
2.) Check if machine has all the tooling (Tools, Bits, Kits, etc.) components that were placed in your order.
3.) Make sure your building/shop have appropriate electrical voltage and amperage per machine(s).
*Electricians and service staff are welcome to contact our Customer Service if they have any questions.
4.) Make sure the main power & vacuum pumps can be connected to the cabinet.
5.) Make sure the machine(s) are leveled with the leveling feet installed.
6.) Clean dry air is vital for the machine(s) performance. Make sure the clean dry compressed air is attached to the machine(s).

8
Machine Set-Up (Cont’d.):
Should a technician representing Laguna Tools not be able to come to the site and work on the machines due to the lack of
preparedness or inoperable equipment per the above and/or beyond Laguna Tools control any expenses incurred will be passed
on to you. The customer will cover all expenses incurred during set up and training on the proper use of the machine(s) including
but not limited to: Airfare, Rental Car, Hotel, Parking and/or Toll Fees per Diem, plus $115.50 per hour.
The above points have been read and understood, and the customer will be responsible for any delay and agrees to reimburse
Laguna Tools for any additional expenses incurred.
7.) Prepare adequate supply of materials for practice cutting as well as several 3⁄4” MDF sheets for use as spoil boards (Material
to be cut and tested on).
8.) Has the person to be trained to work on the machine(s) by our technician read all the instruction manuals prior to set-
up/training?
9.) Make sure the Associates has been trained in the software prior to set-up/training.

Parts and Main Components of the Smartshop (SUVII) Composite Fabricator-
Gantry
Vacuum Table
& Bed
Frame
Vacuum Controls
Foot w/Foot Level
Caterpillar
Track
Caterpillar
Track

Parts and Main Components of the Smartshop (SUVII) Composite Fabricator (Cont’d.)-
Tool Changer/Clips
Dust Collector Air Regulator System
Work Locator Pins
Green Spindle
Release Button
Clamp & T-Slot
Electrical Cabinet &
Control Panel
Seal Gaskets for
Vacuum Bed
Questo manuale è adatto per i seguenti modelli
1
Indice
Altri manuali Laguna Tools Sistema di controllo






















