Caldertech Squeeze 16 20 25 32 SDR 11 Manuale utente

1
Operating instructions and
specifications for
Squeeze Off Tool
Products by innovation not imitation
Pt
Models covered by this manual:
Squeeze 16 20 2 32 SDR 11
Squeeze 16/32 40 0 63 SDR 11
Squeeze 20 2 32 40 0 63 SDR 11
Squeeze 20 2 32 40 0 63 90 SDR11/17
Squeeze 63 90 SDR11/17 110 SDR17 12 SDR17
Helping you make the right conne
ctions™

2
INDEX.
Specifications ............................................ 4
General description .................................... 5
Safety Precautions .................................... 6
Instructions for use .................................. 7
ertificate of conformity ............................. 9
ertificate of calibration ............................. 10
Warranty information………………………………11

3

4
Specifications.
Materials: Mild Steel EN3A
Stainless Steel
Finish: Yellow and Silver zinc plated (Steel)
Powder coating
Dimensions:
Squeeze 16 20 25 32 SDR 11
(H x W x D) 210mm x 150mm x 55mm
Squeeze 20 25 32 40 50 63 SDR 11
(H x W x D) 275mm x 300mm x 60mm
Squeeze 55 63 75 90 SDR 11
(H x W x D) 350mm x 450mm x 75mm
Squeeze 20 25 32 40 50 63 SDR 11
(H x W x D) 210mm x 150mm x 55mm
Weight:
Squeeze 16 20 25 32 SDR 11 3.0Kg
Squeeze 16/32 40 50 63 SDR 11 4.5Kg
Squeeze 20 25 32 40 50 63 SDR 11 4.5Kg
Squeeze 55 63 75 90 SDR11/17 9Kg
Squeeze 63 90 SDR11/17 110 SDR17 125 SDR17 10.2Kg
Product ode:
Squeeze 16 20 25 32 SDR 11
Squeeze 16/32 40 50 63 SDR 11
Squeeze 20 25 32 40 50 63 SDR 11
Squeeze 55 63 75 90 SDR11/17
Squeeze 63 90 SDR11/17 110 SDR17 125 SDR17
This unit is design and manufactured to meet the requirements of
National Grid Gas Industry Standards GIS/PL2-7:2006 Part 7:
Squeeze-off tools and equipment.
aldervale Technology Ltd has a policy of continuous improvement
in product quality and design. aldervale Technology Ltd therefore

5
reserves the right to change the specification of its models at any
time, without prior notice.
Important!
This manual outlines the operation of the electrofusion tooling.
This manual forms a part of the product to which it relates. It
should be kept for the life of the product. Any amendments issued
by aldervale Technology Ltd should be incorporated in the text.
The manual should be passed to any subsequent holder or user of
this product.
General description.
The tool has been designed to limit the flow in P.E. pipe from
16mm to 63mm (dependant on model) SDR11 & SDR17 pipe work
in accordance with
Gas Industry Standard GIS/PL2-7:2006
Squeeze-off equipment.
Pipe is squeezed using a manually operated threaded ‘T-Bar’
actuator
The unit has rotating pre-sized limiting plates that are used to limit
the squeeze gap and prevent over compression.
It is the responsibility of the operator to ensure that the PE
pipe is suitable for squeeze off application if in doubt
contact the PE pipe manufacturer for confirmation

6
Safety
Precautions
1. This tool is designed to be used in conjunction with best
practices as stated in
Gas Industry Standard GIS/PL2-7:2006
Squeeze-off equipment.
2. It is imperative that all possible precautions are made to avoid
unexpected movement of the tool during use.
3. The tool should be used in pairs of 2 per side of the prospective
jointing area, spaced accordingly to avoid damage to the pipe, to
ensure adequate lock-off of material flow (see illustration (1)
below) using ‘best practice’ procedures (refer to local authority
recommendations & pipe manufacturer)
Repair Site
(1)(1)

