Copyright 2010 - Microener
INDEX
1 General utilization and commissioning directions __________________________________________4
1.1 Storage and transportation__________________________________________________________ 4
1.2 Installation_______________________________________________________________________ 4
1.3 Electrical connection_______________________________________________________________ 4
1.4 Measuring inputs and power supply___________________________________________________ 4
1.5 Outputs loading___________________________________________________________________ 4
1.6 Protection earthing_________________________________________________________________4
1.7 Setting and calibration______________________________________________________________ 4
1.8 Safety protection__________________________________________________________________ 4
1.9 Handling_________________________________________________________________________4
1.10 Maintenance_____________________________________________________________________ 5
1.11 Fault detection and repair___________________________________________________________ 5
2 General characteristics and operation____________________________________________________ 5
2.1 Power supply_____________________________________________________________________ 5
2.2 Measuring input___________________________________________________________________ 6
2.3 Algorithms of the different functions___________________________________________________ 7
2.3.1 Setting range of the reference input quantities______________________________________ 7
2.3.2 F50/51 Dual level 3-phase overcurrent with or without________________________________ 7
2.3.3 Voltage controlled overcurrent___________________________________________________8
2.3.4 F46 Current unbalance________________________________________________________ 9
2.3.5 F32 Reverse Power___________________________________________________________9
2.3.6 F40 Loss of excitation: capacitive underimpedance Zc<_______________________________10
2.3.7 F27-59 Dual level 3-phase over/under voltage______________________________________ 11
2.3.8 F81 Dual level over/under frequency______________________________________________12
2.3.9 F49 Thermal overload_________________________________________________________ 13
2.3.10 F37 Underpower W<__________________________________________________________ 13
2.3.11 F21 Dual level under impedance_________________________________________________14
2.3.12 F24 Dual level overfluxing______________________________________________________ 14
2.3.13 F64S 95% Stator earth fault element_____________________________________________ 15
2.3.14 F64S 95% Stator earth fault element _____________________________________________ 15
2.3.15 F60FL PT Fuse Failure________________________________________________________ 16
2.3.16 F50/27 Inadvertent generator energization_________________________________________ 16
2.3.17 F50BF Breaker failure protection___ _____________________________________________ 16
2.4 Clock and Calendar________________________________________________________________ 17
2.4.1 Clock synchronization__________________________________________________________ 17
2.4.2 Date and time setting__________________________________________________________ 17
2.4.3 Time resolution_______________________________________________________________ 17
2.4.4 Operation during power off______________________________________________________ 17
2.4.5 Time tolerance_______________________________________________________________ 17
3 Controls and measurements____________________________________________________________ 18
4 Signalization_________________________________________________________________________ 19
5 Output relays_________________________________________________________________________20
6 Serial communication__________________________________________________________________21
7 Digital inputs_________________________________________________________________________22
8 Test________________________________________________________________________________ 22
9 Keyboard and display operation_________________________________________________________ 23
10 Reading of measurements and recorded parameters________________________________________24
10.1 ACT. MEAS (Actual measure)___________________________________________________ 24
10.2 MAX VAL (Max values)_______________________________________________________24
10.3 LASTTRIP (Last trip)_________________________________________________________ 25
10.4 TRIP NUM (Trip number)______________________________________________________ 26
11 Reading of programmed settings and relay’s configuration__________________________________ 26