Vicon ViconNet Nucleus Manuale utente

www.vicon-security.com
Installation & Conguration Guide
XX239-00-00
ViconNet Nucleus
Vicon Industries Inc. does not warrant that the functions contained in this equipment will meet your requirements or that the
operation will be entirely error free or perform precisely as described in the documentation. This system has not been designed
to be used in life-critical situations and must not be used for this purpose.
Vicon Industries Inc., 89 Arkay Drive, Hauppauge, New York 11788
Tel: 631-952-2288 Fax: 631-951-2288 Toll Free: 800-645-9116
24-Hour Technical Support: 800-34-VICON (800-348-4266) UK: 44/(0) 1489-566300
Document Number: 8009-8239-00-00
Product specications subject to change without notice.
Issued: 711
Copyright © 2011 Vicon Industries Inc. All rights reserved.

ViconNet Nucleus Installation & Configuration
Guide
Topic Page
General 3
Hardware Installation 4
Accessory Kit 4
Unpacking and Inspection 5
Unpacking the Unit 5
Required Items for Installation 5
Unit Components 6
Mounting 7
Installing the VN-NUC-SYSTEM 8
Operation 10
Powering On the Unit 10
Powering Off the Unit 10
Using the ViconNet Application 11
Accessing the Configuration Functions 11
Registering Your System 13
Modifying the System Configuration 14
Shipping Instructions 22
Technical Information 23
Vicon, ViconNet, and their logos are registered trademarks of Vicon Industries Inc.
Windows is a registered trademark of Microsoft Corporation. Other company and brand products and service names
are trademarks or registered trademarks of their respective holders

ViconNet Nucleus Installation and Configuration Guide | 3
General
This manual provides information for installing the ViconNet standalone
Nucleus preinstalled on a PC. It is available as a rack-mount unit, VN-NUC-
SYSTEM-R, but will also be available as a tower if required, VN-NUC-
SYSTEM. The term VN-NUC-SYSTEM is used in this manual to refer to both
units unless specifically stated otherwise.
This manual focuses installing this Nucleus unit in a ViconNet system. Refer
to the ViconNet software manual for details on setting up ViconNet. The
Nucleus software, VN-NUC-SWV6, is available and can be installed on a PC
that meets the minimum requirements.
PC Minimum Requirements:
Operating System: Microsoft® Windows® XP, 7, 2003 or 2008 Server.
CPU: Intel® Core™ 2 Duo 2.66 GHz processor.
RAM: 2 GB.
Hard Drive: 250 GB minimum.
LAN Card: 1 Gb.
Video Card: Recommended video adapter with onboard 128 MB RAM.

4| ViconNet Nucleus Installation and Configuration Guide
Hardware Installation
This system should only be installed by a qualified technician using common
hand tools and approved materials in accordance with the National Electrical
Code ANSI/NFPA 70, state and local wiring codes.
The rack-mount model, VN-NUC-SYSTEM-R is a 1 RU unit; the VN-NUC-
SYSTEM is a desk-top unit. These units meet requirements for an FCC Class
A computing device and CE
Vicon requires the use of line conditioners, voltage regulators and
uninterruptible power supply (UPS) systems in the electrical power service.
Note
Read all instructions before beginning the installation.
Accessory Kit
The provided accessory kit contains necessary items needed to install and
wire the unit during installation:
Table 1: Accessory Kit
Part Description
CD and Manuals Provides documentation and software (including current
drivers)
Front Door Key Opens the front panel door
Keyboard (with USB
adapter) Used for GUI operation of the ViconNet software
Optical Mouse (with USB
adapter) Used for GUI operation of the ViconNet software
Power Cord Used for power connection
Rail Kit For rack mounting the VN-NUC-SYSTEM-R

ViconNet Nucleus Installation and Configuration Guide | 5
Unpacking and Inspection
All Vicon equipment is tested and inspected before leaving the factory. It is
the carrier’s responsibility to provide suitable delivery.
Inspect the cartons upon delivery and, if damage is present, make detailed
notes on the carrier’s bill. Then, obtain the carrier agent’s signature and file a
damage claim as soon as possible.
Open the cartons and inspect the equipment for damage. Save the cartons
and packing material. If damage is present, contact the carrier and file a
damage claim immediately. If the equipment must be returned for repair,
follow the Shipping Instructions at the end of this manual.
Unpacking the Unit
Carefully open the carton. Remove the accessory kit and the VN-NUC-
SYSTEM from the box and place them on a large, flat working surface. Open
the accessory kit and verify the contents against the list in Table 1.
Required Items for Installation
To properly install the VN-NUC-SYSTEM there must be simple hand tools
available such as a screwdriver, wrenches, pliers and wire cutters/strippers.
To setup for operation there must be a keyboard and a mouse available to
operate the GUI. These are included with the unit.