7
Instructions for use.
Fitting
1. heck Pipe Diameter and SDR ratio. Set both LIMIT PLATES
(See Illustration (2) below) to appropriate sizes on all 4
Squeeze-Off Units. The correct orientation is with the required
size pointing towards the BOTTOM BAR
2. Remove the BOTTOM BAR from the tools. Place the frames
over the pipe to be squeezed, and reposition the BOTTOM
BARS ensuring that the pipe is contained between the
SQUEEZE BAR and the BOTTOM BAR
3.
Wind-down the ‘T-Bar’ until the LIMIT PLATES just come into
contact with the BOTTOM BAR (see illustration (2) below) The
pipe is now in a ‘squeezed off’ condition. Repeat for all units in
use
DO NOT ATTEMPT TO TIGHTEN FURTHER OR DAMAGE TO
THE PIPE AND THE TOOL MAY OCCUR!
Removal
After repairing/working on pipe, relax the threaded ‘T-Bar’ on all
units gradually to allow pipe to recover and medium to flow. When
fully clear of pipe, remove BOTTOM BAR and remove tools from
pipe.
7
(2)

8
Maintenance
lean Threaded ‘T-Bar’ screw threads after use, and re-
grease/lubricate at regular intervals (after every use)
DO NOT allow dirt, mud or other abrasive material to enter the
screw thread! Always wipe-off debris BEFORE tightening/un-
tightening threaded ‘T-Bar’.
Failure to observe this may affect any warranty claims due to the
specific use of this tooling (does not affect statutory rights).

9
EC DECLARATION OF CONFORMITY
MACHINERY SUPPLIER: Caldervale Technology Limited
SUPPLIER’S ADDRESS: Bretfield Court,
Dewsbury,
WF12 9DB,
UK
Declares that the Machinery described below:
Make: CTL
Product: Maxifuse™ Mechanical Squeeze Tools S1 & similar
Type: 16 20 25 32 SDR 11, 16/32 40 50 63 SDR 11, 20 25 32 40 50 63 SDR 11,
55 63 75 90 SDR11/17 & 63 90 SDR11/17 110 SDR17 125 SDR17
Reference No: 02-31-001, 02-31-004, 02-31-202, 02-31-401 & 02-31-801
Conforms to the following Directives:
98/37/EC Machinery (Safety) Regulations (as amended)
Meets the following standards:
Safety of Machinery
BS EN 12100: 2003, BS EN 982: 1996
Gas Industry Standard
GIS/PL2-7 Squeeze-off tools and equipment
Complies with, or is designed and constructed so far as is possible to comply with the relevant essential health
and safety requirements, taking into account the state of the art.
Modifications to the equipment without prior approval by the undersigned will render this Declaration null
& void
For and on behalf of the Manufacturer:
Signature:
G L Lilley
Gordon Lilley – Managing Director (CE Responsible Person)
Signed at: ……………………………………….. On: ……………………………. (Date)
Signature of this Declaration of Conformity authorises the manufacturer or his authorised representative in the
community to affix the CE Mark to the equipment

10
Certificate of calibration.
•This product has been inspected and tested in accordance with the
ISO9001 quality control systems and procedures in place at aldervale
Technology Ltd, Dewsbury.
•
This product has no calibration period, periodic, safety inspections
should be carried out by the operator if in any doubt please contact the
manufacturer for further information
Decommissioning & Disposal Instructions
These give the instructions for decommissioning and disposal of the equipment and
confirm how it is to be taken out of service safely, in respect of the Essential
Health and Safety Requirements.
•If a Maxifuse™ squeeze tool inclusive of the size ranges 16–125mm
has reached the end of its useful working life and cannot be
refurbished it must be disposed of through a licensed scrap or waste
disposal facility. Alternatively, a reverse engineering company could
be used to strip the equipment for recycling purposes.
•Disposal is the responsibility of the ustomer this can also be
achieved by returning the product back to the manufacturer
Questo manuale è adatto per i seguenti modelli
4
Indice
Altri manuali Caldertech Utensili



















