
-6-
Check List of Materials
AI-2410
Waltrons’ concern does not stop when your instrument leaves our loading dock. We
want to thank you for your confidence in Waltron., our product, and the service that we
provide. We want to make sure that your experience with us will be one of total
satisfaction starting with the condition in which you have received your product.
√ Inspect all shipping containers upon receipt and record any visible damage.
Count the number of packages, making sure that the number is in agreement
with the shipping paperwork. If there are any outward signs of damage,
please retain all containers and packages for inspection by carrier. It is
generally good practice to retain the packing material and boxes as they
make an excellent way to protect the instrument if you move it our ever need
to ship the instrument.
√ Make sure that all items received match the packing list. If you ordered
chemicals, they are usually shipped in a separate package and will be itemized
accordingly.
√ Verify that the number of packages received agrees with the package list
and shipping papers.
√ Notify both Waltron and the carrier, if any problems occur.
Important Notice
√ All Monitors in our range are inspected and tested prior to shipment
√ In normal use the units should operate correctly and without fault over a
long period of time requiring only minor maintenance, which should only
be carried out as outlined in this manual.
√ If electronic components are replaced, please note that due to varying
component characteristics it may be necessary to re-adjust or
calibrate the monitor.
√ Failure to carry out correct maintenance procedures could result in the monitor
over or under reading, which in turn could lead to oil pollution and
the consequences that follow.