VVDN DT4CP-2U Manuale utente

© 2015 VVDN Technologies
All Rights Reserved
DT4CP-2U Storage Server
Quick Start Guide
Revision :A1

VVDN_DT4CP2U_Quick_Start_Guide Rev. A1
2
CONFIDENTIAL
Copyright Notice
This document is copyright of VVDN, All Rights Reserved. No part of this document, in whole or in part,
may be used, reproduced, stored in a retrieval system or transmitted, in any form, or by any means,
electronic or otherwise, including photocopying, reprinting, or recording, for any purpose, without the
express written permission of VVDN.
Legal Disclaimer
The information contained in this document is subject to change without notice. The information in this
document is provided for informational purposes only. VVDN Technologies specifically disclaims all
warranties, express or limited, including, but not limited, to the implied warranties of merchantability and
fitness for a particular purpose, except as provided for in a separate software license agreement.
The Open Server
The Open server provides an established framework to demonstrate the accelrated communication
process.It provide the solution for communication with higher network connectivity and powerful security
using encryption methodology.It offering powerful unified communication using scale-out and storage
option. The storage appliance is designed to provide features that include data compression, de-
duplication and encryption.
VVDN Technologies
VVDN Technologies Pvt Ltd is responsible for the design and development of all products . VVDN
provide end-to-end product design capability to its customer. Founded in 2007, VVDN is a technology
innovation and development company providing a broad spectrum of services and technology expertise to
our core domains. VVDN provides “Concept to Customer” services at any point in the development
cycle, as well as full turnkey solutions.
Correspondence
VVDN Technologies,
B-22, infocity sector- 34,
Gurgaon- 122001,
Haryana, India.
Email: info@vvdntech.com
Website: www.theopenservers.com

VVDN_DT4CP2U_Quick_Start_Guide Rev. A1
3
CONFIDENTIAL
Revision History:
Date
Rev No.
Description
By
29-April-2015
A0-01
2U Quick Start Guide -Initial Draft
VVDN
29-April-2015
A0-01
Updated:
(i) NOR FLASH
(ii) Rear View
VVDN

VVDN_DT4CP2U_Quick_Start_Guide Rev. A1
4
CONFIDENTIAL
Table of contents
1INTRODUCTION..............................................................................................................................................5
SYSTEM BOARD INTERFACE.............................................................................................................................51.1 TOP VIEW WITHOUT ADD ON CARD: ...............................................................................................................51.2 TOP VIEW :......................................................................................................................................................61.3 REAR VIEW:.....................................................................................................................................................71.4 FRONT VIEW:...................................................................................................................................................81.5 PCIE AND SAS INTERFACE:.............................................................................................................................91.6 SD CARD: ......................................................................................................................................................101.7 POWER ORING CARD: ....................................................................................................................................111.8 BOM DETAILS...............................................................................................................................................121.9
2BLOCK DIAGRAM ........................................................................................................................................13
3BOARD MANAGEMENT CONTROLLER (BMC)....................................................................................14
PREPARING BOARD:.......................................................................................................................................143.1 FEATURES ......................................................................................................................................................143.2 UPGRADING IMAGE ON BMC .........................................................................................................................143.33.3.1 Create tftp server.................................................................................................................................14
3.3.2 Network Configuration ........................................................................................................................15
STEPS TO FLASH THE IMAGE ON BMC............................................................................................................153.4
4T4240MFCS......................................................................................................................................................16
PREPARING BOARD ........................................................................................................................................164.1 FEATURES ......................................................................................................................................................164.2 PORT MAP......................................................................................................................................................174.3 NOR FLASH.................................................................................................................................................184.4 SWITCH SETTING FOR SERVER1AND SERVER2FOR NOR FLASH....................................................................194.5 NOR FLASH.................................................................................................................................................194.6 SWITCH SETTINGS AND SET UP CONFIGURATION............................................................................................204.74.7.1 Switch Default settings (SD Card boot)...............................................................................................21
PROGRAM SD CARD.......................................................................................................................................224.8 SD CARD IMAGE UPGRADE.............................................................................................................................234.9

VVDN_DT4CP2U_Quick_Start_Guide Rev. A1
5
CONFIDENTIAL
1Introduction
The Dual T4240 Storage server product will be built with Dual T4240 which is a communication
processor from Freescale. The T4240 QorIQ multicore processor combines 12 dual-threaded e6500
Power Architecture® processor cores for a total of 24 threads with high-performance datapath
acceleration logic and network and peripheral bus interfaces required for networking, telecom/datacom,
data center, storage applications, and wireless infrastructure applications. A Dual T4240 based Data
center Storage appliance, offering a powerful unified communication solution with up to 80G of external
network connectivity, SRIO inter-chip connectivity and multiple SAS HDD’s and PCIe based SSD’s. The
storage appliance is designed to provide features that include data compression, de-duplication and
encryption. The use case is Storage Virtualization as a Software Defined Storage (SDS) appliance.
System Board Interface1.1
The figure shows the top view of T4240mfcs system board interface.
Top View without Add On Card:1.2

VVDN_DT4CP2U_Quick_Start_Guide Rev. A1
6
CONFIDENTIAL
Top View :1.3

VVDN_DT4CP2U_Quick_Start_Guide Rev. A1
7
CONFIDENTIAL
Rear View:1.4

VVDN_DT4CP2U_Quick_Start_Guide Rev. A1
8
CONFIDENTIAL
Front View:1.5
Power button Sequence:
Press Power button, for right t4240 power off or power on release power button when power led is
blinking fast (3-6 seconds).
Press Power button, for left t4240 power off or power on release power button when power led is blinking
slow (9-12 second)
Reset button Sequence:
Press Reset button, for right t4240 reset release reset button when power led is blinking fast (3-6
seconds).
Press Reset button, for left t4240 reset release power button when power led is blinking slow (9-12
second)
Button
0-3 sec
3-6 sec (Fast
blink power led)
6-9 sec
9-12 sec (Slow
blink power led)
Power
No Action
Power off/on right
T4240
No Action
Power off/on left
T4240
Reset
No Action
Reset right T4240
No Action
Reset left T4240

VVDN_DT4CP2U_Quick_Start_Guide Rev. A1
9
CONFIDENTIAL
PCIe and SAS Interface:1.6

VVDN_DT4CP2U_Quick_Start_Guide Rev. A1
10
CONFIDENTIAL
SD Card:1.7