6| ViconNet Nucleus Installation and Configuration Guide
Unit Components
This section describes the VN-NYC-SYSTEM-R front and rear panels.
Front Panel Controls and Connections
•Power Switch: Used to power on the unit.
•Power LED Indicator: Blue LED used to display the power status (ON
means unit on and OFF means unit off).
•DVD Drive: Used as a high-capacity removable data drive.
•LED Viewing Holes: Used to view the status of the LEDs without opening
the front door.
•Front Door: Used to protect the front panel from unauthorized use.
•Keyed Lock: Used with the provided key to lock the front door.
•HDD LED: Red LED, blinks when disk is in use.
•USB Ports: Used for optional devices.
Rear Panel Controls and Connections
•Speaker Output: Mini phono-type connector used for audio output.
•Power Receptacle: Used to connect the provided power cable.
•Keyboard Port: USB connector used to connect a standard PC keyboard
(included).

ViconNet Nucleus Installation and Configuration Guide | 7
•Mouse Port: USB connector used to connect the provided optical mouse
(included).
•USB Connectors: Used for optional devices (4).
•Network Port: RJ-45 connectors; use to connect to a LAN/WAN (100/1000
Base T).
Mounting
There are two types of mounting, depending on the model, either desktop
(tower) or rack.
Desktop
The desk or table must provide a surface of suitable strength for the unit’s
weight. In addition, there must be area left around the cabinet to provide
suitable airflow for cooling. Do not place heavy items on the cover.
Rack
The rack-mount model was designed to be mounted in a standard 19-inch
(483 mm) wide vertical rack. Use the rack mount ears and hardware provided
with the rail kit to connect the unit to the rack. Handles are installed for ease
of installation. A rail mounting kit is included to provide extra support for the
unit in the rack. This rail kit MUST be used. Installation instructions are
provided on how to use this kit.
It is recommended that at least 1 RU of space [1.75 in. (44.45 mm)] be left in
between multiple recorders mounted in the same rack for cooling purposes.
Warning
Failure to leave space for cooling between recorders may result in
malfunctioning and possible failure of the unit.

8| ViconNet Nucleus Installation and Configuration Guide
Installing the VN-NUC-SYSTEM
After the unit is mounted permanently, follow the steps in this section to
install the hardware.
•Step 1: Connecting the Hardware, below
•Step 2: Connecting the Power Supply
Important Notes
The connection of external hardware may require simple hand tools. Do not
apply power or plug-in the unit to any outlet until instructed to do so.
Disable the AC power to prevent installer injury and damage to the unit.
Before beginning the hardware installation, ensure that the following
environmental conditions have been met:
•The surface on which the ViconNet hardware is to be placed must be
level.
•The room or area designated for the ViconNet hardware installation
must be well ventilated.
Step 1: Connecting the Hardware
This procedure describes the various hardware connections that must be
performed in order to operate the system.
1. Perform the following connections: (refer to Front and Rear Panel diagrams).
1.1 Locate the keyboard on a flat surface near the unit. Connect the
keyboard by inserting its connector into the correct port.
1.2 Locate the mouse on a flat surface near the unit. Connect the mouse by
inserting its connector into the correct port.
1.3 Position the monitor in a permanent fixed location near the unit. Connect
the monitor by inserting its VGA or HDMI connector into the VGA Monitor
Output or HDMI port.
1.4 Insert one side of a standard LAN cable to the Network Port’s RJ-45
connector. Insert the other RJ-45 connector into the LAN side of the
network.
1.5 Connect external hardware devices to the relevant terminal.
1.6 Insert the female end of the provided 120 VAC Power Cable into the
unit's Power Receptacle. Do not connect the remaining end to a power
receptacle until instructed. If using 230 VAC power, it is necessary to
obtain a suitable power cord for use. This cable is a standard computer
230 VAC power cord.
2. Connect the monitor to the power source and power on.

ViconNet Nucleus Installation and Configuration Guide | 9
Step 2: Connecting the Power Supply
To ensure that the unit is protected during a power failure and that no
important data is lost, it must be connected to an uninterruptible power
source (UPS) before use.
To connect the UPS:
1. Connect the power cord to the UPS power receptacle.
2. Connect the UPS power cord to the wall outlet.
3. Power on the UPS and ensure that it is working properly.
Note
Refer to your UPS device’s User Manual for a more detailed explanation of
how to connect it properly.

10 | ViconNet Nucleus Installation and Configuration Guide
Operation
Powering On the Unit
To power on the system:
With the unit set up as shown in Installation, open the front panel cabinet and
press the front panel pushbutton Power Switch. The button does not lock into
position; it remains in the out position, which is its default position, even when
the system is running.
Important
Do not press any keyboard buttons at this time.
When the unit completes booting, the Main Screen is displayed.
Powering Off the Unit
To power off the system:
With the unit booted and operational, press the Shutdown button in the Site
Setup window. Follow the screen prompts and the system returns to the
ViconNet desktop. Use the Start button to completely shutdown the system.
OR (this is not recommended, due to the possibility of data loss)
Momentarily press the power switch. The system switches off, component by
component.
Questo manuale è adatto per i seguenti modelli
2
Indice
Altri manuali Vicon Server
Vicon
Vicon Kollector Network Server Manuale utente
Vicon
Vicon VAX Server Micro Form Factor Manuale utente
Vicon
Vicon Shadow Premier 2U Manuale utente

Vicon
Vicon VALERUS SERIES Guida all'installazione
Vicon
Vicon Valerus Shadow Elite Manuale utente
Vicon
Vicon Valerus Shadow Elite Manuale utente
Vicon
Vicon KTX-4V2 Manuale utente

















